Commission Information Collection Activities (FERC-FERC-510); Comment Request; Extension
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-510 Application for Surrender of Hydropower License (OMB No 1902-0068). There are no proposed changes to the reporting requirements.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 167 (Monday, August 31, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 167 (Monday, August 31, 2026)]
[Notices]
[Pages 55847-55848]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-17740]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC26-42-000]
Commission Information Collection Activities (FERC-FERC-510);
Comment Request; Extension
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice of information collection and request for comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory
Commission (Commission or FERC) is soliciting public comment on the
currently approved information collection, FERC-510 Application for
Surrender of Hydropower License (OMB No 1902-0068). There are no
proposed changes to the reporting requirements.
DATES: Comments on the collections of information are due October 30,
2026.
ADDRESSES: Please submit comments via email to <a href="/cdn-cgi/l/email-protection#d692b7a2b795bab3b7a4b7b8b5b39690938495f8b1b9a0"><span class="__cf_email__" data-cfemail="b9fdd8cdd8fad5dcd8cbd8d7dadcf9fffcebfa97ded6cf">[email protected]</span></a>.
You must specify Docket No. (IC26-42-000) and the FERC Information
Collection number (FERC-510) in your email. If you are unable to file
electronically, comments may be filed by USPS mail or by hand
(including courier) delivery:
<bullet> Mail via U.S. Postal Service only, addressed to: Federal
Energy Regulatory Commission, Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
<bullet> Hand (including courier) delivery to: Federal Energy
Regulatory Commission, Secretary of the Commission, 12225 Wilkins
Avenue, Rockville, MD 20852.
Docket: To view comments and issuances in this docket, please visit
<a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>.
FOR FURTHER INFORMATION CONTACT: Kayla Williams may be reached by email
at <a href="/cdn-cgi/l/email-protection#783c190c193b141d190a19161b1d383e3d2a3b561f170e"><span class="__cf_email__" data-cfemail="aaeecbdecbe9c6cfcbd8cbc4c9cfeaeceff8e984cdc5dc">[email protected]</span></a>, or by telephone at (202) 502-6468.
SUPPLEMENTARY INFORMATION:
Title: FERC-510, Application for Surrender of a Hydropower License.
OMB Control No.: 1902-0068.
Type of Request: Three-year extension of the FERC-510 information
collection requirements with no changes to the current reporting
requirements.
Abstract: FERC-510 includes the information collection burden
pursuant to sections 4(e), 6, and 13 of the Federal Power Act (FPA) (16
U.S.C. 797(e), 799 and 806). Section 4(e) gives the Commission
authority to issue licenses for the purposes of constructing, operating
and maintaining dams, water conduits, reservoirs, powerhouses,
transmission lines or other power project works necessary or convenient
for developing and improving navigation, transmission and utilization
of power using bodies of water over which Congress has jurisdiction.
Section 6 gives the Commission the authority to prescribe the
conditions of licenses including the revocation or surrender of the
license. Section 13 defines the Commission's authority to delegate time
periods for when a license must be terminated if project construction
has not begun. Surrender of a license may be desired by a licensee when
a licensed project is retired or not constructed, natural catastrophes
have damaged or destroyed the project facilities, or a licensee
otherwise no longer wishes to hold a license.
FERC-510 is the application for the surrender of a hydropower
license.\1\ The information is used by Commission staff to determine
the broad impact of such surrender. The Commission will issue a notice
soliciting comments from the public and other agencies and conduct a
review of the application before issuing an order for Surrender of a
License. The order is the result of an analysis of the information
produced (i.e., dam safety, public safety, and environmental concerns,
etc.), which is examined to determine whether any conditions must be
satisfied before granting the surrender. The order implements the
existing regulations and applies to surrender of any type of hydropower
authorization issued by FERC and its predecessor, the Federal Power
Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 6.1-6.4
---------------------------------------------------------------------------
Type of Respondents: Non-Federal (Private or Municipal) Hydropower
Licensees.
Estimate of Annual Burden: \2\ The Commission estimates the total
annual burden and cost \3\ for this information collection as follows:
---------------------------------------------------------------------------
\2\ The Commission defines burden as the total time, effort, or
financial resources expended by persons to generate, maintain,
retain, or disclose or provide information to or for a Federal
agency. For further explanation of what is included in the
information collection burden, reference 5 Code of Federal
Regulations 1320.3.
\3\ FERC estimates that industry hourly costs are similar to the
Commission FY 2026 average salary plus benefits of $213,003 per year
(or $102/hour).
[[Page 55848]]
--------------------------------------------------------------------------------------------------------------------------------------------------------
Annual number
Number of respondents of responses Total number of Average burden hrs. & cost ($) Total annual burden hrs. & Cost per
per respondent responses per response total annual cost ($) respondent ($)
(1) (2) (1) * (2) = (3) (4)............................ (3) * (4) = (5)................ (5) / (1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
10................................. 1 10 80 hrs.; $8,160................ 800 hrs.; $81,600.............. $8,160
--------------------------------------------------------------------------------------------------------------------------------------------------------
Comments: Comments are invited on: (1) whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
Dated: August 26, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-17740 Filed 8-28-26; 8:45 am]