Abstract

In accordance with the Paperwork Reduction Act (PRA) of 1995, the Bureau of Safety and Environmental Enforcement (BSEE) proposes to renew an information collection.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 182 (Tuesday, September 22, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 182 (Tuesday, September 22, 2026)]
[Notices]
[Pages 60148-60151]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-19291]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Safety and Environmental Enforcement

[Docket ID BSEE-2025-0266; EEEE500000-256E1700D2-ET1SF0000.EAQ000; OMB 
Control Number 1014-0026]


Agency Information Collection Activities; Submission to the 
Office of Management and Budget for Review and Approval; Application 
for Permit To Modify (APM) and Supporting Documentation

AGENCY: Bureau of Safety and Environmental Enforcement, Interior.

[[Page 60149]]


ACTION: Notice of information collection; request for comment.

-----------------------------------------------------------------------

SUMMARY: In accordance with the Paperwork Reduction Act (PRA) of 1995, 
the Bureau of Safety and Environmental Enforcement (BSEE) proposes to 
renew an information collection.

DATES: Interested persons are invited to submit comments on or before 
October 21, 2026.

ADDRESSES: Written comments and recommendations for the proposed 
information collection should be sent within 30 days of publication of 
this notice to <a href="http://www.reginfo.gov/public/do/PRAMain">www.reginfo.gov/public/do/PRAMain</a>. Find this particular 
information collection by selecting ``Currently under 30-day Review--
Open for Public Comments'' or by using the search function. Please 
provide a copy of your comments to Kelly Odom, Acting BSEE ICCO, 45600 
Woodland Road, Sterling, VA 20166; or by email to <a href="/cdn-cgi/l/email-protection#7e351b12120750311a11133e1c0d1b1b50191108"><span class="__cf_email__" data-cfemail="0e456b62627720416a61634e6c7d6b6b20696178">[email&#160;protected]</span></a>. 
Please reference OMB Control Number 1014-0026 in the subject line of 
your comments.

FOR FURTHER INFORMATION CONTACT: To request additional information 
about this ICR, contact Kelly Odom by email at <a href="/cdn-cgi/l/email-protection#ace7c9c0c0d582e3c8c3c1eccedfc9c982cbc3da"><span class="__cf_email__" data-cfemail="1d567871716433527972705d7f6e7878337a726b">[email&#160;protected]</span></a>, or 
by telephone at (703) 787-1775. Individuals in the United States who 
are deaf, deafblind, hard of hearing, or have a speech disability may 
dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay 
services. Individuals outside the United States should use the relay 
services offered within their country to make international calls to 
the point-of-contact in the United States. You may also view the ICR at 
<a href="http://www.reginfo.gov/public/do/PRAMain">http://www.reginfo.gov/public/do/PRAMain</a>.

SUPPLEMENTARY INFORMATION: In accordance with the PRA and 5 CFR 
1320.8(d)(1), we provide the general public and other Federal agencies 
with an opportunity to comment on new, proposed, revised, and 
continuing collections of information. This helps us assess the impact 
of our information collection requirements and minimize the public's 
reporting burden. It also helps the public understand our information 
collection requirements and provide the requested data in the desired 
format.
    A Federal Register notice with a 60-day public comment period 
soliciting comments on this collection of information was published on 
December 22, 2025 (90 FR 59865).
    As part of our continuing effort to reduce paperwork and respondent 
burdens, we are again soliciting comments from the public and other 
Federal agencies on the proposed ICR that is described below. We are 
especially interested in public comment addressing the following:
    (1) Whether or not the collection of information is necessary for 
the proper performance of the functions of the agency, including 
whether or not the information will have practical utility;
    (2) The accuracy of our estimate of the burden for this collection 
of information, including the validity of the methodology and 
assumptions used;
    (3) Ways to enhance the quality, utility, and clarity of the 
information to be collected; and
    (4) How might the agency minimize the burden of the collection of 
information on those who are to respond, including through the use of 
appropriate automated, electronic, mechanical, or other technological 
collection techniques or other forms of information technology, e.g., 
permitting electronic submission of response.
    Comments that you submit in response to this notice are a matter of 
public record. Before including your address, phone number, email 
address, or other personal identifying information in your comment, you 
should be aware that your entire comment--including your personal 
identifying information--may be made publicly available at any time. 
While you can ask us in your comment to withhold your personal 
identifying information from public review, we cannot guarantee that we 
will be able to do so.
    Abstract: The regulations at 30 CFR 250 stipulate the various 
requirements that must be submitted with an APM. The form and the 
numerous submittals that are included and/or attached to the form are 
the subject of this collection. This request also covers related 
Notices to Lessees and Operators (NTLs) that BSEE issues to clarify, 
supplement, or provide additional guidance on some aspects of our 
regulations.
    The BSEE uses the information to ensure safe well control, 
completion, workover, and decommissioning operations and to protect the 
human, marine, and coastal environment. Among other things, BSEE 
specifically uses the information to ensure: the well control, 
completion, workover, and decommissioning unit (drilling/well 
operations) is fit for the intended purpose; equipment is maintained in 
a state of readiness and meets safety standards; each drilling/well 
operation crew is properly trained and able to promptly perform well-
control activities at any time during well operations; compliance with 
safety standards; and the current regulations will provide for safe and 
proper field or reservoir development, resource evaluation, 
conservation, protection of correlative rights, safety, and 
environmental protection. We also review well records to ascertain 
whether the operations have encountered hydrocarbons or H2S and to 
ensure that H2S detection equipment, personnel protective equipment, 
and training of the crew are adequate for safe operations in zones 
known to contain H2S and zones where the presence of H2S is unknown.
    Title of Collection: 30 CFR part 250, Application for Permit to 
Modify (APM) and supporting documentation.
    OMB Control Number: 1014-0026.
    Form Number: BSEE-0124.
    Type of Review: Extension of a currently approved collection.
    Respondents/Affected Public: Potential respondents include Federal 
OCS oil, gas, and sulfur lessees and/or operators and holders of 
pipeline rights-of-way.
    Total Estimated Number of Annual Respondents: Currently there are 
approximately 555 Federal OCS oil, gas, and sulfur lessees and holders 
of pipeline rights-of-way. Not all the potential respondents will 
submit information in any given year, and some may submit multiple 
times.
    Total Estimated Number of Annual Responses: 12,388.
    Estimated Completion Time per Response: Varies from 0 minutes to 
6,252 hours, depending on activity.
    Total Estimated Number of Annual Burden Hours: 31,472.
    Respondent's Obligation: Mandatory.
    Frequency of Collection: Generally, on occasion and varies by 
section.
    Total Estimated Annual Nonhour Burden Cost: $5,483,295.

[[Page 60150]]



----------------------------------------------------------------------------------------------------------------
                                                                                                        Average
  Citation 30 CFR 250         Reporting or                                Average number of annual     number of
         APM's                recordkeeping          Hour  burden                responses              annual
                              requirement *                                                            responses
----------------------------------------------------------------------------------------------------------------
                                                    Non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
Subparts D, E, F, G, H,  Submit APM plans (BSEE- 1 hour..............  1,471 applications...........       1,471
 Q.                       0124). (This burden
                          represents only the
                          filling out of the
                          form, the
                          requirements are
                          listed separately
                          below).
                                                ----------------------------------------------------------------
                                                 1,471 applications x $145 application fee = $213,295.
                                                ----------------------------------------------------------------
Subparts D, E, F, G, H,  Submit Revised APM      1 hour..............  2,235 applications...........       2,235
 Q.                       plans (BSEE-0124).
                          (This burden
                          represents only the
                          filling out of the
                          form, the
                          requirements are
                          listed separately
                          below) [no fee
                          charged].
----------------------------------------------------------------------------------------------------------------
    Subtotal.........................................................  3,706 responses..............       3,706
                        ----------------------------------------------------------------------------------------
                         $213,295 non-hour cost burdens.
----------------------------------------------------------------------------------------------------------------
                                                    Subpart A
----------------------------------------------------------------------------------------------------------------
125....................  Submit evidence of      Exempt under 5 CFR 1320.3(h).                                 0
                          your fee for services
                          receipt.
197....................  Written                 Exempt under 5 CFR 1320.5(h).                                 0
                          confidentiality
                          agreement.
199....................  PRA List of             Exempt under 5 CFR 1320.5(h).                                 0
                          Information
                          Collections (IC).
----------------------------------------------------------------------------------------------------------------
                                                    Subpart B
----------------------------------------------------------------------------------------------------------------
201....................  Approved before well    Exempt under 5 CFR 1320.3(h).                                 0
                          completion.
220(b).................  The DWOP process does   Exempt under 5 CFR 1320.3(h).                                 0
                          not replace the
                          requirements of
                          BSEE's APMs.
226....................  New or Unusual          Exempt under 5 CFR 1320.3(h).                                 0
                          Conception Plan must
                          be approved prior to
                          APM.
----------------------------------------------------------------------------------------------------------------
                                                    Subpart D
----------------------------------------------------------------------------------------------------------------
460(a); 465............  There are some          Burden covered under 30 CFR 250, 1014-0025.                   0
                          regulatory
                          requirements that
                          give respondents the
                          option of submitting
                          information with
                          either their APD or
                          APM; industry advised
                          us that when it comes
                          to this particular
                          subpart, they submit
                          a Revised APD.
----------------------------------------------------------------------------------------------------------------
    Subtotal of Subpart D............................................  0 responses..................           0
----------------------------------------------------------------------------------------------------------------
                                                    Subpart E
----------------------------------------------------------------------------------------------------------------
513....................  Obtain written          1 hour..............  150 submittals...............         150
                          approval for well-
                          completion
                          operations. Submit
                          information,
                          including but not
                          limited to, request
                          for completion
                          (including changes);
                          description of well-
                          completion
                          procedures; statement
                          of expected surface
                          pressure, type and
                          weight of completion
                          fluids; schematic
                          drawing; a partial
                          electric log; H2S
                          presence or if
                          unknown, service fee
                          receipt.
518(f).................  Submit descriptions     2.25 hours..........  43 submittals................          97
                          and calculations of
                          production packer
                          setting depth(s).
526(a).................  Submit a notification   0 mins..............  58 notifications.............           0
                          of corrective action
                          of the diagnostic
                          test.
----------------------------------------------------------------------------------------------------------------
    Subtotal of Subpart E............................................  251 responses................         247
----------------------------------------------------------------------------------------------------------------
                                                    Subpart F
----------------------------------------------------------------------------------------------------------------
613(a), (b)............  Request approval to     5.25 hour...........  687 requests.................       3,607
                          begin other than
                          normal workover,
                          which includes
                          description of
                          procedures, changes
                          in equipment,
                          schematic, info about
                          H2S, etc.
613(c).................  If completing a new     2.5 hours...........  167 submittals...............         418
                          zone, submit reason
                          for abandonment and
                          statement of pressure
                          data.
613(d).................  Submit work as          2 hours.............  646 submittals...............       1,292
                          performed 30 days
                          after completing the
                          well-workover
                          operation.
619(f).................  Submit descriptions     1.38 hours..........  43 submittals................          59
                          and calculations of
                          production packer
                          setting depth(s).
----------------------------------------------------------------------------------------------------------------
    Subtotal of Subpart F............................................  1,543 responses..............       5,376
----------------------------------------------------------------------------------------------------------------
                                                    Subpart G
----------------------------------------------------------------------------------------------------------------
701....................  Identify and discuss    3.25 hours..........  67 submittals................         218
                          your proposed
                          alternate procedures
                          or equipment [the
                          request to use
                          alternative
                          procedures/equipment
                          is covered under 1014-
                          0022].
702....................  Identify and discuss    1.75 hours..........  47 submittals................          82
                          the departure from
                          requirements [the
                          request to depart
                          from requirements is
                          covered under 1014-
                          0022].
713....................  Submit required         1.5 hours...........  180 Submittals...............         270
                          information to use a
                          MODU for well
                          operations, including
                          fitness & foundation
                          requirements,
                          contingency plan for
                          moving off location,
                          current monitoring
                          (description of
                          specific current
                          speeds & specific
                          measures to curtail
                          rig operations and
                          move off location).
720(b).................  Obtain approval to      1.5 hours...........  129 submittals...............         194
                          displace kill weight
                          fluid with detailed
                          step-by-step written
                          procedures that
                          include, but are not
                          limited to, number of
                          barriers, tests, BOP
                          procedures, fluid
                          volumes entering and
                          leaving wellbore
                          procedures.
721(g).................  Request approval for    1 hour..............  325 requests.................         325
                          test procedures and
                          criteria for a
                          successful negative
                          pressure test,
                          including any changes.
731....................  Submit complete         5 hours.............  170 submittals...............         850
                          description of BOP
                          system and
                          components; schematic
                          drawings;
                          certification by ITP
                          (additional ITP if
                          BOP is subsea, in
                          HTHP, or surface on
                          floating facility);
                          autoshear, deadman,
                          EDS systems.
                                                ----------------------------------------------------------------
                                                 $31,000 x 170 submittals = $5,270,000.
                                                ----------------------------------------------------------------
732(b) and (c).........  Submit independent      4.25................  1,471........................       6,252
                          third party
                          qualifications to
                          BSEE with the
                          associated permit
                          application.
733....................  Description of annulus  0.5 hour............  212 submittals...............         106
                          monitoring plan and
                          how you will secure
                          the well in the event
                          a leak is detected.
737(d)(2)..............  Submit test procedures  0.5 hour............  41 submittals................          21
                          for District Manager
                          approval for initial
                          test when using water
                          on surface BOP.

[[Page 60151]]

 
737(d)(3)..............  Submit test procedures  0.5 hour............  39 submittals................          20
                          for District Manager
                          approval to stump
                          test a subsea BOP;
                          including how you
                          will test each ROV
                          function for approval.
737(d)(4)..............  Submit test procedures  0.5 hour............  41 submittals................          21
                          for District Manager
                          approval to perform
                          an initial subsea BOP
                          test; including how
                          you will test each
                          ROV function for
                          approval.
737(d)(12).............  Submit test procedures  1 hour..............  223 submittals...............         223
                          for District Manager
                          approval, including
                          schematics of the
                          actual controls and
                          circuitry of the
                          system used during an
                          actual autoshear or
                          deadman event.
738(m).................  Request approval from   2 hours.............  266 requests.................         532
                          District Manager to
                          utilize other well-
                          control equipment;
                          include report from
                          BAVO on equipment
                          design & suitability;
                          other information
                          required by District
                          Manager.
738(n).................  Indicate which pipe/    0.75 hour...........  223 submittals...............         167
                          variable bore rams
                          have no current
                          utility or well-
                          control purposes.
750(a).................  Request approval to     1.5 hours...........  640 requests.................         960
                          conduct operations
                          without downhole
                          check valves,
                          describe alternate
                          procedures and
                          equipment.
----------------------------------------------------------------------------------------------------------------
    Subtotal of Subpart G............................................  4,074 responses..............      10,241
                        ----------------------------------------------------------------------------------------
                         $5,270,000 non-hour costs burden.
----------------------------------------------------------------------------------------------------------------
                                                    Subpart H
----------------------------------------------------------------------------------------------------------------
813....................  May submit an APM for   ....................  0............................           0
                          approval to equip a
                          dry tree well with a
                          subsurface-controlled
                          SSSV.
817(a).................  You may remove a        ....................  0............................           0
                          wireline subsurface
                          safety device for a
                          routine operation not
                          requiring approval of
                          a AMP.
828(b).................  Well must not be open   ....................  0............................           0
                          to flow while an SSSV
                          is inoperable, unless
                          specifiallly approved
                          by an APM.
----------------------------------------------------------------------------------------------------------------
    Subtotal of Subpart H............................................  0 responses..................           0
----------------------------------------------------------------------------------------------------------------
                                                    Subpart Q
----------------------------------------------------------------------------------------------------------------
1704...................  Request approval of     4.25 hours..........  604 requests.................       2,567
                          well abandonment
                          operations.
1704(h)................  Submit with a final     3.13 hours..........  368 submittals...............       1,152
                          well schematic,
                          description, nature
                          and quantities of
                          material used;
                          relating to casing
                          string--description
                          of methods used, size
                          and amount of casing
                          and depth.
1712; 1704(h)..........  Obtain and receive      5.25 hours..........  215 certifications...........       1,129
                          approval before
                          permanently plugging
                          a well or zone.
                          Include in request,
                          but not limited to,
                          reason plugging well,
                          with relevant
                          information; well
                          test and pressure
                          data; type and weight
                          of well control
                          fluid; a schematic
                          listing mud and
                          cement properties;
                          plus testing plans.
                          Submit Certification
                          by a Registered
                          Professional Engineer
                          of the well
                          abandonment design
                          and procedures;
                          certify the design.
                         Obtain and receive      2.75 hours..........  375 submittals...............       1,031
                          approval before
                          permanently plugging
                          a well or zone.
                          Include in request,
                          but not limited to
                          max surface pressure
                          and determination;
                          description of work;
                          well depth,
                          perforated intervals;
                          casing and tubing
                          depths/details, plus
                          locations, types,
                          lengths, etc.
1721; 1704(h)..........  Submit the applicable   5.25 hours..........  1,094 submittals.............       5,744
                          information required
                          to temporarily
                          abandon a well for
                          approval; after
                          temporarily plugging
                          a well, submit well
                          schematic,
                          description of
                          remaining subsea
                          wellheads, casing
                          stubs, mudline
                          suspension equipment
                          and required
                          information of this
                          section; submit
                          certification by a
                          Registered
                          Professional Engineer
                          of the well
                          abandonment design
                          and procedures;
                          certify design.
1722(a)................  Request approval to     1.25 hours..........  15 requests..................          19
                          install a subsea
                          protective device.
1723(b)................  Submit a request to     1.75 hours..........  138 requests.................         242
                          perform work to
                          remove casing stub,
                          mudline equipment,
                          and/or subsea
                          protective covering.
1743(a)................  Submit signed           3.63 hours..........  5 certifications.............          18
                          certification; date
                          of verification work
                          and vessel; area
                          surveyed; method
                          used; results of
                          survey including
                          debris or statement
                          that no objects were
                          recover; a post-
                          trawling plot or map
                          showing area.
----------------------------------------------------------------------------------------------------------------
    Subtotal of Subpart Q............................................  2,814 responses..............      11,902
                        ----------------------------------------------------------------------------------------
        Total Burden.................................................  12,388 responses.............      31,472
                        ----------------------------------------------------------------------------------------
                         $5,483,295 non-hour cost burdens.
----------------------------------------------------------------------------------------------------------------

    An agency may not conduct, or sponsor and a person is not required 
to respond to a collection of information unless it displays a 
currently valid OMB control number.
    The authority for this action is the Paperwork Reduction Act of 
1995 (44 U.S.C. 3501 et seq.).

Kirk Malstrom,
Chief, Regulations and Standards Branch.
[FR Doc. 2026-19291 Filed 9-21-26; 8:45 am]
BILLING CODE 4310-VH-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 22, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.