Regulatory Relief From Locomotive Horn Sounding Pattern at Public Highway-Rail Grade Crossings
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
This final rule amends safety standards related to use of the locomotive horn to provide regulatory relief from the required pattern of sounding the locomotive horn in two long blasts, one short blast, and one long blast for locomotive engineers operating trains, locomotive consists, or individual locomotives that have stopped in close proximity to a public highway-rail grade crossing. This final rule allows locomotive engineers to vary the locomotive horn sounding pattern to one single blast of the horn as they enter the nearby public highway-rail grade crossing.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 167 (Monday, August 31, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 167 (Monday, August 31, 2026)]
[Rules and Regulations]
[Pages 55764-55767]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-17783]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
49 CFR Part 222
[Docket No. FRA-2025-0121]
RIN 2130-AD39
Regulatory Relief From Locomotive Horn Sounding Pattern at Public
Highway-Rail Grade Crossings
AGENCY: Federal Railroad Administration (FRA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This final rule amends safety standards related to use of the
locomotive horn to provide regulatory relief from the required pattern
of sounding the locomotive horn in two long blasts, one short blast,
and one long blast for locomotive engineers operating trains,
locomotive consists, or individual locomotives that have stopped in
close proximity to a public highway-rail grade crossing. This final
rule allows locomotive engineers to vary the locomotive horn sounding
pattern to one single blast of the horn as they enter the nearby public
highway-rail grade crossing.
DATES: This rule is effective September 30, 2026.
FOR FURTHER INFORMATION CONTACT: James Payne, Staff Director, Grade
Crossing and Trespasser Outreach Division, FRA, telephone: (202) 441-
2787, email: <a href="/cdn-cgi/l/email-protection#f8b299959d8bd6a89981969db89c978cd69f978e"><span class="__cf_email__" data-cfemail="5319323e36207d03322a3d3613373c277d343c25">[email protected]</span></a>; or Kathryn Gresham, Attorney Adviser,
FRA, telephone: (202) 577-7142, email: <a href="/cdn-cgi/l/email-protection#bef5dfcad6ccc7d090f9ccdbcdd6dfd3fedad1ca90d9d1c8"><span class="__cf_email__" data-cfemail="115a70657963687f3f5663746279707c51757e653f767e67">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
I. Background and Comments Received in Response to the NPRM
Consistent with Executive Order (E.O.) 14192, Unleashing Prosperity
Through Deregulation (90 FR 9065, Feb. 6, 2025), and E.O. 14219,
Ensuring Lawful Governance and Implementing the President's
``Department of Government Efficiency'' Deregulatory Initiative (90 FR
10583, Feb. 25, 2025), FRA is reviewing its regulatory requirements in
49 CFR parts 200 through 299 and repealing requirements that are
outdated and redundant.
The requirements related to the use of locomotive horns by FRA-
regulated entities are established in 49 CFR part 222, ``Use of
Locomotive Horns at Public Highway-Rail Grade Crossings.'' On July 1,
2025, FRA published a notice of proposed rulemaking (NPRM) seeking to
amend 49 CFR 222.21(d) to provide regulatory relief from the required
horn sounding pattern of two long blasts, one short blast, and one long
blast for locomotive engineers operating trains, locomotive consists,
or individual locomotives that have stopped in close proximity to a
public highway-rail grade crossing. 90 FR 28641 (July 1, 2025).
Currently, paragraph (d) of Sec. 222.21 permits locomotive
engineers operating trains, locomotive consists, or individual
locomotives that have stopped in close proximity to a public highway-
rail grade crossing to approach the nearby crossing and sound the
locomotive horn for less than the 15-second minimum horn sounding
duration required by paragraph (b)(2) of that section. However,
engineers operating this equipment that have stopped in close proximity
to a public highway-rail grade crossing are not permitted to vary the
horn sounding pattern of two long blasts, one short blast, and one long
blast, unless the engineer is at a location where public highway-rail
grade crossings are spaced closely together.\1\ Therefore, in the NPRM,
FRA proposed to allow engineers operating trains, locomotive consists,
or individual locomotives that have stopped in close proximity to a
public highway-rail grade crossing to vary the required locomotive horn
sounding pattern (to include providing one single blast of the
locomotive horn) as they enter the nearby public highway-rail grade
crossing.
---------------------------------------------------------------------------
\1\ See Sec. 222.21(a).
---------------------------------------------------------------------------
FRA received 12 comments in response to the NPRM.\2\ Nine comments
were submitted anonymously \3\ and
[[Page 55765]]
eight of these anonymous comments supported the flexibility provided by
the NPRM. One anonymous comment opposed the NPRM, expressing concern
with the adequacy of the warning provided by a single blast of the
locomotive horn. FRA also received a comment from an individual, self-
described as a person who has been living near a gated crossing for
more than 30 years, in full support of the changes proposed in the
NPRM.\4\
---------------------------------------------------------------------------
\2\ <a href="https://www.regulations.gov/docket/FRA-2025-0121/comments">https://www.regulations.gov/docket/FRA-2025-0121/comments</a>.
\3\ <a href="https://www.regulations.gov/comment/FRA-2025-0121-0005">https://www.regulations.gov/comment/FRA-2025-0121-0005</a>;
<a href="https://www.regulations.gov/comment/FRA-2025-0121-0006">https://www.regulations.gov/comment/FRA-2025-0121-0006</a>; <a href="https://www.regulations.gov/comment/FRA-2025-0121-0008">https://www.regulations.gov/comment/FRA-2025-0121-0008</a>; <a href="https://www.regulations.gov/comment/FRA-2025-0121-0009">https://www.regulations.gov/comment/FRA-2025-0121-0009</a>; <a href="https://www.regulations.gov/comment/FRA-2025-0121-0010">https://www.regulations.gov/comment/FRA-2025-0121-0010</a>; <a href="https://www.regulations.gov/comment/FRA-2025-0121-0002">https://www.regulations.gov/comment/FRA-2025-0121-0002</a>; <a href="https://www.regulations.gov/comment/FRA-2025-0121-0007">https://www.regulations.gov/comment/FRA-2025-0121-0007</a>; <a href="https://www.regulations.gov/comment/FRA-2025-0121-0011">https://www.regulations.gov/comment/FRA-2025-0121-0011</a>; <a href="https://www.regulations.gov/comment/FRA-2025-0121-0004">https://www.regulations.gov/comment/FRA-2025-0121-0004</a>.
\4\ <a href="https://www.regulations.gov/comment/FRA-2025-0121-0003">https://www.regulations.gov/comment/FRA-2025-0121-0003</a>.
---------------------------------------------------------------------------
The Brotherhood of Locomotive Engineers and Trainmen (BLET)
submitted comments in support of the flexibility proposed in the NPRM.
Although BLET recommended that FRA retain the locomotive horn sounding
pattern required by Sec. 222.21(a) as the default rule for use in most
situations, BLET also commented that its locomotive engineer members
``would welcome the allowance to use discretion to use one single horn
blast when they enter onto a crossing at grade, after being stopped in
close proximity.'' \5\
---------------------------------------------------------------------------
\5\ Docket No. FRA-2025-0121-0003, p. 1.
---------------------------------------------------------------------------
The Transportation Division of the International Association of
Sheet Metal, Air, Rail and Transportation Workers (SMART-TD) submitted
comments opposing the NPRM. SMART-TD noted that the horn sounding
pattern required by Sec. 222.21(a) provides motorists, pedestrians,
and communities with a predictable and recognizable warning that a
train is approaching. The comment asserted that the proposed
flexibility would introduce ambiguity and reduce the clarity of the
warning provided at grade crossings. Further, SMART-TD challenged FRA's
assertion that the NPRM would reduce burdens on railroads and
surrounding communities, contending that the existing horn sounding
pattern requirement carries no meaningful cost to railroads and that
the changes proposed in the NPRM would weaken FRA's safety regulations
and result in social and economic costs from increased collisions,
injuries, fatalities, and subsequent litigation.\6\
---------------------------------------------------------------------------
\6\ Docket No. FRA-2025-0121-0013.
---------------------------------------------------------------------------
In response, FRA notes that Sec. 222.21 currently allows
locomotive engineers to sound the locomotive horn for less than 15
seconds in two very different scenarios. Locomotive engineers are
permitted to sound the locomotive horn for less than 15 seconds when
initiating movement after having been stopped in close proximity to a
public highway-rail grade crossing.\7\ Locomotive engineers are also
permitted to sound the locomotive horn for less than 15 seconds when
traveling at speeds in excess of 60 miles per hour (mph) on approach to
a public highway-rail grade crossing.\8\ Moreover, a commuter railroad
obtained regulatory relief similar to the proposal through an FRA
waiver permitting its train crews to vary the locomotive horn sounding
pattern required by Sec. 222.21(a) when initiating train movement
after having stopped at certain specified passenger stations located in
close proximity to public highway-rail grade crossings.\9\ This waiver
has been in effect since 2009 without negatively impacting public
safety or the safety of railroad operations.
---------------------------------------------------------------------------
\7\ 49 CFR 222.21(d).
\8\ 49 CFR 222.21(a)(3).
\9\ Docket No. FRA-2008-0045 available at <a href="https://www.regulations.gov/docket/FRA-2008-0045">https://www.regulations.gov/docket/FRA-2008-0045</a>.
---------------------------------------------------------------------------
FRA disagrees with SMART-TD's assertion that the horn sounding
pattern required by Sec. 222.21(a) carries no meaningful cost to
railroads. Without the regulatory flexibility proposed, each entity
seeking to vary the required locomotive horn sounding pattern by train
crews would be required to prepare and submit a waiver petition for
regulatory relief.
SMART-TD also noted concern that the proposed language may create
liability for locomotive engineers, who might be scapegoated in the
event of a grade crossing collision. In response, FRA is amending Sec.
222.21(d) to clarify that FRA is authorizing locomotive engineers to
exercise their discretion when determining whether to vary the
locomotive horn sounding pattern if the engineer can determine that the
nearby public highway-rail grade crossing is not obstructed and, in the
locomotive engineer's sole judgment, at least one of the conditions set
forth in Sec. 222.21(d)(1) and (2) has been met.
II. Section-by-Section Analysis
Please refer to the discussion in the NPRM, as FRA is generally
adopting the rule text as proposed in the NPRM. 90 FR 28641 (July 1,
2025). However, as noted above, in this final rule, FRA is adding the
phrase, ``in the locomotive engineer's sole judgment'' to Sec.
222.21(d) to clarify that FRA is authorizing locomotive engineers to
exercise their discretion when determining whether to vary the
locomotive horn sounding pattern when entering a nearby public highway-
rail grade crossing, after having stopped in close proximity to the
crossing.
FRA is also replacing the reference to ``conflicting highway
movements'' in Sec. 222.21(d)(2) with ``conflicting motorist or
pedestrian traffic'' to clarify that FRA expects locomotive engineers
to look for motorists and pedestrians who may be approaching the nearby
public highway-rail grade crossing. Thus, prior to exercising the
discretion authorized by Sec. 222.21(d), locomotive engineers must
determine that either the crossing gates at the nearby unobstructed
public highway-rail grade crossing are fully lowered (in compliance
with the condition set forth in Sec. 222.21(d)(1)) or there is no
conflicting motorist or pedestrian traffic approaching the nearby
unobstructed public highway-rail grade crossing (in compliance with the
condition set forth in Sec. 222.21(d)(2)).
III. Regulatory Impact and Notices
A. Executive Order 12866 (Regulatory Planning and Review) and DOT
Regulatory Policies and Procedures
FRA has considered the impact of this final rule under E.O. 12866
(58 FR 51735, Oct. 4, 1993), Regulatory Planning and Review, and DOT
Regulatory Policies and Procedures.\10\ The Office of Information and
Regulatory Affairs within the Office of Management and Budget (OMB)
determined that this final rule is not a significant regulatory action
under section 3(f) of E.O. 12866.
---------------------------------------------------------------------------
\10\ 49 CFR part 5; see also DOT Order 2100.6B, Policies and
Procedures for Rulemakings, available at <a href="https://www.transportation.gov/regulations/dot-order-21006b-policies-and-procedures-rulemakings">https://www.transportation.gov/regulations/dot-order-21006b-policies-and-procedures-rulemakings</a>; DOT Order 2100.7, Ensuring Reliance Upon
Sound Economic Analysis in Department of Transportation Policies,
Programs, and Activities, available at <a href="https://www.transportation.gov/mission/ensuring-reliance-upon-sound-economic-analysis-department-transportation-policies-programs">https://www.transportation.gov/mission/ensuring-reliance-upon-sound-economic-analysis-department-transportation-policies-programs</a>.
---------------------------------------------------------------------------
FRA analyzed the potential costs and benefits of this final rule
and concluded that it reduces the burden on railroads and communities
by providing greater flexibility in rules concerning train horns near
public highway-rail grade crossings. In addition, this final rule
eliminates the need for railroads seeking to vary the mandatory
locomotive horn sounding pattern to prepare and submit a waiver
petition for regulatory relief to FRA.
B. Executive Order 14192 (Unleashing Prosperity Through Deregulation)
E.O. 14192, Unleashing Prosperity Through Deregulation, requires
that for ``each new [E.O. 14192 regulatory
[[Page 55766]]
action] issued, at least ten prior regulations be identified for
elimination.'' \11\ Implementation guidance for E.O. 14192 issued by
OMB (Memorandum M-25-20, March 26, 2025) defines two different types of
E.O. 14192 actions: an E.O. 14192 deregulatory action, and an E.O.
14192 regulatory action.\12\
---------------------------------------------------------------------------
\11\ Executive Office of the President, Executive Order 14192 of
January 31, 2025, Unleashing Prosperity Through Deregulation, 90 FR
9065-9067 (Feb. 6, 2025).
\12\ Executive Office of the President. Office of Management and
Budget, Guidance Implementing Section 3 of Executive Order 14192,
Titled ``Unleashing Prosperity Through Deregulation,'' Memorandum M-
25-20 (Mar. 26, 2025).
---------------------------------------------------------------------------
An E.O. 14192 deregulatory action is defined as ``an action that
has been finalized and has total costs less than zero.'' This final
rule is expected to have total costs less than zero, and therefore it
is considered an E.O. 14192 deregulatory action. This final rule will
provide additional flexibility for the use of train horns near public
highway-rail grade crossings, and waivers will no longer be necessary
for those railroads that otherwise would petition FRA for relief from
such rules.
C. Regulatory Flexibility Act
The Regulatory Flexibility Act (5 U.S.C. 601, et seq.), as amended
by the Small Business Regulatory Enforcement Fairness Act of 1996,\3\
requires Federal agencies to consider the effects of the regulatory
action on small business and other small entities and to minimize any
significant economic impact. Accordingly, DOT policy requires an
analysis of the impact of all regulations on small entities, and
mandates that agencies strive to lessen any adverse effects on these
businesses. The term ``small entities'' comprises small businesses and
not-for-profit organizations that are independently owned and operated
and are not dominant in their fields, and governmental jurisdictions
with populations of less than 50,000 (5 U.S.C. 601(6)).
No regulatory flexibility analysis is required, however, if the
head of an Agency or an appropriate designee certifies that the rule
will not have a significant economic impact on a substantial number of
small entities. This final rule will allow for regulatory relief in
certain situations from the pattern of horn soundings in FRA train horn
regulation. By extending this regulatory relief, many regulated
entities, including small entities, will experience benefits. Some
small entities will experience cost savings from no longer having to
submit waivers. Although some small entities may be impacted by this
final rule, FRA does not anticipate that those impacts will be
significant.
Consequently, FRA certifies that this final rule will not have a
significant economic impact on a substantial number of small entities.
D. Paperwork Reduction Act
This final rule offers regulatory flexibilities, and it contains no
new information collection requirements under the Paperwork Reduction
Act of 1995, 44 U.S.C. 3501, et seq., therefore, an information
collection submission to OMB is not required. The recordkeeping and
reporting requirements already contained in part 222 became effective
when it was approved by OMB on January 19, 2026. The OMB Control Number
is 2130-0560, and OMB approval expires on January 31, 2029.
E. Environmental Assessment
FRA has analyzed this rule for the purposes of the National
Environmental Policy Act of 1969 (NEPA). In accordance with 42 U.S.C.
4336 and DOT NEPA Order 5610.1D, FRA has determined that this rule is
categorically excluded pursuant to 23 CFR 771.116(c)(15). This
rulemaking is not anticipated to result in any environmental impacts,
and there are no unusual or extraordinary circumstances present in
connection with this rulemaking.
F. Federalism Implications
This final rule will not have a substantial effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government. Thus, in accordance with E.O. 13132, Federalism
(64 FR 43255, Aug. 10, 1999), preparation of a Federalism Assessment is
not warranted.
G. Unfunded Mandates Reform Act of 1995
This final rule will not result in the expenditure, in the
aggregate, of $100,000,000 or more, adjusted for inflation, in any one
year by State, local, or Indian Tribal Governments, or the private
sector. Thus, consistent with section 202 of the Unfunded Mandates
Reform Act of 1995 (Pub. L. 104-4, 2 U.S.C. 1532), FRA is not required
to prepare a written statement detailing the effect of such an
expenditure.
H. Energy Impact
E.O. 13211, Actions Concerning Regulations That Significantly
Affect Energy Supply, Distribution, or Use (66 FR 28355, May 22, 2001),
requires Federal agencies to prepare a Statement of Energy Effects for
any ``significant energy action.'' \13\ FRA has evaluated this final
rule in accordance with E.O. 13211 and determined that this final rule
is not a ``significant energy action'' within the meaning of E.O.
13211.
---------------------------------------------------------------------------
\13\ 66 FR 28355 (May 22, 2001).
---------------------------------------------------------------------------
I. Executive Order 13175 (Tribal Consultation)
FRA has evaluated this final rule in accordance with the principles
and criteria contained in E.O. 13175, Consultation and Coordination
with Indian Tribal Governments (65 FR 67249, Nov. 6, 2000). The final
rule will not have a substantial direct effect on one or more Indian
tribes, will not impose substantial direct compliance costs on Indian
Tribal Governments, and will not preempt tribal laws. Therefore, the
funding and consultation requirements of E.O. 13175 do not apply, and a
tribal summary impact statement is not required.
J. International Trade Impact Assessment
The Trade Agreement Act of 1979 prohibits Federal agencies from
engaging in any standards or related activities that create unnecessary
obstacles to the foreign commerce of the United States. Legitimate
domestic objectives, such as safety, are not considered unnecessary
obstacles. The statute also requires consideration of international
standards and, where appropriate, that they be the basis for U.S.
standards. This final rule is purely domestic in nature and is not
expected to affect trade opportunities for U.S. firms doing business
overseas or for foreign firms doing business in the United States.
List of Subjects in 49 CFR Part 222
Administrative practice and procedure, Locomotives, Railroad
safety, Train horn.
The Final Rule
For the reasons discussed in the preamble, FRA amends part 222 of
chapter II, subtitle B of title 49, Code of Federal Regulations as
follows:
PART 222--USE OF LOCOMOTIVE HORNS AT PUBLIC HIGHWAY-RAIL GRADE
CROSSINGS
0
1. The authority citation for part 222 continues to read as follows:
Authority: 49 U.S.C. 20103, 20107, 20153, 21301, 21304; 28
U.S.C. 2461 note; and 49 CFR 1.89.
[[Page 55767]]
0
2. Amend Sec. 222.21 by revising paragraph (d) to read as follows:
Sec. 222.21 When must a locomotive horn be used?
* * * * *
(d) A locomotive engineer operating a train, locomotive consist, or
individual locomotive that has stopped in close proximity to a public
highway-rail grade crossing may approach the crossing and sound the
horn for less than 15 seconds, and may vary the sounding pattern set
forth in paragraph (a) of this section, before the train, locomotive
consist, or locomotive enters the highway-rail grade crossing, if the
locomotive engineer is able to determine that the public highway-rail
grade crossing is not obstructed and, in the locomotive engineer's sole
judgment, either:
(1) The public highway-rail grade crossing is equipped with
flashing lights and gates and the gates are fully lowered; or
(2) There is no conflicting motorist or pedestrian traffic
approaching the public highway-rail grade crossing.
* * * * *
Issued in Washington, DC, under authority delegated in 49 CFR
1.89.
David A. Fink,
Administrator.
[FR Doc. 2026-17783 Filed 8-28-26; 8:45 am]
BILLING CODE 4910-06-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.