City of Sturgis, Michigan; Notice of Application for Temporary Variance Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 4, 2026

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 171 (Friday, September 4, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 171 (Friday, September 4, 2026)]
[Notices]
[Pages 56873-56874]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-18149]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2964-046]


City of Sturgis, Michigan; Notice of Application for Temporary 
Variance Accepted for Filing, Soliciting Comments, Motions To 
Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Temporary variance from impoundment elevation.
    b. Project No: 2964-046.
    c. Date Filed: July 31, 2026.
    d. Applicant: City of Sturgis, Michigan.
    e. Name of Project: Sturgis Hydroelectric Project.
    f. Location: The project is located on the St. Joseph River in St. 
Joseph County, Michigan. The project does not occupy any federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Chris McArthur, Electric Superintendent, City 
of Sturgis, Michigan, 206 E West Street, Sturgis, MI 49091, 
<a href="/cdn-cgi/l/email-protection#f99a949a988b8d918c8bb98a8d8c8b9e908a9490d79e968f"><span class="__cf_email__" data-cfemail="caa9a7a9abb8bea2bfb88ab9bebfb8ada3b9a7a3e4ada5bc">[email&#160;protected]</span></a>, (269) 659-7298.
    i. FERC Contact: Selina Sumi, (202) 502-6892, <a href="/cdn-cgi/l/email-protection#7f0c1a1316111e510c0a12163f191a0d1c51181009"><span class="__cf_email__" data-cfemail="5d2e383134333c732e2830341d3b382f3e733a322b">[email&#160;protected]</span></a>.
    j. Cooperating agencies: With this notice, the Commission is 
inviting federal, state, local, and Tribal agencies with jurisdiction 
and/or special expertise with respect to environmental issues affected 
by the proposal, that wish to cooperate in the preparation of any 
environmental document, if applicable, to follow the instructions for 
filing such requests described in item k below. Cooperating agencies 
should note the Commission's policy that agencies that cooperate in the 
preparation of any environmental document cannot also intervene. See 94 
FERC ] 61,076 (2001).
    k. Deadline for filing comments, motions to intervene, and 
protests: October 1, 2026 5:00 p.m. Eastern Time.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. For assistance, please contact FERC Online 
Support at <a href="/cdn-cgi/l/email-protection#25636077666a4b494c4b40765055554a575165434057460b424a53"><span class="__cf_email__" data-cfemail="73353621303c1d1f1a1d16200603031c010733151601105d141c05">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, you may submit a 
paper copy. Submissions sent via the U.S. Postal Service must be 
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, MD 20852. The first page of any filing 
should include the docket number P-2964-046. Comments emailed to 
Commission staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.

[[Page 56874]]

    l. Description of Request: The applicant requests Commission 
approval for a temporary variance from the impoundment elevation 
requirements set forth in condition 1.1 of the Michigan Department of 
Environment, Great Lakes, and Energy's water quality certification to 
facilitate a scheduled drawdown of the project impoundment. The purpose 
of the drawdown is to mitigate risk during construction of several 
critical dam safety improvements. The proposed variance would allow the 
licensee to address ongoing seepage issues at the toe of slope of the 
main earthen embankment and stability issues with the downstream slope 
of the earthen embankment. Additional improvement works combined with 
the main earthen embankment repair includes raising the crest of the 
detached earthen embankment, raising the concrete spillway abutment 
wall, removing and replacing the grout mattress with riprap on the 
upstream earthen embankment slope, construction of an Americans with 
Disabilities Act (ADA) compliant path to the St. Joseph River, and 
addressing surface drainage along the toe of the dam and access road. 
The licensee would lower the impoundment approximately 2.9 feet to an 
elevation of 822.7 National Geodetic Vertical Datum (NGVD 29). The 
drawdown of the impoundment is scheduled to begin after Labor Day 
(i.e., after September 7, 2026) and would utilize a drawdown rate not 
to exceed one-half foot (or six inches) per 24-hour period. The 
drawdown is proposed to be completed no later than September 15, 2026. 
Proposed construction activities associated with the dam would not be 
complete prior to October 15, 2027, and the impoundment is proposed to 
remain in its lowered state until April 2028.
    m. Locations of the Application: This filing may be viewed on the 
Commission's website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
<a href="/cdn-cgi/l/email-protection#85c3c0d7c6caebe9ecebe0d6f0f5f5eaf7f1c5e3e0f7e6abe2eaf3"><span class="__cf_email__" data-cfemail="460003140509282a2f282315333636293432062023342568212930">[email&#160;protected]</span></a>, for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    p. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; and (3) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, motions to intervene, or 
protests must set forth their evidentiary basis. Any filing made by an 
intervenor must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 385.2010.
    q. For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#2c637c7c6c4a495e4f024b435a"><span class="__cf_email__" data-cfemail="c28d929282a4a7b0a1eca5adb4">[email&#160;protected]</span></a>.

(Authority: 18 CFR 2.1)

    Dated: September 1, 2026.
Carlos D. Clay,
Deputy Secretary.
    .
[FR Doc. 2026-18149 Filed 9-3-26; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>