Rescission Notice; St. Johns Watershed Project in Mississippi, New Madrid, and Scott Counties, Missouri
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The NRCS Missouri State Office, in coordination with the St. Johns Levee and Drainage District of Southeast Missouri, is rescinding the Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for the St. Johns Watershed Project in Mississippi, New Madrid, and Scott Counties, Missouri, which was published in the Federal Register on August 13, 2025. NRCS has determined that the NOI was issued prior to confirming the need for an EIS.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 166 (Friday, August 28, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 166 (Friday, August 28, 2026)]
[Notices]
[Page 55512]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-17595]
[[Page 55512]]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Natural Resources Conservation Service
Rescission Notice; St. Johns Watershed Project in Mississippi,
New Madrid, and Scott Counties, Missouri
AGENCY: Natural Resources Conservation Service (NRCS), United States
Department of Agriculture (USDA).
ACTION: Notice; rescission.
-----------------------------------------------------------------------
SUMMARY: The NRCS Missouri State Office, in coordination with the St.
Johns Levee and Drainage District of Southeast Missouri, is rescinding
the Notice of Intent (NOI) to prepare an Environmental Impact Statement
(EIS) for the St. Johns Watershed Project in Mississippi, New Madrid,
and Scott Counties, Missouri, which was published in the Federal
Register on August 13, 2025. NRCS has determined that the NOI was
issued prior to confirming the need for an EIS.
DATES: Effective upon publication, this notice rescinds the NOI to
prepare an EIS (90 FR 38944), which was published in the Federal
Register on August 13, 2025.
FOR FURTHER INFORMATION CONTACT: Andrew Rackers, Missouri State
Conservation Engineer; telephone: (573) 876-9376; email:
<a href="/cdn-cgi/l/email-protection#a9c8c7cddbccde87dbc8cac2ccdbdae9dcdacdc887cec6df"><span class="__cf_email__" data-cfemail="ea8b848e988f9dc4988b89818f9899aa9f998e8bc48d859c">[email protected]</span></a>. Individuals who require alternative means for
communication should contact the USDA Target Center at (202) 720-2600
(voice and text telephone (TTY)) or dial 711 for Telecommunications
Relay Service (both voice and text telephone users can initiate this
call from any telephone).
SUPPLEMENTARY INFORMATION: The NRCS Missouri State Office, in
coordination with the St. Johns Levee and Drainage District of
Southeast Missouri and consistent with the requirements of 7 CFR 1b.7,
is issuing this notice to advise Federal, State, and local government
agencies and the public that NRCS will continue the planning process to
determine whether an EIS is needed for the St. Johns Watershed Project.
This notice rescinds the NOI to prepare an EIS (90 FR 38944), published
on August 13, 2025. The project area includes the St. Johns Bayou and
St. James Ditches and adjacent lands on the west landward side of the
setback levee to the watershed outlet at the Mississippi River
floodgates near New Madrid, Missouri. Closure of the floodgates
prevents Mississippi River flood damage; however, when closed, the
floodgates block the watershed outlet and cause flooding from impounded
interior runoff.
During the watershed planning process, NRCS determined that the NOI
(90 FR 38944) was issued prematurely, before identifying all reasonable
alternatives and assessing whether an EIS was needed. If the planning
process indicates that an EIS is appropriate, NRCS will publish a new
NOI. The watershed planning process is continuing and will comply with
the National Environmental Policy Act (NEPA). Any public comment
received from the original NOI and scoping period will be considered
during Watershed Plan development. Watershed planning is authorized by
the Watershed Protection and Flood Prevention Act of 1954 (Pub. L. 83-
566), as amended, and the Flood Control Act of 1944 (Pub. L. 78-534).
Nathan Goodrich,
Missouri State Conservationist, Natural Resources Conservation Service.
[FR Doc. 2026-17595 Filed 8-27-26; 8:45 am]