Air Plan Approval; Arkansas; Regional Haze State Implementation Plan for the Second Implementation Period
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
Pursuant to the Clean Air Act (CAA or the Act), the U.S. Environmental Protection Agency (EPA) is finalizing approval of a State Implementation Plan (SIP) revision submitted by the State of Arkansas through the Division of Environmental Quality (DEQ) on August 8, 2022, clarified by DEQ on July 29, 2025, and further supplemented on May 4, 2026, to satisfy the requirements of the Act and the EPA's Regional Haze Rule (RHR) for visibility protection in mandatory Class I Federal areas (Class I areas) for the program's second implementation period. Arkansas' SIP submission addresses the requirement that States must revise their long-term strategies for making reasonable progress to prevent any future and remedy any existing man-made visibility impairment in the Class I areas. The EPA is taking this action pursuant to CAA sections 110 and 169A.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 165 (Thursday, August 27, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 165 (Thursday, August 27, 2026)]
[Rules and Regulations]
[Pages 55268-55272]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-17494]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R06-OAR-2022-0735; FRL-9405-02-R6]
Air Plan Approval; Arkansas; Regional Haze State Implementation
Plan for the Second Implementation Period
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: Pursuant to the Clean Air Act (CAA or the Act), the U.S.
Environmental Protection Agency (EPA) is finalizing approval of a State
Implementation Plan (SIP) revision
[[Page 55269]]
submitted by the State of Arkansas through the Division of
Environmental Quality (DEQ) on August 8, 2022, clarified by DEQ on July
29, 2025, and further supplemented on May 4, 2026, to satisfy the
requirements of the Act and the EPA's Regional Haze Rule (RHR) for
visibility protection in mandatory Class I Federal areas (Class I
areas) for the program's second implementation period. Arkansas' SIP
submission addresses the requirement that States must revise their
long-term strategies for making reasonable progress to prevent any
future and remedy any existing man-made visibility impairment in the
Class I areas. The EPA is taking this action pursuant to CAA sections
110 and 169A.
DATES: This rule is effective on September 28, 2026.
ADDRESSES: The EPA has established a docket for this action under
Docket ID No. EPA-R06-OAR-2022-0735. All documents in the docket are
listed on the <a href="https://www.regulations.gov">https://www.regulations.gov</a> website. Although listed in
the index, some information is not publicly available, e.g.,
Confidential Business Information or other information whose disclosure
is restricted by statute. Certain other material, such as copyrighted
material, is not placed on the internet. Publicly available docket
materials are available electronically through <a href="https://www.regulations.gov">https://www.regulations.gov</a>.
FOR FURTHER INFORMATION CONTACT: James E. Grady, EPA Region 6 Office,
Regional Haze and SO<INF>2</INF> Section; telephone number: (214) 665-
6745; email address: <a href="/cdn-cgi/l/email-protection#97f0e5f6f3eeb9fdf6faf2e4d7f2e7f6b9f0f8e1"><span class="__cf_email__" data-cfemail="84e3f6e5e0fdaaeee5e9e1f7c4e1f4e5aae3ebf2">[email protected]</span></a>. Please call or email Mr.
Grady above or call Mr. Bill Deese via telephone at (214) 665-7253 if
you need alternative access to material indexed but not provided in the
docket.
SUPPLEMENTARY INFORMATION: Throughout this document ``we,'' ``us,'' and
``our'' mean ``the EPA.''
Table of Contents
I. Background
II. Rationale for This Final Action
III. Public Comments and EPA Responses
IV. Final Action
V. Incorporation by Reference
VI. Statutory and Executive Order Reviews
I. Background
The background for this action is discussed in detail in our
September 5, 2025, proposed action (90 FR 43030). In that document, we
proposed approval of the 2022 Arkansas Regional Haze Planning Period II
SIP revision (2022 Planning Period II SIP), submitted August 8, 2022,
and clarified on July 29, 2025, as meeting the applicable regional haze
program requirements for the second implementation period contained in
40 CFR 51.308(f), (g)(1) through (5), and (i).
On May 4, 2026, DEQ submitted a supplemental package to the EPA to
finalize the 2022 Planning Period II SIP and address any concerns with
Arkansas' SIP revision and its July 29, 2025, clarification letter
regarding opportunity for public comment and FLM consultation. The
supplemental package contained the July 2025 letter, as well as
required documentation of FLM consultation and public notice with
opportunity to comment. The State did not receive any public comments
nor comments from FLMs or State agencies through this process.
We find that the 2022 Planning Period II SIP revision meets the
statutory and specific regulatory requirements of the regional haze
second planning period as discussed in the preamble of this final
action (see sections II and III), the accompanying response-to-comments
document (RTC Document), and in our September 2025 proposed action.\1\
---------------------------------------------------------------------------
\1\ See 90 FR 43030 (Sept. 5, 2025).
---------------------------------------------------------------------------
II. Rationale for This Final Action
In this final action, we are approving the 2022 Planning Period II
SIP and affirming that it is now the Agency's policy that, where
visibility conditions for a Class I Federal area impacted by a State
are below the uniform rate of progress (URP) and that State has
considered the four statutory factors, then that State will have
presumptively demonstrated reasonable progress for the second planning
period for that area. We acknowledge that this final action reflects a
change in policy as to how the URP should be used in the evaluation of
regional haze second planning period SIPs but believe that this policy
better aligns with the purpose of the statute and the RHR for achieving
``reasonable'' progress toward natural visibility. As described in the
September 2025 proposed action,\2\ we have discretion and authority to
change our policy.\3\
---------------------------------------------------------------------------
\2\ Id.
\3\ In FCC v. Fox Television Stations, Inc., the U.S. Supreme
Court plainly stated that an agency is free to change a prior policy
and ``need not demonstrate . . . that the reasons for the new policy
are better than the reasons for the old one; it suffices that the
new policy is permissible under the statute, that there are good
reasons for it, and that the agency believes it to be better.'' 566
U.S. 502, 515 (2009) (referencing Motor Vehicle Mfrs. Ass'n of
United States, Inc. v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29
(1983)). See also Perez v. Mortgage Bankers Assn., 135 S. Ct. 1199
(2015).
---------------------------------------------------------------------------
In developing the regulations required by CAA section 169A(b), we
established the concept of the URP for each Class I area. The URP is
determined by drawing a straight line from the measured 2000 through
2004 baseline conditions (in deciviews) for the 20 percent most
impaired days at each Class I area to the estimated natural conditions
(in deciviews) for the 20 percent most impaired days in 2064. From this
calculation, a URP value can be calculated for each year between 2004
and 2064. We developed the URP to address the diverse concerns of
Eastern and Western States and account for the varying levels of
visibility impairment in Class I areas around the Country while
ensuring an equitable approach nationwide. For each Class I area,
States must calculate the URP for the end of each planning period
(e.g., in 2028 for the second planning period).\4\ See 40 CFR
51.308(f)(1)(vi)(A). States may also adjust the URP to account for
impacts from anthropogenic sources outside the United States and/or
impacts from certain wildland prescribed fires. See 40 CFR
51.308(f)(1)(vi)(B). Then, for each Class I area, States must compare
the RPG for the 20 percent most impaired days to the URP for the end of
the planning period. If the RPG is above the URP, then an additional
``robust demonstration'' requirement is triggered for each State that
contributes to that Class I area. See 40 CFR 51.308(f)(3)(ii)(B).
---------------------------------------------------------------------------
\4\ We note that reasonable progress goals (RPGs) are a
regulatory construct that we developed to address the statutory
mandate in CAA section 169B(e)(1), which required our regulations to
include ``criteria for measuring `reasonable progress' toward the
national goal.'' Under 40 CFR 51.308(f)(3)(ii), RPGs measure the
progress that is projected to be achieved by the control measures a
State has determined are necessary to make reasonable progress.
Consistent with the 1999 RHR, the RPGs are not enforceable, though
they create a benchmark that allows for analytical comparisons to
the URP and mid-implementation-period course corrections if
necessary. 82 FR 3078 at 3091 through 3092 (Jan. 10, 2017).
---------------------------------------------------------------------------
In the 2017 RHR revisions,\5\ we addressed the role of the URP as
it relates to the development of a State's second planning period SIP.
Specifically, in response to comments suggesting that the URP should be
considered a ``safe harbor'' that relieves States of any obligation to
consider the four statutory factors, we explained that the URP was not
intended to be such a safe harbor.\6\ ``Some commenters stated a desire
for corresponding rule text dealing with situations where RPGs are
equal to (``on'') or better than (``below'') the URP or glidepath.
Several commenters stated that the URP or glidepath should be a ``safe
harbor,'' opining that States should be permitted to analyze whether
projected visibility
[[Page 55270]]
conditions for the end of the implementation period will be on or below
the glidepath based on on-the-books or on-the-way control measures, and
that in such cases a four-factor analysis should not be required.'' \7\
Other comments indicated a similar approach, such as ``a somewhat
narrower entrance to a `safe harbor,' '' by suggesting that if current
visibility conditions are already below the end-of-planning-period
point on the URP line, a four-factor analysis should not be
required.\8\ We stated in our response that we did not agree with
either of these recommendations. ``The CAA requires that each SIP
revision contains long-term strategies for making reasonable progress,
and that in determining reasonable progress States must consider the
four statutory factors. Treating the URP as a safe harbor would be
inconsistent with the statutory requirement that States assess the
potential to make further reasonable progress toward natural visibility
goal in every implementation period.'' \9\
---------------------------------------------------------------------------
\5\ See 82 FR 3078 (Jan. 10, 2017).
\6\ See 82 FR 3078 at 3099 (Jan. 10, 2017).
\7\ Id.
\8\ Id.
\9\ Id.
---------------------------------------------------------------------------
Importantly, our recently adopted policy does not make the URP a
safe harbor. The policy merely creates a presumption that a State's
second planning period SIP is making reasonable progress for a Class I
area if a State has taken into consideration the four statutory factors
of CAA section 169A(g)(1) and that area is below the URP. This is
consistent with the CAA and RHR.
The Class I areas impacted by emissions from Arkansas are all below
their 2028 URP values, and Arkansas' SIP submittal demonstrated that
the State took into consideration the four reasonable progress factors
\10\ listed in CAA section 169A(g)(1) with respect to an adequate
number of emissions sources selected for analysis. Thus, we have
determined that 2022 Planning Period II SIP revision is fully
approvable under the Agency's new policy. Indeed, we think this policy
better aligns with the statutory goal because it recognizes the
considerable improvements in visibility impairment made by a wide
variety of State and Federal programs in recent decades.
---------------------------------------------------------------------------
\10\ The four statutory factors required to be taken into
consideration in determining reasonable progress are: the costs of
compliance, the time necessary for compliance, the energy and non-
air quality environmental impacts of compliance, and the remaining
useful life of any existing source subject to such requirements.
---------------------------------------------------------------------------
III. Public Comments and EPA Responses
The public comment period for our proposed approval \11\ of the
2022 Planning Period II SIP revision expired on October 6, 2025. We
received four total sets of comments. We received two adverse comment
letters submitted on October 6, 2025--one collectively from
Conservation Organizations (Sierra Club, National Parks Conservation
Association (NPCA), and the Coalition to Protect America's National
Parks), and another from the Mid-Atlantic/Northeast Visibility Union
(MANEVU). Both adverse commenters asserted that the new URP policy
violates the plain language of the CAA and RHR; that it violates the
procedural requirements of the CAA when announcing and applying it in
State-specific regional actions; that it is inconsistent with different
aspects of the RHR; and that the 2022 Planning Period II SIP does not
meet the new URP policy for presumptive approval. The Conservation
Groups also specifically asserted that removal of the Independence
retirement order was arbitrary, capricious, and contrary to law; that
DEQ's cost effectiveness thresholds were based on incomplete data; that
Flint Creek's reasonable progress determination was arbitrary,
capricious, and contrary to law; and that the EPA should have analyzed
impacts of Arkansas pollution on local communities.
---------------------------------------------------------------------------
\11\ See 90 FR 43030 (Sept. 5, 2025).
---------------------------------------------------------------------------
We also acknowledge two other comment letters received on October
6, 2025, from Entergy Services LLS on behalf of Entergy Arkansas, LLC;
and Hunton Andrews Kurth LLP on behalf of Ameren Missouri, American
Electric Power, Inc. and its operating companies, and Nebraska Public
Power District (collectively referred to as ``the utilities'') that
were largely in support of our proposed action. Specifically, Entergy
supported the determinations that Arkansas made in its second
implementation period regional haze SIP and that EPA proposed to
approve. The utilities specifically supported EPA's new URP policy
stating that the policy implements EPA's original understanding of the
regional haze program and its fundamental purpose; that it implements
the Congressional design of cooperative federalism; and that it
implements the plain text of the CAA and the RHR.
We evaluated the 2022 Planning Period II SIP submission against the
statutory and regulatory regional haze requirements and determined that
it satisfies those requirements. As detailed at length in the RTC
document associated with this rulemaking, we explained that our new
policy is consistent with the CAA and RHR, and the 2022 Planning Period
II SIP met the applicable statutory and regulatory requirements in
accordance with the new policy. In addition, we detailed that the 2022
Planning Period II SIP without the Independence Administrative Order
(LIS No. 22-085) demonstrates reasonable progress under the RHR and the
CAA and addresses all required elements of 40 CFR 51.308(f). We
explained that the May 4, 2026, supplement addressed any concerns with
the 2022 Planning Period II SIP regarding opportunity for public
comment and FLM consultation. We further explained in the RTC document
that the State reasonably considered the cost effectiveness for the
different equipment types and analyzed the four factors based on
complete cost data that was appropriate for the second planning period.
We also detailed that DEQ adequately considered the four statutory
factors in its assessment of potential additional controls for the
Flint Creek Power Plant and demonstrated reasonable progress toward the
national visibility goal for the second planning period. We clarified
that the State reasonably documented all cost calculations and provided
appropriate assumptions and parameters in its analyses for Flint Creek.
Lastly, regarding analyzing impacts to local communities, we explained
that neither the CAA nor the RHR requires States or the EPA to consider
the impact of pollution on communities near potentially affected
facilities when developing or reviewing a regional haze SIP.
We provide the complete comments with our detailed responses to the
full range of significant issues raised in the associated RTC document
included in the docket of this action. After careful consideration of
the public comments received, we are finalizing our action as proposed.
IV. Final Action
We are finalizing approval of the Arkansas 2022 Regional Haze
Planning Period II SIP revision submitted August 8, 2022, clarified on
July 29, 2025, and further supplemented on May 4, 2026, as meeting the
applicable regional haze program requirements for the second
implementation period contained in 40 CFR 51.308(f), (g)(1) through
(5), and (i).
We are finalizing approval of the State's determination for
FutureFuel Chemical Company to require a fuel switch from coal with 3
percent sulfur
[[Page 55271]]
content by weight to a low sulfur coal that has 1.5 percent sulfur
content (equating to 2.93 lb/MMBtu SO<INF>2</INF>) for its three coal-
fired boilers (SN:6M01-01). This requirement has been made enforceable
by the State through an Administrative Order (LIS No. 22-085) dated
August 3, 2022, and is included as part of the 2022 Planning Period II
SIP submittal. We are finalizing approval of all requirements set forth
in this Administrative Order for FutureFuel Chemical Company included
as part of the 2022 Planning Period II SIP submittal as a source
specific revision to be incorporated into the Arkansas SIP.
V. Incorporation by Reference
In this rule, we are finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, we are finalizing the incorporation by reference of the revisions
to the Arkansas source specific requirements described in section IV of
the preamble of this final action. We have made, and will continue to
make, these materials generally available through <a href="https://www.regulations.gov">https://www.regulations.gov</a> (please contact the person identified in the FOR
FURTHER INFORMATION CONTACT section of this preamble for more
information). Therefore, these materials are approved by the EPA for
inclusion in the SIP, and have been incorporated by reference by the
EPA into the plan, are fully federally enforceable under CAA sections
110 and 113 as of the effective date of our approval of this final
rulemaking, and will be incorporated by reference into the next update
to the SIP compilation.
VI. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the CAA and applicable
Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, the EPA's role is to approve State choices,
provided that they meet the criteria of the CAA. Accordingly, this
action merely proposes to approve State law as meeting Federal
requirements and does not impose additional requirements beyond those
imposed by State law. For that reason, this action:
<bullet> Is not a ``significant regulatory action'' subject to
review by the Office of Management and Budget under Executive Orders
12866 (58 FR 51735, October 4, 1993);
<bullet> Is not subject to Executive Order 14192 (90 FR 9065,
February 6, 2025) because State Implementation Plan approvals under the
CAA are exempt from review under Executive Order 12866;
<bullet> Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
<bullet> Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
<bullet> Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
<bullet> Does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
<bullet> Is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
<bullet> Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
<bullet> Is not subject to requirements of section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the Clean Air Act.
In addition, the SIP is not approved to apply on any Indian
reservation land or in any other area where the EPA or an Indian Tribe
has demonstrated that a Tribe has jurisdiction. In those areas of
Indian country, the proposed rule does not have Tribal implications and
will not impose substantial direct costs on Tribal governments or
preempt Tribal law as specified by Executive Order 13175 (65 FR 67249,
November 9, 2000).
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by
reference, Intergovernmental relations, Nitrogen dioxide, Ozone,
Particulate matter, Reporting and recordkeeping requirements, Sulfur
oxides, Volatile organic compounds.
Dated: August 19, 2026.
Walter Mason,
Regional Administrator, Region 6.
For the reasons stated in the preamble, the EPA amends 40 CFR part
52 as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart E--Arkansas
0
2. In Sec. 52.170:
0
a. In paragraph (d), amend the table titled ``EPA-Approved Arkansas
Source-Specific Requirements'' by adding the entry ``FutureFuel
Chemical Company'' at the end of the table.
0
b. In paragraph (e), amend the third table titled ``EPA-Approved Non-
Regulatory Provisions and Quasi-Regulatory Measures in the Arkansas
SIP'' by adding the entry ``Arkansas Regional Haze Planning Period II
SIP Revision'' at the end of the table.
The additions read as follows:
Sec. 52.170 Identification of plan.
* * * * *
(d) * * *
* * * * *
EPA-Approved Arkansas Source-Specific Requirements
* * * * * * *
FutureFuel Chemical Company..... Administrative 8/3/2022 8/27/2026, 91 FR Three boiler
Order LIS No. 22- [INSERT FEDERAL system (SN:6M01-
085. REGISTER PAGE 01).
WHERE THE
DOCUMENT BEGINS].
----------------------------------------------------------------------------------------------------------------
(e) * * *
* * * * *
[[Page 55272]]
EPA-Approved Non-Regulatory Provisions and Quasi-Regulatory Measures in the Arkansas SIP
----------------------------------------------------------------------------------------------------------------
Applicable
geographic or State submittal/
Name of SIP provision nonattainment effective date EPA approval date Explanation
area
----------------------------------------------------------------------------------------------------------------
* * * * * * *
Arkansas Regional Haze Statewide........ 8/8/2022 8/27/2026, 91 FR Approval of regional
Planning Period II SIP [INSERT FEDERAL haze SIP revision
Revision. REGISTER PAGE addressing program
WHERE THE requirements for the
DOCUMENT BEGINS]. second implementation
period contained in
40 CFR 51.308(f),
(g)(1) through (5),
and (i).
----------------------------------------------------------------------------------------------------------------
0
3. In Sec. 52.173, add paragraph (k) to read as follows:
Sec. 52.173 Visibility protection.
* * * * *
(k) Arkansas Regional Haze Planning Period II SIP Revision. The
Arkansas Regional Haze Planning Period II SIP Revision submitted on
August 8, 2022, is approved as meeting all program requirements for the
second implementation period contained in 40 CFR 51.308(f), (g)(1)
through (5), and (i).
[FR Doc. 2026-17494 Filed 8-26-26; 8:45 am]
BILLING CODE 6560-50-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.