Notice of Availability of the Final Environmental Impact Statement and Record of Decision for Navajo Transitional Energy Company's Navajo Mine No Name SMCRA Permit

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 1, 2026

Issuing agencies

Interior DepartmentSurface Mining Reclamation and Enforcement Office

Abstract

The Office of Surface Mining Reclamation and Enforcement (OSM) is publishing this notice to announce that it has prepared a Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) for Navajo Transitional Energy Company's (NTEC) proposed Surface Mining Control and Reclamation Act of 1977 (SMCRA) permit for the No Name Permit area within NTEC's existing Navajo Mine Lease 14-20-603-2505.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 168 (Tuesday, September 1, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 168 (Tuesday, September 1, 2026)]
[Notices]
[Pages 56204-56205]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-17785]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Office of Surface Mining Reclamation and Enforcement

[S1D1S SS08011000 SX064A000 266S180110; S2D2S SS08011000 SX064A000 
26XS501520]


Notice of Availability of the Final Environmental Impact 
Statement and Record of Decision for Navajo Transitional Energy 
Company's Navajo Mine No Name SMCRA Permit

AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior.

ACTION: Notice of availability of the final environmental impact 
statement and record of decision.

-----------------------------------------------------------------------

SUMMARY: The Office of Surface Mining Reclamation and Enforcement (OSM) 
is publishing this notice to announce that it has prepared a Final 
Environmental Impact Statement (FEIS) and Record of Decision (ROD) for 
Navajo Transitional Energy Company's (NTEC) proposed Surface Mining 
Control and Reclamation Act of 1977 (SMCRA) permit for the No Name 
Permit area within NTEC's existing Navajo Mine Lease 14-20-603-2505.

DATES: The U.S. Environmental Protection Agency (EPA) will also publish 
a notice of availability in the Federal Register. In accordance with 
the National Environmental Policy Act (NEPA), its implementing 
regulations at 43 CFR part 46, and the Department of the Interior's 
(Department's) Handbook of NEPA procedures, OSM has issued a single 
document that consists of a FEIS and ROD, which is effective 
immediately.

ADDRESSES: The FEIS and ROD and documents pertinent to this project are 
available for review on OSM's website at: <a href="https://www.osmre.gov/laws-andregulations/nepa/projects">https://www.osmre.gov/laws-andregulations/nepa/projects</a>.

FOR FURTHER INFORMATION CONTACT: Marcelo Calle, Acting Regional 
Director, OSM Western Regions 5, 7-11, P.O. Box 25065, Lakewood, CO 
80225-0065; (303) 236-2929 or <a href="/cdn-cgi/l/email-protection#5d303e3c3131381d322e302f38733a322b"><span class="__cf_email__" data-cfemail="08656b6964646d48677b657a6d266f677e">[email&#160;protected]</span></a>.
    Individuals who use telecommunication devices for the deaf (TDD) 
may call the Federal Information Relay Service (FIRS) at 1-800-877-8339 
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday.

SUPPLEMENTARY INFORMATION: OSM Western Region, U.S. Department of the 
Interior Regions 5, 7-11, prepared an EIS for the No Name SMCRA Permit 
application (Project). In accordance with SMCRA, OSM must approve the 
Project, disapprove the Project, or approve the Project with conditions 
because the Project is on Indian lands, as that term is defined under 
SMCRA, including tribal lands with leased tribal coal (BIA Mine Lease 
14-20-603-2505). The lease agreement grants NTEC the right to mine 
within the lease area; however, mining cannot occur until a SMCRA 
permit is obtained. The Navajo Nation owns the surface and mineral 
rights of the entire lease area and the permit areas located within it.
    The No Name Permit area is located on the Navajo Nation 
approximately 22 miles from Farmington, New Mexico. The proposed 
surface coal mine is within NTEC's existing Navajo Mine Lease 14-20-
603-2505, located adjacent to the southern boundary of NTEC's existing 
Navajo Mine operating area (OSM Permit No. NM-0043A). The No Name 
Permit area covers 11,526 acres, completely within tribal lands, and 
the current surface land use is grazing. The Project would allow for 
9,042 acres of additional surface disturbance and production of 
502,984,700 tons of recoverable coal, extending the life of the mine to 
2136. The initial permit will be for five years with a right of renewal 
for the life of the mine as long as all legal requirements are met.

Purpose and Need for the Proposed Action

    OSM's purpose and need for the EIS is for OSM to analyze NTEC's 
SMCRA permit application package to mine Navajo Nation coal on 
approximately 11,526 acres from Areas 4 South and 5 within the Navajo 
Mine Lease Area (BIA 14-20-603-2505). Under the Department's Handbook 
of National Environmental Policy Act Implementing Procedures, 516 DM 1 
Section 2.2, ``when the proposed action concerns a bureau's duty to act 
on an application for authorization, the purpose and need for the 
proposed action will also be informed by the goals of the applicant.'' 
Here, NTEC informed OSM that NTEC's goal is to exercise its valid 
existing rights granted by the Navajo Nation under BIA Mine Lease No. 
14-20-603-25205 to access and mine Navajo Nation coal resources, to 
continue to provide coal to the Four Corners Power Plant for the 
duration of operations there, and to provide coal to future customers 
if the Four Corners Power Plant shuts down. NTEC was created by the 
Navajo Nation to exercise sovereignty over its natural resources.

Proposed Action and Alternatives

    The FEIS analyzes three alternatives: the No Action Alternative, 
the Proposed Action Alternative, and the Avoid Pinabete Arroyo 
Alternative.
    The No Action Alternative evaluates the effects of OSM not 
approving the Project. Under this alternative, NTEC would continue to 
be able to mine coal within its existing SMCRA permit boundaries but 
would not be authorized to expand the mine to include the proposed No 
Name Permit area covering an additional 11,526 acres, would not disturb 
9,042 acres of additional surface disturbance, and would not produce 
the approximately 502,984,700 tons of recoverable coal.
    The Proposed Action Alternative evaluates the effects of approval 
of a new SMCRA permit area within Area 4 South and Area 5 of NTEC's 
existing Navajo Mine Lease 14-20-603-2505, located on the western flank 
of the San Juan Structural Basin south of the Navajo Mine (the No Name 
SMCRA Permit), authorizing the disturbance of 9,042 acres and the 
production of approximately 502,984,700 tons of recoverable coal. Under 
this alternative, the life of the mine would depend on the rate of 
production. To account for this uncertainty, the Proposed Action 
considers two demand alternatives that were included in NTEC's permit

[[Page 56205]]

application package: (1) a low demand alternative--mining up to 5 
million tons of coal per year, and (2) a high demand alternative--
mining up to 15 million tons of coal per year. This alternative also 
considers the diversion of the Pinabete Arroyo into No Name Arroyo to 
mine in Area 4 South, as well as realignment of 7 miles of Burnham 
Road.
    The Avoid Pinabete Arroyo Alternative evaluates the effects of 
approval of the No Name SMCRA permit with a condition that avoids 
mining through Pinabete Arroyo in Area 4 South. The Avoid Pinabete 
Arroyo Alternative was identified during the scoping process. Under 
this alternative, there would be no need for a diversion of Pinabete 
Arroyo into No Name Arroyo, although mining equipment would need to 
cross the arroyo to access the areas west of Pinabete Arroyo. Because 
this alternative would reduce the area available for mining within the 
permit area, the total recovery of coal would be less than estimated 
for the Proposed Action.
    Based on the analyses contained in the FEIS, OSM selected the 
Proposed Action as the preferred alternative.

Summary of Expected Impacts

    The FEIS evaluated the following reasonably foreseeable effects of 
the Project:

<bullet> Air Quality and GHG Emissions
<bullet> Cultural Resources
<bullet> Fish and Wildlife
<bullet> Geology, Mineral Resources and Paleontology
<bullet> Hazardous and Solid Waste
<bullet> Public Health and Safety
<bullet> Land Use and Transportation
<bullet> Noise and Vibration
<bullet> Socioeconomics
<bullet> Vegetation and Invasive Species
<bullet> Visual Resources
<bullet> Water Resources and Hydrology

Anticipated Permits and Authorizations

    SMCRA permit.

Public Participation

    OSM issued a notice of intent (NOI) to prepare an EIS in the 
Federal Register on January 15, 2026, announced the NOI through a news 
release and on its website, and hosted a 20-day public scoping period. 
OSM requested public scoping comments to identify any additional 
relevant issues concerning the proposed SMCRA permit that should be 
evaluated in the EIS. Public comment on the Project was accepted 
through mail, email, and during a public scoping meeting. OSM received 
37 comment letters during the public scoping period. Comment letters 
received during the public scoping periods were reviewed, and a 
description of issues analyzed are summarized in the FEIS.

Lead and Cooperating Agencies

    OSM is the lead agency for this EIS. The Bureau of Land Management, 
Environmental Protection Agency, Navajo Nation Department of 
Agriculture, Navajo Nation Mineral Program, and Navajo Nation 
Department of Fish and Wildlife are cooperating agencies.

Decision Maker

    OSM.

OSM Decision

    Informed by, at a minimum, the material required at 30 CFR 746.13, 
including information prepared in compliance with NEPA, OSM must make a 
decision about the proposed No Name SMCRA permit application. As 
documented in the ROD, OSM will approve the No Name SMCRA permit 
application.

Marcelo Calle,
Acting Regional Director, Unified Regions 5 & 7-11.
[FR Doc. 2026-17785 Filed 8-31-26; 8:45 am]
BILLING CODE 4310-05-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 1, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.