Airworthiness Directives; The Boeing Company Airplanes

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 21, 2026

Issuing agencies

Transportation DepartmentFederal Aviation Administration

Abstract

The FAA proposes to adopt a new airworthiness directive (AD) for certain The Boeing Company Model 737-8, 737-9, and 737-8200 airplanes. This proposed AD was prompted by a report that bearings in the elevator buss assembly could have been installed incorrectly (including being installed without the application of sealant) during production. This proposed AD would require detailed inspections of the elevator buss assembly bearings and bearing housings for any crack and indication of sealant application, and applicable on-condition actions. The FAA is proposing this AD to address the unsafe condition on these products.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 181 (Monday, September 21, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 181 (Monday, September 21, 2026)]
[Proposed Rules]
[Pages 59708-59711]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-19255]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2026-8811; Project Identifier AD-2025-01891-T]
RIN 2120-AA64


Airworthiness Directives; The Boeing Company Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: The FAA proposes to adopt a new airworthiness directive (AD) 
for certain The Boeing Company Model 737-8, 737-9, and 737-8200 
airplanes. This proposed AD was prompted by a report that bearings in 
the elevator buss assembly could have been installed incorrectly 
(including being installed without the application of sealant) during 
production. This proposed AD would require detailed inspections of the 
elevator buss assembly bearings and bearing housings for any crack and 
indication of sealant application, and applicable on-condition actions. 
The FAA is proposing this AD to address the unsafe condition on these 
products.

DATES: The FAA must receive comments on this proposed AD by November 5, 
2026.

ADDRESSES: You may send comments, using the procedures found in 14 CFR 
11.43 and 11.45, by any of the following methods:
    <bullet> Federal eRulemaking Portal: Go to <a href="http://regulations.gov">regulations.gov</a>. Follow 
the instructions for submitting comments.
    <bullet> Fax: 202-493-2251.
    <bullet> Mail: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE, Washington, DC 20590.
    <bullet> Hand Delivery: Deliver to Mail address above between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
    AD Docket: You may examine the AD docket at <a href="http://regulations.gov">regulations.gov</a> under 
Docket No. FAA-2026-8811; or in person at Docket Operations between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD 
docket contains this NPRM, any comments received, and other 
information. The street address for Docket Operations is listed above.
    Material Incorporated by Reference:
    <bullet> For Boeing material identified in this proposed AD, 
contact Boeing Commercial Airplanes, Attention: Contractual & Data 
Services (C&DS), 2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 
90740-5600; telephone 562-797-1717; website <a href="http://myboeingfleet.com">myboeingfleet.com</a>.
    <bullet> You may view this material at the FAA, Airworthiness 
Products Section, Operational Safety Branch, 2200 South 216th St., Des 
Moines, WA. For information on the availability of this material at the 
FAA, call 206-231-3195. It is also available at <a href="http://regulations.gov">regulations.gov</a> under 
Docket No. FAA-2026-8811.

FOR FURTHER INFORMATION CONTACT: Raymond Vital, Aviation Safety 
Engineer, FAA, 2200 South 216th St., Des Moines, WA 98198; phone: 206-
231-3521; email: <a href="/cdn-cgi/l/email-protection#0250637b6f6d6c662c482c546b76636e426463632c656d74"><span class="__cf_email__" data-cfemail="0250637b6f6d6c662c482c546b76636e426463632c656d74">[email&#160;protected]</span></a>.

SUPPLEMENTARY INFORMATION:

[[Page 59709]]

Comments Invited

    The FAA invites you to send any written relevant data, views, or 
arguments about this proposal. Send your comments using a method listed 
under the ADDRESSES section. Include ``Docket No. FAA-2026-8811; 
Project Identifier AD-2025-01891-T'' at the beginning of your comments. 
The most helpful comments reference a specific portion of the proposal, 
explain the reason for any recommended change, and include supporting 
data. The FAA will consider all comments received by the closing date 
and may amend this proposal because of those comments.
    Except for Confidential Business Information (CBI) as described in 
the following paragraph, and other information as described in 14 CFR 
11.35, the FAA will post all comments received, without change, to 
<a href="http://regulations.gov">regulations.gov</a>, including any personal information you provide. The 
agency will also post a report summarizing each substantive verbal 
contact received about this NPRM.

Confidential Business Information

    CBI is commercial or financial information that is both customarily 
and actually treated as private by its owner. Under the Freedom of 
Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public 
disclosure. If your comments responsive to this NPRM contain commercial 
or financial information that is customarily treated as private, that 
you actually treat as private, and that is relevant or responsive to 
this NPRM, it is important that you clearly designate the submitted 
comments as CBI. Please mark each page of your submission containing 
CBI as ``PROPIN.'' The FAA will treat such marked submissions as 
confidential under the FOIA, and they will not be placed in the public 
docket of this NPRM. Submissions containing CBI should be sent to 
Raymond Vital, Aviation Safety Engineer, FAA, 2200 South 216th St., Des 
Moines, WA 98198; phone: 206-231-3521; email: <a href="/cdn-cgi/l/email-protection#3664574f5b595852187c18605f42575a7650575718515940"><span class="__cf_email__" data-cfemail="f5a7948c989a9b91dbbfdba39c819499b5939494db929a83">[email&#160;protected]</span></a>. 
Any commentary that the FAA receives that is not specifically 
designated as CBI will be placed in the public docket for this 
rulemaking.

Background

    The FAA has received a report indicating that bearings in the 
elevator buss assembly could have been installed incorrectly (including 
being installed without the application of sealant) during production. 
The elevator buss assembly is part of the elevator controls system and 
assists in the movement of the control columns. Improper installation 
of bearings could lead to cracking in the elevator buss assembly 
bearings and bearing housings, which could lead to premature failure of 
the elevator buss assembly crank arms. This condition, if not 
addressed, could impact elevator pitch control and affect continued 
safe flight and landing of the airplane.

FAA's Determination

    The FAA is issuing this NPRM after determining that the unsafe 
condition described previously is likely to exist or develop on other 
products of the same type design.

Material Incorporated by Reference Under 1 CFR Part 51

    The FAA reviewed Boeing Alert Requirements Bulletin 737-27A1331 RB, 
dated December 17, 2025. This material specifies procedures for a 
detailed inspection of the elevator buss assembly bearings and bearing 
housings for any crack and indication of sealant application, and 
applicable on-condition actions. On-condition actions include doing a 
push-out load test of the elevator buss assembly bearings having part 
numbers (P/N) BACB10HY08CNJP, BACB10HY10CNJP, and BACB10JG12AZJ03G; 
and, depending on findings, replacing the elevator buss assembly with a 
new or serviceable elevator buss assembly, replacing any affected 
bearing with a new bearing, and repairing the elevator buss assembly at 
an affected location and doing a push-out load test of the elevator 
buss assembly bearings at all unaffected bearing locations.
    This material is reasonably available because the interested 
parties have access to it through their normal course of business or by 
the means identified in the ADDRESSES section.

Proposed AD Requirements in This NPRM

    This proposed AD would require accomplishing the actions specified 
in the material already described, except for any differences 
identified as exceptions in the regulatory text of this proposed AD. 
For information on the procedures and compliance times, see this 
material at <a href="http://regulations.gov">regulations.gov</a> under Docket No. FAA-2026-8811.

Costs of Compliance

    The FAA estimates that this AD, if adopted as proposed, would 
affect 95 airplanes of U.S. registry. The FAA estimates the following 
costs to comply with this proposed AD:

                                                 Estimated Costs
----------------------------------------------------------------------------------------------------------------
                                                                                       Cost per    Cost on U.S.
                  Action                            Labor cost           Parts cost    product       operators
----------------------------------------------------------------------------------------------------------------
Inspect bearings.........................  23 work-hours x $85 per               $0       $1,955        $185,725
                                            hour = $1,955.
----------------------------------------------------------------------------------------------------------------

    The FAA estimates the following costs to do any necessary 
replacements that would be required based on the results of the 
proposed inspection. The agency has no way of determining the number of 
aircraft that might need these replacements:

                                               On-Condition Costs
----------------------------------------------------------------------------------------------------------------
                                                                                                       Cost per
                 Action                            Labor cost                    Parts cost            product
----------------------------------------------------------------------------------------------------------------
Push-out load test......................  1 work-hour x $85 per hour =  $0.........................          $85
                                           $85.
Replace bearing, P/N BACB10HY08CNJP.....  3 work-hours x $85 per hour   $850 per bearing...........        1,105
                                           = $255 per bearing.
Replace bearing, P/N BACB10HY10CNJP.....  3 work-hours x $85 per hour   $915 per bearing...........        1,170
                                           = $255 per bearing.
Replace bearing, P/N BACB10JG12AZJ03G...  3 work-hours x $85 per hour   $1,554 per bearing.........        1,809
                                           = $255 per bearing.
Replace elevator buss assembly..........  3 work-hours x $85 per hour   $98,241....................       98,496
                                           = $255.
----------------------------------------------------------------------------------------------------------------
* The FAA has received no definitive data on which to base the cost estimates for some of the on-condition
  repairs specified in this AD.


[[Page 59710]]

    The FAA has included all known costs in its cost estimate. 
According to the manufacturer, however, some or all of the costs of 
this proposed AD may be covered under warranty, thereby reducing the 
cost impact on affected operators.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. Subtitle VII: Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    The FAA is issuing this rulemaking under the authority described in 
Subtitle VII, part A, subpart III, section 44701: General requirements. 
Under that section, Congress charges the FAA with promoting safe flight 
of civil aircraft in air commerce by prescribing regulations for 
practices, methods, and procedures the Administrator finds necessary 
for safety in air commerce. This regulation is within the scope of that 
authority because it addresses an unsafe condition that is likely to 
exist or develop on products identified in this rulemaking action.

Regulatory Findings

    The FAA determined that this proposed AD would not have federalism 
implications under Executive Order 13132. This proposed AD would not 
have a substantial direct effect on the States, on the relationship 
between the national government and the States, or on the distribution 
of power and responsibilities among the various levels of government.
    For the reasons discussed above, I certify this proposed 
regulation:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866,
    (2) Would not affect intrastate aviation in Alaska, and
    (3) Would not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

The Proposed Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority:  49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13   [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new airworthiness 
directive:

The Boeing Company: Docket No. FAA-2026-8811; Project Identifier AD-
2025-01891-T.

(a) Comments Due Date

    The FAA must receive comments on this airworthiness directive 
(AD) by November 5, 2026.

(b) Affected ADs

    None.

(c) Applicability

    This AD applies to The Boeing Company Model 737-8, 737-9, and 
737-8200 airplanes, certificated in any category, as identified in 
Boeing Alert Requirements Bulletin 737-27A1331 RB, dated December 
17, 2025.

(d) Subject

    Air Transport Association (ATA) of America Code 27, Flight 
Controls.

(e) Unsafe Condition

    This AD was prompted by a report that bearings in the elevator 
buss assembly could have been installed incorrectly (including being 
installed without the application of sealant) during production. The 
FAA is issuing this AD to address premature failure of the elevator 
buss assembly crank arms, cracking in the elevator buss assembly 
bearings, and bearing housings missing sealant. The unsafe 
condition, if not addressed, could impact elevator pitch control and 
affect continued safe flight and landing of the airplane.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Required Actions

    Except as specified by paragraph (h) of this AD: At the 
applicable times specified in the ``Compliance'' paragraph of Boeing 
Alert Requirements Bulletin 737-27A1331 RB, dated December 17, 2025, 
do all applicable actions identified in, and in accordance with, the 
Accomplishment Instructions of Boeing Alert Requirements Bulletin 
737-27A1331 RB, dated December 17, 2025.
    Note 1 to paragraph (g): Guidance for accomplishing the actions 
required by this AD can be found in Boeing Alert Service Bulletin 
737-27A1331, dated December 17, 2025, which is referred to in Boeing 
Alert Requirements Bulletin 737-27A1331 RB, dated December 17, 2025.

(h) Exceptions to Requirements Bulletin Specifications

    Where the Compliance Time column of the table in the 
``Compliance'' paragraph of Boeing Alert Requirements Bulletin 737-
27A1331 RB, dated December 17, 2025, refers to the original issue 
date of Requirements Bulletin 737-27A1331 RB, this AD requires using 
the effective date of this AD.

(i) Alternative Methods of Compliance (AMOCs)

    (1) The Manager, AIR-520, Continued Operational Safety Branch, 
FAA, has the authority to approve AMOCs for this AD, if requested 
using the procedures found in 14 CFR 39.19. In accordance with 14 
CFR 39.19, send your request to your principal inspector or 
responsible Flight Standards Office, as appropriate. If sending 
information directly to the manager of the Continued Operational 
Safety Branch, send it to the attention of the person identified in 
paragraph (j)(1) of this AD. Information may be emailed to: 
<a href="/cdn-cgi/l/email-protection#c88985878b88aea9a9e6afa7be"><span class="__cf_email__" data-cfemail="c3828e8c8083a5a2a2eda4acb5">[email&#160;protected]</span></a>. Before using any approved AMOC, notify your 
appropriate principal inspector, or lacking a principal inspector, 
the manager of the responsible Flight Standards Office.
    (2) An AMOC that provides an acceptable level of safety may be 
used for any repair, modification, or alteration required by this AD 
if it is approved by The Boeing Company Organization Designation 
Authorization (ODA) that has been authorized by the Manager, AIR-
520, Continued Operational Safety Branch, FAA, to make those 
findings. To be approved, the repair method, modification deviation, 
or alteration deviation must meet the certification basis of the 
airplane, and the approval must specifically refer to this AD.

(j) Additional Information

    (1) For more information about this AD, contact Raymond Vital, 
Aviation Safety Engineer, FAA, 2200 South 216th St., Des Moines, WA 
98198; phone: 206-231-3521; email: <a href="/cdn-cgi/l/email-protection#f8aa99819597969cd6b2d6ae918c9994b89e9999d69f978e"><span class="__cf_email__" data-cfemail="f4a6958d999b9a90dabedaa29d809598b4929595da939b82">[email&#160;protected]</span></a>.
    (2) Material identified in this AD that is not incorporated by 
reference is available at the address specified in paragraph (k)(3) 
of this AD.

(k) Material Incorporated by Reference

    (1) The Director of the Federal Register approved the 
incorporation by reference of the material listed in this paragraph 
under 5 U.S.C. 552(a) and 1 CFR part 51.
    (2) You must use this material as applicable to do the actions 
required by this AD, unless the AD specifies otherwise.
    (i) Boeing Alert Requirements Bulletin 737-27A1331 RB, dated 
December 17, 2025.
    (ii) [Reserved]
    (3) For Boeing material identified in this AD, contact Boeing 
Commercial Airplanes, Attention: Contractual & Data Services (C&DS), 
2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 90740-5600; 
telephone 562-797-1717; website <a href="http://myboeingfleet.com">myboeingfleet.com</a>.
    (4) You may view this material at the FAA, Airworthiness 
Products Section, Operational Safety Branch, 2200 South 216th St., 
Des Moines, WA. For information on the availability of this material 
at the FAA, call 206-231-3195.

[[Page 59711]]

    (5) You may view this material at the National Archives and 
Records Administration (NARA). For information on the availability 
of this material at NARA, visit <a href="http://www.archives.gov/federal-register/cfr/ibr-locations">www.archives.gov/federal-register/cfr/ibr-locations</a> or email <a href="/cdn-cgi/l/email-protection#375145195e5944475254435e5859775956455619505841"><span class="__cf_email__" data-cfemail="c1a7b3efa8afb2b1a4a2b5a8aeaf81afa0b3a0efa6aeb7">[email&#160;protected]</span></a>.

    Issued on September 14, 2026.
Lona C. Saccomando,
Acting Deputy Director, Integrated Certificate Management Division, 
Aircraft Certification Service.
[FR Doc. 2026-19255 Filed 9-18-26; 8:45 am]
BILLING CODE 4910-13-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 21, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.