Skip to main content
Notice2026-18783

Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving no Significant Hazards Considerations

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 15, 2026

Issuing agencies

Nuclear Regulatory Commission

Abstract

Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 177 (Tuesday, September 15, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 177 (Tuesday, September 15, 2026)]
[Notices]
[Pages 58473-58479]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-18783]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2026-4390]


Biweekly Notice; Applications and Amendments to Facility 
Operating Licenses and Combined Licenses Involving no Significant 
Hazards Considerations

AGENCY: Nuclear Regulatory Commission.

ACTION: Biweekly notice.

-----------------------------------------------------------------------

SUMMARY: Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, 
as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is 
publishing this regular biweekly notice. The Act requires the 
Commission to publish notice of any amendments issued, or proposed to 
be issued, and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license or combined 
license, as applicable, upon a determination by the Commission that 
such amendment involves no significant hazards consideration (NSHC), 
notwithstanding the pendency before the Commission of a request for a 
hearing from any person.

DATES: Comments must be filed by October 15, 2026. A request for a 
hearing or petitions for leave to intervene must be filed by November 
16, 2026. This biweekly notice includes all amendments issued, or 
proposed to be issued, from August 18, 2026, to August 31, 2026. The 
last biweekly notice was published on September 1, 2026.

ADDRESSES: You may submit comments by any of the following; however, 
the NRC encourages electronic comment submission through the Federal 
rulemaking website.
    <bullet> Federal rulemaking website: Go to <a href="https://www.regulations.gov">https://www.regulations.gov</a> and search for Docket ID NRC-2026-4390. Address 
questions about Docket IDs in <a href="http://Regulations.gov">Regulations.gov</a> to Bridget Curran; 
telephone: 301-415-1003; email: <a href="/cdn-cgi/l/email-protection#e2a0908b86858796cca1979090838ca28c9081cc858d94"><span class="__cf_email__" data-cfemail="a4e6d6cdc0c3c1d08ae7d1d6d6c5cae4cad6c78ac3cbd2">[email&#160;protected]</span></a>. For technical 
questions, contact the individual(s) listed in the For Further 
Information Contact section of this document.
    <bullet> Mail comments to: Office of Nuclear Material Safety and 
Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, ATTN: Guidance and Publications Branch.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Susan Lent, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-1365; email: <a href="/cdn-cgi/l/email-protection#cb98beb8aaa5e587aea5bf8b859988e5aca4bd"><span class="__cf_email__" data-cfemail="60331513010e4e2c050e14202e32234e070f16">[email&#160;protected]</span></a>.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2026-4390, facility name, unit 
number(s), docket number(s), application date, and subject when 
contacting the NRC about the availability of information for this 
action. You may obtain publicly available information related to this 
action by any of the following methods:
    <bullet> Federal Rulemaking website: Go to <a href="https://www.regulations.gov">https://www.regulations.gov</a> and search for Docket ID NRC-2026-4390.
    <bullet> NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at <a href="https://www.nrc.gov/reading-rm/adams.html">https://www.nrc.gov/reading-rm/adams.html</a>. To begin the search, select ``Begin ADAMS Public Search.'' 
For problems with ADAMS, please contact the NRC's Public Document Room 
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email 
to <a href="/cdn-cgi/l/email-protection#edbda9bfc3bf889e82989f8e88ad839f8ec38a829b"><span class="__cf_email__" data-cfemail="ecbca8bec2be899f83999e8f89ac829e8fc28b839a">[email&#160;protected]</span></a>. For the convenience of the reader, 
instructions about obtaining materials referenced in this document are 
provided in the ``Availability of Documents'' section.
    <bullet> NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
<a href="/cdn-cgi/l/email-protection#752531275b2710061a00071610351b07165b121a03"><span class="__cf_email__" data-cfemail="772733255925120418020514123719051459101801">[email&#160;protected]</span></a> or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. Eastern Time (ET), Monday through Friday, except 
Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (<a href="https://www.regulations.gov">https://www.regulations.gov</a>). Please 
include Docket ID NRC-2026-4390, facility name, unit number(s), docket 
number(s), application date, and subject, in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
<a href="https://www.regulations.gov">https://www.regulations.gov</a> as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment

[[Page 58474]]

submissions available to the public or entering the comment into ADAMS.

II. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses and Combined Licenses and Proposed no Significant 
Hazards Consideration Determination

    For the facility-specific amendment requests shown in this notice, 
the Commission finds that the licensees' analyses provided, consistent 
with section 50.91 of title 10 of the Code of Federal Regulations (10 
CFR) ``Notice for public comment; State consultation,'' are sufficient 
to support the proposed determinations that these amendment requests 
involve NSHC. Under the Commission's regulations in 10 CFR 50.92, 
operation of the facilities in accordance with the proposed amendments 
would not (1) involve a significant increase in the probability or 
consequences of an accident previously evaluated; or (2) create the 
possibility of a new or different kind of accident from any accident 
previously evaluated; or (3) involve a significant reduction in a 
margin of safety.
    The Commission is seeking public comments on these proposed 
determinations. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determinations.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue any of these license amendments before expiration 
of the 60-day period provided that its final determination is that the 
amendment involves NSHC. In addition, the Commission may issue any of 
these amendments prior to the expiration of the 30-day comment period 
if circumstances change during the 30-day comment period such that 
failure to act in a timely way would result, for example in derating or 
shutdown of the facility. If the Commission takes action on any of 
these amendments prior to the expiration of either the comment period 
or the notice period, it will publish in the Federal Register a notice 
of issuance. If the Commission makes a final NSHC determination for any 
of these amendments, any hearing will take place after issuance. The 
Commission expects that the need to take action on any amendment before 
60 days have elapsed will occur very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by any of these 
actions may file a request for a hearing and petition for leave to 
intervene (petition) with respect to that action. Petitions shall be 
filed in accordance with the Commission's ``Agency Rules of Practice 
and Procedure'' in 10 CFR part 2. Interested persons should consult 10 
CFR 2.309. If a petition is filed, the Commission or a presiding 
officer will rule on the petition and, if appropriate, a notice of a 
hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration, which will serve to establish when 
the hearing is held. If the final determination is that the license 
amendment request involves no significant hazards consideration, the 
Commission may issue the amendment and make it immediately effective, 
notwithstanding the request for a hearing. Any hearing would take place 
after issuance of the amendment. If the final determination is that the 
license amendment request involves a significant hazards consideration, 
then any hearing held would take place before the issuance of the 
amendment unless the Commission finds an imminent danger to the health 
or safety of the public, in which case it will issue an appropriate 
order or rule under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or designated agency thereof, may submit a petition to the 
Commission to participate as a party under 10 CFR 2.309(h) no later 
than 60 days from the date of publication of this notice. 
Alternatively, a State, local governmental body, Federally recognized 
Indian Tribe, or designated agency thereof, may participate as a non-
party under 10 CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (<a href="https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053">https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053</a>) and the NRC's public website 
(<a href="https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate">https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate</a>).

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056), and on the NRC's public website 
(<a href="https://www.nrc.gov/site-help/e-submittals.html">https://www.nrc.gov/site-help/e-submittals.html</a>).
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at <a href="/cdn-cgi/l/email-protection#cf87aaaebda6a1a8e18ba0aca4aabb8fa1bdace1a8a0b9"><span class="__cf_email__" data-cfemail="b1f9d4d0c3d8dfd69ff5ded2dad4c5f1dfc3d29fd6dec7">[email&#160;protected]</span></a>, or by 
telephone at 301-415-1677, to: (1) request a digital identification 
(ID) certificate, which allows the participant (or their counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or their counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website (<a href="https://www.nrc.gov/site-help/e-submittals/getting-started.html">https://www.nrc.gov/site-help/e-submittals/getting-started.html</a>). After a digital ID certificate is 
obtained and a docket is created, the participant must submit 
adjudicatory documents in the Portable Document Format. Guidance on 
submissions is available on the NRC's public website (https://
www.nrc.gov/

[[Page 58475]]

site-help/electronic-sub-ref-mat.html). A filing is considered complete 
at the time the document is submitted through the NRC's E-Filing 
system. To be timely, an electronic filing must be submitted to the E-
Filing system no later than 11:59 p.m. ET on the due date. Upon receipt 
of a transmission, the E-Filing system time-stamps the document and 
sends the submitter an email confirming receipt of the document. The E-
Filing system also distributes an email that provides access to the 
document to the NRC's Office of the General Counsel and any others who 
have advised the Office of the Secretary that they wish to participate 
in the proceeding, so that the filer need not serve the document on 
those participants separately. Therefore, applicants and other 
participants (or their counsel or representative) must apply for and 
receive a digital ID certificate before adjudicatory documents are 
filed in order to obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website (<a href="https://www.nrc.gov/site-help/e-submittals.html">https://www.nrc.gov/site-help/e-submittals.html</a>), by 
email to <a href="/cdn-cgi/l/email-protection#28657b606c067a4d5b475d5a4b4d68465a4b064f475e"><span class="__cf_email__" data-cfemail="e9a4baa1adc7bb8c9a869c9b8a8ca9879b8ac78e869f">[email&#160;protected]</span></a>, or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available on the 
NRC's public website (<a href="https://ehd.nrc.gov">https://ehd.nrc.gov</a>), unless otherwise excluded 
pursuant to an order of the presiding officer. If you do not have an 
NRC-issued digital ID certificate as previously described, click 
``cancel'' when the link requests certificates and you will be 
automatically directed to the NRC's electronic hearing docket where you 
will be able to access any publicly available documents in a particular 
hearing docket. Participants are requested not to include personal 
privacy information such as social security numbers, home addresses, or 
personal phone numbers in their filings, unless an NRC regulation or 
other law requires submission of such information. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants should not include copyrighted materials in 
their submission.
    The following table provides the plant name, docket number, date of 
application, ADAMS accession number, and location in the application of 
the licensees' proposed NSHC determinations. For further details with 
respect to these license amendment applications, see the applications 
for amendment, which are available for public inspection in ADAMS. For 
additional direction on accessing information related to this document, 
see the ``Obtaining Information and Submitting Comments'' section of 
this document.

                       License Amendment Requests
------------------------------------------------------------------------
 
------------------------------------------------------------------------
 Constellation Energy Generation, LLC; Braidwood Station, Units 1 and 2,
   Will County, IL; Byron Station, Unit Nos. 1 and 2, Ogle County, IL
------------------------------------------------------------------------
Docket Nos...................  50-456, 50-457, 50-454, 50-455.
Application date.............  July 13, 2026.
ADAMS Accession No...........  ML26195A015.
Location in Application of     Pages 32-34 of Attachment 1.
 NSHC.
Brief Description of           The proposed amendments would modify the
 Amendments.                    Braidwood and Byron licensing basis to
                                implement a change to the approved
                                voluntary implementation of the
                                provisions of 10 CFR section 50.69,
                                ``Risk-informed categorization and
                                treatment of structures, systems and
                                components for nuclear power reactors.''
                                The proposed amendments would
                                incorporate the use of an alternative
                                seismic categorization process and an
                                enhanced passive categorization
                                methodology into the previously approved
                                10 CFR 50.69 categorization process.
Proposed Determination.......  NSHC.
Name of Attorney for           Jason Zorn, Associate General Counsel,
 Licensee, Mailing Address.     Constellation Energy Generation, LLC,
                                4300 Winfield Road, Warrenville, IL
                                60555.
NRC Project Manager,           Scott Wall, 301-415-2855.
 Telephone Number.
------------------------------------------------------------------------
 Constellation Energy Generation, LLC; Braidwood Station, Units 1 and 2;
  Will County, IL; Constellation Energy Generation, LLC; Byron Station,
  Unit Nos. 1 and 2; Will County, IL; Constellation Energy Generation,
 LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Calvert County,
  MD; Constellation Energy Generation, LLC; Clinton Power Station, Unit
 No. 1; DeWitt County, IL; Constellation Energy Generation, LLC; Dresden
 Nuclear Power Station, Units 2 and 3; Grundy County, IL; Constellation
Energy Generation, LLC; Constellation FitzPatrick, LLC and Constellation
Energy Generation, LLC; James A. FitzPatrick Nuclear Power Plant; Oswego
 County, NY; LaSalle County Station, Units 1 and 2; LaSalle County, IL;
Constellation Energy Generation, LLC; Limerick Generating Station, Units
  1 and 2; Montgomery County, PA; Constellation Energy Generation, LLC;
      Nine Mile Point Nuclear Station, LLC and Constellation Energy
 Generation, LLC; Nine Mile Point Nuclear Station, Units 1 and 2; Oswego
   County, NY; Peach Bottom Atomic Power Station, Units 2 and 3; York
  County, PA; Constellation Energy Generation, LLC; Quad Cities Nuclear
    Power Station, Units 1 and 2; Rock Island County, IL; R. E. Ginna
Nuclear Power Plant, LLC and Constellation Energy Generation, LLC; R. E.
               Ginna Nuclear Power Plant; Wayne County, NY
------------------------------------------------------------------------
Docket Nos...................  50-456, 50-457, 50-454, 50-455, 50-317,
                                50-318, 50-461, 50-237, 50-249, 50-333,
                                50-373, 50-374, 50-352, 50-353, 50-220,
                                50-410, 50-277, 50-278, 50-254, 50-265,
                                50-244.
Application date.............  July 31, 2026.
ADAMS Accession No...........  ML26212A423.

[[Page 58476]]

 
Location in Application of     Pages 7-8 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendments would revise each
 Amendments.                    unit's technical specifications for the
                                Ventilation Filter Testing Program to
                                permit the use of alternate challenge
                                agents when performing in place testing
                                of engineered safety feature ventilation
                                system high efficiency particulate air
                                filters and charcoal adsorbers. The
                                proposed changes are being requested in
                                accordance with Technical Specification
                                Task Force (TSTF) Traveler TSTF-602,
                                Revision 0, ``Revise the Ventilation
                                Filter Testing Program to Permit
                                Alternate Challenge Agents.''
Proposed Determination.......  NSHC.
Name of Attorney for           Jason Zorn, Associate General Counsel,
 Licensee, Mailing Address.     Constellation Energy Generation, LLC,
                                4300 Winfield Road, Warrenville, IL
                                60555.
NRC Project Manager,           Scott Wall, 301-415-2855.
 Telephone Number.
------------------------------------------------------------------------
 Dominion Energy South Carolina, Inc.; Virgil C. Summer Nuclear Station,
                      Unit 1, Fairfield County, SC
------------------------------------------------------------------------
Docket No....................  50-395.
Application date.............  August 24, 2026.
ADAMS Accession No...........  ML26237A251.
Location in Application of     Pages 4-6 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendment would adopt
 Amendment.                     Technical Specification Task Force
                                (TSTF) Traveler TSTF-585, ``Revise LCO
                                [Limiting Condition for Operation] 3.0.3
                                to Require Managing Risk.'' TSTF-585
                                revises LCO 3.0.3 to require assessing
                                and managing plant risk whenever LCO
                                3.0.3 is entered. If the risk assessment
                                determines that continuing plant
                                operation is acceptable and other
                                conditions are satisfied, 24 hours from
                                entry into LCO 3.0.3 is permitted to
                                initiate a shutdown. Otherwise,
                                initiation of the shutdown is required
                                immediately. The proposed amendment
                                would also revise or add some TS
                                Required Actions to direct a plant
                                shutdown instead of entry into LCO
                                3.0.3.
Proposed Determination.......  NSHC.
Name of Attorney for           William (Bill) S. Blair, Senior Counsel,
 Licensee, Mailing Address.     Dominion Energy, Inc., 120 Tredegar
                                Street, RS-2, Richmond, VA 23219.
NRC Project Manager,           Robert Kuntz, 301-415-3733.
 Telephone Number.
------------------------------------------------------------------------
 Nebraska Public Power District; Cooper Nuclear Station; Nemaha County,
                                   NE
------------------------------------------------------------------------
Docket No....................  50-298.
Application date.............  June 17, 2026.
ADAMS Accession No...........  ML26168A423.
Location in Application of     Pages 2-4 of Attachment 1.
 NSHC.
Brief Description of           The proposed amendment would adopt
 Amendment.                     Technical Specifications Task Force
                                (TSTF) Traveler TSTF-602, ``Revise the
                                Ventilation Filter Testing Program to
                                Permit Alternate Challenge Agents,''
                                which is an approved change to the
                                Standard Technical Specifications, into
                                the Cooper Nuclear Station's technical
                                specifications. TSTF-602 revises the
                                Ventilation Filter Testing Program to
                                permit the use of alternate challenge
                                agents when performing in place testing
                                of Engineered Safety Feature ventilation
                                system high efficiency particulate air
                                filters and charcoal adsorbers.
Proposed Determination.......  NSHC.
Name of Attorney for           John C. McClure, Executive Vice President
 Licensee, Mailing Address.     External Affairs and General Counsel,
                                Nebraska Public Power District, P.O. Box
                                499, Columbus, NE 68601.
NRC Project Manager,           Thomas Byrd, 301-415-3719.
 Telephone Number.
------------------------------------------------------------------------
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Docket Nos...................  52-025, 52-026.
Application date.............  July 23, 2026.
ADAMS Accession No...........  ML26204A273.
Location in Application of     Pages E-10-E-12 of the Enclosure.
 NSHC.
Brief Description of           The proposed license amendments would
 Amendment(s).                  revise the Vogtle Electric Generating
                                Plant, Units 3 and 4, Combined License
                                to adopt a license condition providing
                                provisions for making changes to the
                                Fire Protection Program.
Proposed Determination.......  NSHC.
Name of Attorney for           Millicent Ronnlund, Vice President and
 Licensee, Mailing Address.     General Counsel, Southern Nuclear
                                Operating Co., Inc., P. O. Box 1295,
                                Birmingham, AL 35201-1295.
NRC Project Manager,           Zachary Turner 301-415-6303.
 Telephone Number.
------------------------------------------------------------------------

III. Notice of Issuance of Amendments to Facility Operating Licenses 
and Combined Licenses

    During the period since publication of the last biweekly notice, 
the Commission has issued the following amendments. The Commission has 
determined for each of these amendments that the application complies 
with the standards and requirements of the Atomic Energy Act of 1954, 
as amended (the Act), and the Commission's rules and regulations. The 
Commission has made appropriate findings as required by the Act and the 
Commission's rules and regulations in 10 CFR chapter I, which are set 
forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed NSHC 
determination, and opportunity for a hearing in connection with these

[[Page 58477]]

actions, were published in the Federal Register as indicated in the 
safety evaluation for each amendment.
    Unless otherwise indicated, the Commission has determined that 
these amendments satisfy the criteria for categorical exclusion in 
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), 
no environmental impact statement or environmental assessment need be 
prepared for these amendments. If the Commission has prepared an 
environmental assessment under the special circumstances provision in 
10 CFR 51.22(b) and has made a determination based on that assessment, 
it is so indicated in the safety evaluation for the amendment.
    For further details with respect to each action, see the amendment 
and associated documents such as the Commission's letter and safety 
evaluation, which may be obtained using the ADAMS accession numbers 
indicated in the following table. The safety evaluation will provide 
the ADAMS accession numbers for the application for amendment and the 
Federal Register citation for any environmental assessment. All of 
these items can be accessed as described in the ``Obtaining Information 
and Submitting Comments'' section of this document.

                       License Amendment Issuances
------------------------------------------------------------------------
 
------------------------------------------------------------------------
Constellation Energy Generation, LLC; Clinton Power Station, Unit No. 1;
DeWitt County, IL; Constellation Energy Generation, LLC; Dresden Nuclear
  Power Station, Units 2 and 3; Grundy County, IL; Constellation Energy
 Generation, LLC; LaSalle County Station, Units 1 and 2; LaSalle County,
   IL; Constellation Energy Generation, LLC; Peach Bottom Atomic Power
      Station, Units 2 and 3; York County, PA; Constellation Energy
 Generation, LLC; Quad Cities Nuclear Power Station, Units 1 and 2; Rock
                            Island County, IL
------------------------------------------------------------------------
Docket Nos...................  50-461, 50-237, 50-249, 50-373, 50-374,
                                50-277, 50-278, 50-254, 50-265.
Amendment Date...............  August 19, 2026.
ADAMS Accession No...........  ML26219A154.
Amendment No(s)..............  271 (LaSalle, Unit 1), 255 (LaSalle, Unit
                                2).
Brief Description of           For LaSalle--These amendments remove Trip
 Amendments.                    Function 1.e, ``Main Steam Line Tunnel
                                Differential Temperature--High,'' from
                                Table 3.3.6.1-1, ``Primary Containment
                                Isolation Instrumentation.'' Two
                                corresponding Notes in the Actions
                                section of Technical Specification (TS)
                                3.3.6.1 are also proposed for deletion.
                                Additionally, a new TS, ``Main Steam
                                Line (MSL) Area Temperature,'' would be
                                added requiring manual action when the
                                MSL area temperature is above the
                                temperature limit. On April 8, 2026
                                (ML26098A336), the licensee withdrew its
                                applications for Dresden and Quad
                                Cities. On July 7, 2026 (ML26188A207),
                                the licensee withdrew its applications
                                for Peach Bottom. On May 15, 2026
                                (ML26092A109), the NRC issued Amendment
                                No. 259 for Clinton.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Constellation Energy Generation, LLC; Limerick Generating Station, Units
                     1 and 2; Montgomery County, PA
------------------------------------------------------------------------
Docket Nos...................  50-352, 50-353.
Amendment Date...............  August 7, 2026.
ADAMS Accession No...........  ML26205A118.
Amendment Nos................  271 (Unit1) and 234 (Unit 2).
Brief Description of           The amendments revised the technical
 Amendments.                    specification surveillance requirements
                                by removing information regarding the
                                acceptable means for determining drywell
                                average air temperature and placing such
                                information in the technical
                                specifications bases.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2;
                            Salem County, NJ
------------------------------------------------------------------------
Docket Nos...................  50-272, 50-311.
Amendment Date...............  August 18, 2026.
ADAMS Accession No...........  ML26181A019.
Amendment Nos................  356 (Unit 1) and 338 (Unit 2).
Brief Description of           The amendments revised emergency diesel
 Amendments.                    generator (EDG) starting and load run
                                test surveillance requirements and
                                required actions when certain equipment
                                is inoperable. Specifically, the
                                amendments (1) revised the required
                                actions for testing operable EDGs when
                                offsite circuits are inoperable, (2)
                                split the current surveillance
                                requirement combining the EDG starting
                                test and load run test into two separate
                                surveillance requirements, and (3)
                                revised required actions for consistency
                                with a previously approved extended
                                allowed outage time for the EDGs.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and
  3; Limestone County, AL; Tennessee Valley Authority; Sequoyah Nuclear
 Plant, Units 1 and 2; Hamilton County, TN; Tennessee Valley Authority;
         Watts Bar Nuclear Plant, Units 1 and 2; Rhea County, TN
------------------------------------------------------------------------
Docket Nos...................  50-259, 50-260, 50-296, 50-327, 50-328,
                                50-390, 50-391.
Amendment Date...............  August 19, 2026.
ADAMS Accession No...........  ML26197A196.
Amendment Nos................  343 (Browns Ferry, Unit 1); 366 (Browns
                                Ferry, Unit 2); 326 (Browns Ferry, Unit
                                3); 377 (Sequoyah, Unit 1); 372
                                (Sequoyah, Unit 2); 183 (Watts Bar, Unit
                                1); and 88 (Watts Bar, Unit 2).

[[Page 58478]]

 
Brief Description of           The amendments revised the Browns Ferry
 Amendments.                    Nuclear Plant, Units 1, 2, and 3;
                                Sequoyah Nuclear Plant, Units 1 and 2;
                                and Watts Bar Nuclear Plant, Units 1 and
                                2, technical specifications for the
                                Ventilation Filter Testing Program to
                                permit the use of alternate challenge
                                agents when testing filters and charcoal
                                adsorber beds.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2; Rhea
                               County, TN
------------------------------------------------------------------------
Docket Nos...................  50-390, 50-391.
Amendment Date...............  August 19, 2026.
ADAMS Accession No...........  ML26222A207.
Amendment Nos................  184 (Unit 1) and 89 (Unit 2).
Brief Description of           The amendments made various revisions to
 Amendments.                    Watts Bar Nuclear Plant, Units 1 and 2,
                                Technical Specification (TS) 3.7.3,
                                ``Main Feedwater Isolation Valves
                                (MFIVs) and Main Feedwater Regulation
                                Valves (MFRVs) and Associated Bypass
                                Valves,'' to make the TS consistent with
                                the Westinghouse Standard TS as well as
                                with the revision to TS Table 3.3.2-1,
                                ``Engineered Safety Feature Actuation
                                System Instrumentation,'' that was
                                approved in Amendment Nos. 173 and 78,
                                for Units 1 and 2, respectively.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO
------------------------------------------------------------------------
Docket No....................  50-483.
Amendment Date...............  August 20, 2026.
ADAMS Accession No...........  ML26194A094.
Amendment No.................  243.
Brief Description of           The amendment revised the Technical
 Amendment.                     Specifications (TSs) for Callaway Plant,
                                Unit 1, to adopt the changes described
                                in Technical Specifications Task Force
                                (TSTF) Traveler-585, ``Revise LCO
                                [Limiting Condition for Operation] 3.0.3
                                to Require Managing Risk.''
                                Specifically, the amendment revised LCO
                                3.0.3 to require a risk assessment and
                                implementation of appropriate risk
                                management actions within 6 hours of
                                entry into LCO 3.0.3, and modified the
                                actions and completion times associated
                                with certain shutdown requirements. The
                                amendment affected TS LCO 3.0.3 (LCO
                                Applicability), TS 3.7.2 (Main Steam
                                Isolation Valves, Main Steam Isolation
                                Valve Bypass Valves, and Main Steam Low
                                Point Drain Isolation Valves), TS 3.8.4
                                (DC [direct current] Sources--
                                Operating), and TS 3.8.9 (Distribution
                                Systems--Operating).
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
  Virginia Electric and Power Company, Dominion Nuclear Company; North
          Anna Power Station, Units 1 and 2; Louisa County, VA
------------------------------------------------------------------------
Docket Nos...................  50-338, 50-339.
Amendment Date...............  August 25, 2026.
ADAMS Accession No...........  ML26208A113.
Amendment Nos................  300 (Unit 1), 283 (Unit 2).
Brief Description of           The amendments adopted Technical
 Amendments.                    Specification Task Force (TSTF) Traveler-
                                585, ``Revise LCO [Limiting Condition
                                for Operation] 3.0.3 to Require Managing
                                Risk.''
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station,
                        Unit 1; Coffey County, KS
------------------------------------------------------------------------
Docket No....................  50-482.
Amendment Date...............  August 13, 2026.
ADAMS Accession No...........  ML26196A262.
Amendment No.................  248.
Brief Description of           The amendment adopted 10 CFR 50.69,
 Amendment.                     ``Risk-informed categorization and
                                treatment of structures, systems and
                                components for nuclear power reactors.''
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station,
                        Unit 1; Coffey County, KS
------------------------------------------------------------------------
Docket No....................  50-482.
Amendment Date...............  August 24, 2026.
ADAMS Accession No...........  ML26203A009.
Amendment No.................  249.
Brief Description of           The amendment revised Technical
 Amendment.                     Specifications 1.1, ``Definitions'' and
                                5.5, ``Programs and Manuals,'' to use
                                the Analysis and Measurement Services
                                Corporation online monitoring (OLM)
                                methodology as the technical basis to
                                change from time-based surveillance
                                frequency for channel calibrations to a
                                condition-based calibration frequency
                                based on OLM results.

[[Page 58479]]

 
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------


 License Amendment Request--Repeat of Individual Federal Register Notice
------------------------------------------------------------------------
 
------------------------------------------------------------------------
  STP Nuclear Operating Company; South Texas Project, Unit 1; Matagorda
                               County, TX
------------------------------------------------------------------------
Docket No....................  50-498.
Application Date.............  August 6, 2026.
ADAMS Accession No...........  ML26218A279.
Brief Description of           The proposed amendment would, if granted,
 Amendment.                     make a one-time exigent change to the
                                Technical Specifications (TSs) to extend
                                the allowed outage time for TS 3.7.1.7,
                                ``Main Feedwater System.'' The proposed
                                amendment is being requested to
                                facilitate repairs to the Unit 1 train D
                                main feedwater isolation valve and is
                                being requested under exigent
                                circumstances pursuant to NRC
                                regulations.
Date & Cite of Federal         8/26/2026 (91 FR 55125).
 Register Individual Notice.
Expiration Dates for Public    9/9/2026 (public comments) and 10/26/2026
 Comments & Hearing Requests.   (hearing requests).
------------------------------------------------------------------------


(Authority: 42 U.S.C. 2011 et seq.)

    Dated: September 10, 2026.

    For the Nuclear Regulatory Commission.
Ilka Berrios,
Chief, Operating Reactor Licensing Branch 3, Division of Licensing 
Projects 1, Office of Nuclear Reactor Regulation.
[FR Doc. 2026-18783 Filed 9-14-26; 8:45 am]
BILLING CODE 7590-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 15, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.