GR Catalyst One, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Stillwater Hydroelectric Project

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 24, 2026

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 184 (Thursday, September 24, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 184 (Thursday, September 24, 2026)]
[Notices]
[Pages 60606-60608]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-19582]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4684-072]


GR Catalyst One, LLC; Notice of Scoping Period Requesting 
Comments on Environmental Issues for the Proposed Stillwater 
Hydroelectric Project

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 4684-072.
    c. Date Filed: April 29, 2025.
    d. Applicant: GR Catalyst One, LLC (GR Catalyst).
    e. Name of Project: Stillwater Hydroelectric Project (Stillwater 
Project or project).
    f. Location: On the Hudson River at the New York State Canal 
Corporation's Lock C-4 dam in Saratoga, Rensselaer, and Washington 
counties, New York.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Kelly Maloney, Asset Management, Relevate 
Power, 230 Park Ave., Suite 447, New York, New York 10169; Phone at 
207-233-1995, or email at <a href="/cdn-cgi/l/email-protection#175c727b7b6e395a767b7879726e5765727b726176637267786072653974787a"><span class="__cf_email__" data-cfemail="b9f2dcd5d5c097f4d8d5d6d7dcc0f9cbdcd5dccfd8cddcc9d6cedccb97dad6d4">[email&#160;protected]</span></a>.
    i. FERC Contact: Samantha Pollak at (202) 502-6419, or 
<a href="/cdn-cgi/l/email-protection#85f6e4e8e4ebf1ede4abf5eae9e9e4eec5e3e0f7e6abe2eaf3"><span class="__cf_email__" data-cfemail="c8bba9a5a9a6bca0a9e6b8a7a4a4a9a388aeadbaabe6afa7be">[email&#160;protected]</span></a>.
    j. The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental document that will discuss 
the environmental effects of relicensing the Stillwater Hydroelectric 
Project. The Commission will use this environmental document in its 
decision-making process to determine whether to issue a new license for 
the project.
    k. This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies regarding the project. This notice is intended to advise all 
participants as to the potential scope of the National Environmental 
Policy Act (NEPA) document and to seek additional information pertinent 
to this analysis. Commission staff does not intend to issue a separate 
scoping document.
    As part of the NEPA review process, the Commission takes into 
account concerns the public may have about proposals and the 
environmental effects that could result from its action whenever it 
considers the issuance of a hydropower license. This gathering of 
public input is referred to as ``scoping.'' The main goal of the 
scoping process is to focus the analysis in the environmental document 
on the important environmental issues.
    l. Scoping Comments: By this notice, the Commission requests 
written public comments on the scope of issues to address in the 
environmental document. To ensure that your comments are timely and 
properly recorded, please submit your comments so that the Commission 
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on 
October 21, 2026.
    Comments should focus on the potential environmental effects and 
reasonable alternatives. Your input will help the Commission staff 
determine what issues they need to evaluate in the environmental 
document. Commission staff will consider all written comments during 
the preparation of the environmental document.

[[Page 60607]]

    The Commission strongly encourages electronic filing. Please file 
scoping comments using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief 
comments up to 10,000 characters, without prior registration, using the 
eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For 
assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#de989b8c9d91b0b2b7b0bb8dabaeaeb1acaa9eb8bbacbdf0b9b1a8"><span class="__cf_email__" data-cfemail="41070413020e2f2d282f24123431312e333501272433226f262e37">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Debbie-Anne A. Reese, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, MD 20852. All filings must clearly identify the project name 
and docket number on the first page: Stillwater Hydroelectric Project 
(P-4684-072).
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    m. The application is not ready for environmental analysis at this 
time.
    n. Project Description: The Stillwater Project consists of the 
following facilities: (1) a 5-foot-high concrete gravity dam topped 
with wooden flashboards; (2) an 821-foot-long uncontrolled spillway 
with a crest elevation of 82.4 feet National Geodetic Vertical Datum of 
1929 (NGVD 29) containing two sections of flashboards (Section A and 
Section B) of differing heights [approximately 2.1 feet high (Section 
A) and 1.33 feet high (Section B)]; (3) a reservoir with a surface area 
of 1,500 acres and a normal volume of 9,000 acre-feet at an elevation 
of 84.1 feet NGVD 29; (4) an outlet structure containing three 11-foot-
wide, 10-foot-deep sluice gates and a 10-foot-wide fish bypass gate 
located between the right abutment of the dam and the powerhouse; (5) 
an intake structure; (6) an approximately 116-foot by 56-foot concrete 
and steel powerhouse containing two turbines with a combined capacity 
of 3.5 megawatts; (7) a 275-foot-long tailrace channel varying in width 
from 110 feet near the draft tube extensions to 230 feet at its 
downstream end; (8) a 4.16/34.5-kilovolt (kV) step-up transformer 
adjacent to the powerhouse; (9) a 3.5-mile-long, 34.5-kV overhead 
transmission line; and (10) appurtenant facilities.
    GR Catalyst proposes to continue operating the project in a run-of-
river mode with a minimum flow of 500 cubic feet per second (cfs) 
provided year-round over the east section of the flashboards. GR 
Catalyst also proposes to continue providing a year-round flow of 104 
cfs through the fish bypass system, adjacent to the downstream end of 
the trashrack, for downstream fish passage.
    o. A copy of the application, with details of the proposed project, 
can be viewed on the Commission's website at <a href="https://www.ferc.gov">https://www.ferc.gov</a> using 
the ``eLibrary'' link. Enter the project's docket number excluding the 
last three digits in the docket number field to access the document (P-
4684-072). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#20666572636f4e4c494e45735550504f525460464552430e474f56"><span class="__cf_email__" data-cfemail="7d3b382f3e3213111413182e080d0d120f093d1b180f1e531a120b">[email&#160;protected]</span></a> 
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).
    p. NEPA Process and the Environmental Document: Any environmental 
document issued by the Commission will discuss effects that could occur 
as a result of the project's relicensing under the relevant general 
resource areas, such as:
    <bullet> geology and soils;
    <bullet> water resources;
    <bullet> fish resources;
    <bullet> aquatic resources;
    <bullet> terrestrial resources;
    <bullet> recreation resources;
    <bullet> land use resources;
    <bullet> aesthetic resources;
    <bullet> cultural resources;
    <bullet> socioeconomic resources, and
    <bullet> air quality.
    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project and make recommendations on 
how to lessen or avoid effects on the various resource areas. Your 
comments will help Commission staff identify and focus on the issues 
that might have an effect on the human environment and potentially 
eliminate others from further discussion in the environmental document.
    Following this scoping period, Commission staff will determine 
whether to prepare an Environmental Assessment (EA) or an Environmental 
Impact Statement (EIS). The EA or EIS will present Commission staff's 
independent analysis of the issues. If Commission staff prepares an EA, 
a Notice of Intent to Prepare an Environmental Assessment will be 
issued. The EA may be issued for an allotted public comment period. The 
Commission would consider timely comments on the EA before making its 
decision regarding the proposed project. If Commission staff prepares 
an EIS, a Notice of Intent to Prepare an Environmental Impact Statement 
will be issued. Staff will then prepare a draft EIS which will be 
issued for public comment. Commission staff will consider all timely 
comments received during the comment period on the draft EIS and revise 
the document, as necessary, before issuing a final EIS. Any EA or draft 
and final EIS will be available in electronic format in the public 
record through eLibrary. If eSubscribed, you will receive instant email 
notification when the environmental document is issued (see paragraph 
(r) of this notice for instructions on using eSubscription).
    q. For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#81ced1d1c1e7e4f3e2afe6eef7"><span class="__cf_email__" data-cfemail="58170808183e3d2a3b763f372e">[email&#160;protected]</span></a>.
    r. This notice is being distributed to the Commission's official 
mailing list for the project and any additional entities on the 
applicant's distribution list. You can access the Commission's official 
mailing list for this project at <a href="https://ferconline.ferc.gov/MailListLOR.aspx?Type=MailList&ListVar=P-4684">https://ferconline.ferc.gov/MailListLOR.aspx?Type=MailList&ListVar=P-4684</a>. If you want to receive 
future mailings for the project and are not included on the 
Commission's official mailing list, or if you wish to be removed from 
the Commission's official mailing list, please send your request by 
email to <a href="/cdn-cgi/l/email-protection#64222136272b0a080d0a01371114140b161024020116074a030b12"><span class="__cf_email__" data-cfemail="01474453424e6f6d686f64527471716e737541676473622f666e77">[email&#160;protected]</span></a>. In lieu of an email request, you 
may submit a paper request. Submissions sent via the U.S. Postal 
Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, 
DC 20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, MD 20852. All written or emailed 
requests must specify your wish to be added to or removed from the 
mailing list and must clearly identify the following on the first page: 
Stillwater Hydroelectric Project No. 4684-072.
    Additionally, the Commission offers a free service called 
eSubscription, which makes it easy to stay informed of all issuances 
and submittals regarding the dockets/projects to which you subscribe. 
These instant email

[[Page 60608]]

notifications are the fastest way to receive notification and provide a 
link to the document files which can reduce the amount of time you 
spend researching proceedings. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to register for eSubscription.
    In addition to publishing the full text of this notice in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this notice, as well 
as other documents in the proceeding (e.g., license application) via 
the internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>) 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document (P-
4684). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#5d1b180f1e1233313433380e282d2d322f291d3b382f3e733a322b"><span class="__cf_email__" data-cfemail="d69093849599b8babfb8b385a3a6a6b9a4a296b0b3a4b5f8b1b9a0">[email&#160;protected]</span></a>, 
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).

(Authority: 18 CFR 2.1)

    Dated: September 21, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-19582 Filed 9-23-26; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 24, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.