Commission Information Collection Activities (FERC-912); Comment Request; Extension
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection FERC-912 (1902-0237), PURPA Section 210(m) Notification Requirements Applicable to Cogeneration and Small Power Production Facilities. The comment period ended on September 8, 2026, with no comments received. There are no changes to the reporting requirements.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 177 (Tuesday, September 15, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 177 (Tuesday, September 15, 2026)]
[Notices]
[Pages 58437-58438]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-18872]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC26-38-000]
Commission Information Collection Activities (FERC-912); Comment
Request; Extension
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice of information collection and request for comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, the Federal Energy Regulatory Commission (Commission or
FERC) is soliciting public comment on the currently approved
information collection FERC-912 (1902-0237), PURPA Section 210(m)
Notification Requirements Applicable to Cogeneration and Small Power
Production Facilities. The comment period ended on September 8, 2026,
with no comments received. There are no changes to the reporting
requirements.
DATES: Comments on the collection of information are due October 15,
2026.
ADDRESSES: Send written comments on FERC-912 to OMB through <a href="https://www.reginfo.gov/public/do/PRA/icrPublicCommentRequest?ref_nbr=202608-1902-009">https://www.reginfo.gov/public/do/PRA/icrPublicCommentRequest?ref_nbr=202608-1902-009</a>. You can also visit <a href="https://www.reginfo.gov/public/do/PRAMain">https://www.reginfo.gov/public/do/PRAMain</a>
and use the drop-down under ``Currently under Review'' to select the
``Federal Energy Regulatory Commission'' where you can see the open
opportunities to provide comments. Comments should be sent within 30
days of publication of this notice.
Please submit a copy of your comments to the Commission via email
to <a href="/cdn-cgi/l/email-protection#a7e3c6d3c6e4cbc2c6d5c6c9c4c2e7e1e2f5e489c0c8d1"><span class="__cf_email__" data-cfemail="7b3f1a0f1a38171e1a091a15181e3b3d3e2938551c140d">[email protected]</span></a>. You must specify Docket No. (IC26-38-000)
and the FERC Information Collection number (FERC-912) in your email. If
you are unable to file electronically, comments may be filed by USPS
mail or by hand (including courier) delivery:
<bullet> Mail via U.S. Postal Service Only: Federal Energy
Regulatory Commission, Secretary of the Commission, 888 First Street,
NE, Washington, DC 20426.
<bullet> All other delivery methods: Federal Energy Regulatory
Commission, Secretary of the Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Docket: To view comments and issuances in this docket, please visit
<a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>. Once there, you can also
sign up for automatic notification of activity in this docket.
FOR FURTHER INFORMATION CONTACT: Contact: Kayla Williams at
<a href="/cdn-cgi/l/email-protection#eaae8b9e8ba9868f8b988b84898faaacafb8a9c48d859c"><span class="__cf_email__" data-cfemail="2064415441634c454152414e434560666572630e474f56">[email protected]</span></a>, telephone at (202) 502-6468.
SUPPLEMENTARY INFORMATION:
Title: FERC-912, PURPA Section 210(m) Notification Requirements
Applicable to Cogeneration and Small Power Production Facilities.
OMB Control No.: 1902-0237.
Type of Request: Three-year extension of the FERC-912 information
collection requirements with no changes to the current reporting
requirements.
Abstract: On August 8, 2005, the Energy Policy Act of 2005 (EPAct
2005) \1\ was signed into law. Section 1253(a) of EPAct 2005 amended
Section 210 of the Public Utility Regulatory Policies Act of 1978
(PURPA) by adding subsection ``(m),'' which provides, based on a
specified showing, for the termination and subsequent reinstatement of
an electric utility's obligation to purchase from, and sell energy and
capacity to, qualifying facilities (QFs). In 2019, the Commission
revised its regulations in 18 CFR 292.309--292.313 in Docket No. RM19-
15-000 to account for industry changes. These industry changes include:
the decrease in reliance on oil and natural gas, the increase of
natural gas supply due to access of shale reserves, and the decreasing
costs of renewable energy sources. Due to the modifications in the
rulemaking, the Commission revised its information collection
requirements. The Commission now collects the following information on
FERC Form 912:
---------------------------------------------------------------------------
\1\ Public Law 109-58, 119 Stat. 594 (2005).
---------------------------------------------------------------------------
<bullet> Sec. 292.310: an electric utility's application for the
termination of its obligation to purchase energy from a QF,
<bullet> Sec. 292.311: an affected entity or person's application
to the Commission for an order reinstating the electric utility's
obligation to purchase energy from a QF,
<bullet> Sec. 292.312: an electric utility's application for the
termination of its obligation to sell energy and capacity to QFs, and
<bullet> Sec. 292.313: an affected entity or person's application
to the Commission for an order reinstating the electric utility's
obligation to sell energy and capacity to QFs.\2\
---------------------------------------------------------------------------
\2\ 18 CFR 292.311 and 292.313.
---------------------------------------------------------------------------
Type of Respondents: Electric utilities.
Estimate of Annual Burden: \3\ The Commission estimates the total
Public Reporting Burden and cost for this information collection as
follows:
---------------------------------------------------------------------------
\3\ Burden as the total time, effort, or financial resources
expended by persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For further
explanation of what is included in the information collection
burden, refer to 5 CFR 1320.3.
[[Page 58438]]
FERC-912 (IC22-9-000)--Cogeneration and Small Power Production, PURPA Section 210(m) Regulations for Termination or Reinstatement of Obligation To
Purchase or Sell
--------------------------------------------------------------------------------------------------------------------------------------------------------
Average burden
Number of hours & Total annual
Number of responses per Total number of average cost burden hours & Cost per
respondents respondent responses per response total annual cost respondent ($)
($) \4\ ($)
(1) (2) (1) x (2) = (3) (4) (3) x (4) = (5) (5) / (1) = (6)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Termination of obligation to purchase.......... 4 1.5 6 12 72 $1,836
$1,224 $7,344
Reinstatement of obligations to purchase....... 0 0 0 0 0 0
$0 $0
Termination of obligation to sell.............. 2 1 2 8 16 816
$816 $1,632
Reinstatement of obligation to sell............ 0 0 0 0 0 0
$0 $0
--------------------------------------------------------------------------------------------------------
Total...................................... .............. .............. 8 88 hours $8,976 2,652
--------------------------------------------------------------------------------------------------------------------------------------------------------
Comments: Comments are invited on: (1) whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
---------------------------------------------------------------------------
\4\ The estimates for cost per response are derived using the
following formula: Average Burden Hours per Response * $102.00 per
Hour = Average Cost per Response. The hourly cost figure comes from
the FERC average salary ($213,003/year). Commission staff believes
the 2026 FERC average salary to be a representative wage for
industry respondents.
Dated: September 10, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-18872 Filed 9-14-26; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.