Notice2026-17252
National Environmental Policy Act Implementing Procedures: Forest and Woodland Density Management Categorical Exclusion
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
August 24, 2026
Effective
August 24, 2026
Issuing agencies
Interior Department
Abstract
This notice announces a revision to the Department of the Interior (Department)'s National Environmental Policy Act (NEPA) procedures by adding a new categorical exclusion (CE) for forest and woodland density management in the Department's Handbook of NEPA Implementing Procedures, Appendix 2: Bureau Categorical Exclusions.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 162 (Monday, August 24, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 162 (Monday, August 24, 2026)]
[Notices]
[Pages 54744-54748]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-17252]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Office of the Secretary
[A2407-014-004-065516, #O2509-014-004-125222; LLHQ21000]
National Environmental Policy Act Implementing Procedures: Forest
and Woodland Density Management Categorical Exclusion
AGENCY: Office of the Secretary, Interior.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice announces a revision to the Department of the
Interior (Department)'s National Environmental Policy Act (NEPA)
procedures by adding a new categorical exclusion (CE) for forest and
woodland density management in the Department's Handbook of NEPA
Implementing Procedures, Appendix 2: Bureau Categorical Exclusions.
DATES: The CE is effective August 24, 2026.
ADDRESSES: The web address for the Department's Handbook of NEPA
Implementing Procedures where the new CE is being added is: <a href="https://www.doi.gov/document-library/handbook/516-dm-1-handbook-national-environmental-policy-act-implementing">https://www.doi.gov/document-library/handbook/516-dm-1-handbook-national-environmental-policy-act-implementing</a>. The Substantiation Report for
the CE is available at the Bureau of Land Management (BLM)'s ePlanning
site: <a href="https://eplanning.blm.gov/Project-Home/?id=8780a416-522f-f111-8341-001dd8029ed0">https://eplanning.blm.gov/Project-Home/?id=8780a416-522f-f111-8341-001dd8029ed0</a>.
[[Page 54745]]
FOR FURTHER INFORMATION CONTACT: Stacie McIntosh, Deputy Assistant
Director, Directorate of Resources and Planning at (907) 378-3815, or
<a href="/cdn-cgi/l/email-protection#106320257d73797e6450727c7d3e777f66"><span class="__cf_email__" data-cfemail="9be8abaef6f8f2f5efdbf9f7f6b5fcf4ed">[email protected]</span></a>. Individuals in the United States who are deaf,
deafblind, hard of hearing, or have a speech disability may dial 711
(TTY, TDD, or TeleBraille) to access telecommunications relay services.
Individuals outside the United States should use the relay services
offered within their country to make international calls to the point-
of-contact in the United States.
SUPPLEMENTARY INFORMATION:
I. Background
The Department published the proposed CE for forest and woodland
density management on April 6, 2026, for a 30-day public comment
period. Refer to the Federal Register notice 91 FR 17299 for more
information regarding the background and rationale for the CE. This
notice notifies the public of the Department's establishment of the
forest and woodland density management CE and includes the Department's
responses to comments from the public on the proposed CE. The
Department has not made any edits to the CE text as proposed. The
Department is establishing the CE to support approval of actions
related to long-term sustainability of forests and woodlands due to
widespread disruptions to natural disturbance regimes--particularly
fire.
NEPA, 42 U.S.C. 4321 et seq., requires Federal agencies to consider
the environmental effects of their proposed actions in their decision-
making processes. To comply with NEPA, agencies determine the
appropriate level of review of any proposed major Federal action--an
environmental impact statement (EIS), environmental assessment (EA), or
a CE. See generally, 42 U.S.C. 4336 (b); 43 CFR part 46; 516
Departmental Manual 1, ``U.S. Department of the Interior Handbook of
National Environmental Policy Act Implementing Procedures,'' section
1.2 (2026) (516 DM 1). Where it is reasonably foreseeable that
significant environmental effects are likely, the agency must prepare
an EIS and document its decision. See generally, 42 U.S.C. 4336 (b)(1);
516 DM 1 section 1.2(a)(5)(ii). Where appropriate, an agency may
prepare an EA, and if that EA supports the agency reaching a finding of
no significant impact (FONSI) for the proposed action, the agency need
not prepare an EIS. See generally, 42 U.S.C. 4336(b)(2); 516 DM 1
section 1.6; section 1.2(a)(4).
Under NEPA, agencies may establish CEs--categories of actions that
the agency has determined normally do not significantly affect the
quality of the human environment--in their agency NEPA implementing
procedures (42U.S.C. 4336e(1)). An agency may also adopt for its own
use a CE listed in another agency's NEPA procedures consistent with
section 109 of NEPA (42 U.S.C. 4336c).
Under the Department's NEPA procedures, if a bureau determines that
a CE covers a proposed action, it then evaluates the proposed action
for the presence of extraordinary circumstances, which are factors or
circumstances that indicate a normally categorically excluded action
may have a significant effect (43 CFR 46.205, 46.215). If the bureau
cannot categorically exclude the proposed action following review for
extraordinary circumstances, the bureau will prepare an EA or EIS, as
appropriate, before issuing any decision to authorize the action (43
CFR 46.205(c), 42 U.S.C. 4336(b)).
II. Comments on the Proposed CE
The Department received 338 comment letters during the 30-day
public comment period on the proposed CE. State governments, interest
groups, non-profit organizations, and private citizens submitted
comments. The Department received comments both in support of and in
opposition to the proposed CE. Some comments addressed BLM's forest
management policy or management direction that is specific to Resource
Management Plans (RMPs); however, these comments are beyond the scope
of the establishment of this CE, which pertains only to compliance with
NEPA for forest management actions, not the character or advisability
of such actions, and the Department provides no response to such
comments. Some commenters provided additional scientific literature for
the Department's consideration; BLM evaluated the literature and
revised the Substantiation Report to include and discuss those
additional citations, as appropriate. The Department considered all
comments received during the comment period and responds in this notice
to the 13 substantive issues raised in the public comments that pertain
to NEPA compliance. The Department appreciates the interest and
participation of all respondents. The Department, where appropriate,
considered and addressed similar or related comments in one response,
and responds to the comments as follows:
Comment 1: The Department received comments that expressed support
for establishing the CE, stating that the BLM would be able to use the
CE to substantially reduce permitting time and promote the realization
of the associated economic benefits of this reduction while allowing
bureau staff to focus on other proposals that may have a significant
environmental effect. Commenters also indicated that the use of this CE
to timely permit forest and woodland density management actions would
promote forest resilience by reducing competition for water and
nutrients, lower wildfire severity, promote healthier, more diverse
forest conditions, reduce drought induced tree mortality, and create
healthy forests that support local economies.
Response 1: The Department will continue to conduct the appropriate
level of NEPA review for proposed actions, including, where
appropriate, use of this CE or other available CEs. Use of this CE,
where appropriate, may help the BLM conduct NEPA compliance more
efficiently and protect more forest acres from severe stand replacing
fires.
Comment 2: Some commenters suggested that the establishment of this
CE would result in diminished protection for Endangered Species Act
(ESA)-listed species, old-growth forests, water resources, and other
important, scarce, or sensitive resources and values.
Response 2: The establishment of this CE does not reduce
protections for important, scarce, or sensitive resources and values.
Instead, it provides a mechanism for bureaus within the Department to
comply with NEPA when authorizing covered actions. Before using the CE,
bureaus would need to review for the presence of any extraordinary
circumstances. Through that review, the bureaus must verify that any
proposed action would not have significant effects on ecologically
significant or critical areas, or similar natural resources; or on
species listed or proposed to be listed under the ESA, or on any
designated critical habitat. Moreover, additional protections for
important, scarce, or sensitive resources are available through
statutes other than NEPA, such as ESA and the Clean Water Act. Those
protections are not affected by the establishment of this CE. Finally,
proposed actions must conform to the applicable land use plan,
including any plan direction developed to protect species of concern,
critical habitat, aquatic resources and water quality.
[[Page 54746]]
Comment 3: Some commenters suggested that the establishment of this
CE would authorize BLM forest management actions, including industrial
logging.
Response 3: The establishment of and reliance on this CE does not
authorize any actions, including, but not limited to, on-the-ground
actions. Any BLM decisions about whether and how to engage in forest
management actions must conform to the applicable land use plan. BLM
land use plans, which undergo a separate NEPA review when created,
amended, or revised, provide management direction for all BLM-managed
forests and in general provide for the retention of old trees and
conservation of old forest characteristics, regardless of the level of
NEPA compliance conducted for any particular action. Instead, this CE
is a procedure for complying with NEPA when authorizing covered
actions. When proposing to take an action covered by the CE, DOI
bureaus would be able to use the CE after considering whether
extraordinary circumstances, if present, would preclude such use, and
after ensuring compliance with all applicable laws and regulations.
Comment 4: The Department received comments suggesting the
establishment of this CE establishes forest management policies that
will make forests less fire resilient, increase fire prone conditions
by reducing canopy cover and increasing understory growth, decrease
structurally complex forests and approve increased logging that
threatens clean water.
Response 4: This comment is outside the scope of this effort as the
establishment of and use of this CE is not forest management policy and
does not change forest management policy; rather, the CE is a procedure
for complying with NEPA that can be used, if appropriate, when taking a
covered action that carries out the forest management policy. In
addition, the Substantiation Report for this CE discusses in detail the
scientific literature and government reports dealing with these issues.
Comment 5: The Department received comments suggesting that the use
of this CE eliminates site-specific analysis of the effects of a
proposed action on forest and habitat attributes and potential for
impacts to those attributes.
Response 5: The establishment of and use of this CE does not
eliminate site-specific analysis of any actions. The Department
established this CE because the Department determined the type of
actions covered by the CE normally do not significantly affect the
quality of the human environment. This finding is based on the analysis
of these types of actions as documented in the Substantiation Report
and supporting documentation, including a review of EAs that supported
FONSIs to demonstrate the finding that actions covered by this CE would
not significantly affect the quality of the human environment. This
review included post-implementation validation of these FONSIs. In
addition, before using the CE for future actions, bureaus must review
for the presence of any extraordinary circumstances. Through
extraordinary circumstances review, the bureaus verify whether any
proposed action would have significant effects on ecologically
significant or critical areas, or similar natural resources; or on
species listed, or proposed to be listed, under the ESA, or on any
designated critical habitat at the particular site of the proposed
covered action. If bureaus cannot use this CE to support its decision
due to the presence of extraordinary circumstances, then they would
conduct the appropriate additional NEPA review, whether an EA or EIS.
Comment 6: The Department received comments suggesting the
Department should solicit public comment on all forestry projects and
that use of the CE without public comment would ignore the collective
knowledge of stakeholders.
Response 6: There are various opportunities for the public and
stakeholders to provide public input in forest management. For the BLM,
this includes the development, revision, and amendment of land use
plans, through which the BLM determines the forest management direction
for each specific planning area.
Comment 7: The Department received comments suggesting that
establishment of and use of this CE would allow bureaus, including the
BLM, to focus limited resources where they are most needed, while
accelerating responsible actions that benefit forests, access,
recreation, wildlife, and the public.
Response 7: While the establishment of this CE does not authorize
any forest management activities, it does provide a tool the Department
can use for NEPA compliance for future proposed actions of the type
covered in the CE without the need to prepare an EIS or an EA, which
could allow the agency to focus its analytical resources more
efficiently to benefit the public and federally managed lands.
Comment 8: The Department received comments suggesting the CE group
selection parameters should be increased to align with the management
in the BLM's 2016 Western Oregon RMPs which allow for up to 4 acres in
size, up to 30 percent of the stand area, and leave untreated areas
(skips) on at least 10 percent of the stand area.
Response 8: The Department acknowledges that the 2016 Western
Oregon RMPs allow larger group selections than this CE; however, this
feature of the 2016 Western Oregon RMPs is not relevant to whether
thinning actions have significant effects for purposes of NEPA.
Additionally, this CE may be used for projects outside the areas
governed by the 2016 Western Oregon RMPs. The two-acre group selection
limit was based on the projects and EAs evaluated in the Substantiation
Report, which involved a range of forest types and applicable RMP or
other management direction.
Comment 9: The Department received comments suggesting that it did
not explain why two-acre group selection openings would not have
significant impacts.
Response 9: The Substantiation Report explains this in detail. The
Report summarized the Department's review of 25 EAs that analyzed group
selections included in proposed actions as well as conducting post-
implementation review and determined the actions covered by the CE
would not significantly affect the quality of the human environment
(Substantiation Report, pp. 20, 22, 24, 26, and Appendix A). As
explained in the Report, while multiple EAs with FONSIs reviewed had
materially higher intensities and/or larger groups, the two-acre group
selection opening in the CE is within the limits of the EAs reviewed
for those actions that are already demonstrated to have non-significant
effects (Substantiation Report, p. 20). The Substantiation Report also
includes references to studies that document the necessity of openings
for regeneration of shade intolerant tree species, the height growth
changes relative to patch size, and the surface temperature, wind
speed, and soil moisture changes (York et al. 2007; Bigelow et al.
2011; Bigelow and North 2012) (Substantiation Report, p. 25). Under the
parameters of the CE, when using the CE, the bureau must generally
retain large trees and snags consistent with applicable land use plan
management direction. The impact of dense forests on the regeneration
of shade intolerant tree species in the western United States has been
well documented. Therefore, to ensure flexibility to design proposed
actions that use group selection silviculture for regeneration
purposes, and because the completed projects reviewed demonstrated that
this group size did not normally result in significant
[[Page 54747]]
impacts, the Department set this CE parameter at two acres.
Comment 10: The Department received comments questioning
justification for the 5,000-acre limit parameter, the associated
environmental impacts, and statistical methods used to derive the
limit.
Response 10: The 5,000-acre limit of this CE is supported by those
EAs summarized in the Substantiation Report. As explained in the
Report, twelve projects exceeded the upper IQR fence (5,385 acres) and
were analyzed separately for purposes of setting a robust cap. Using
the remaining 72 projects, the 99th percentile is 5,158 acres; for
administrative clarity and added conservatism, BLM rounds to 5,000
acres as the CE acreage cap. The use of a post-outlier 99th percentile
aligns with EPA practice (U.S. EPA 2000a; U.S. EPA 2000b)
(Substantiation Report, p. 20). In addition, 14 projects in the
Substantiation Report are over the 5,000-acre limit, including 6
substantially larger projects that covered between 10,000 and 31,191
(Substantiation Report, pp. 19-20). The review of these forestry
project EAs, including post-implementation validation of the FONSIs
they supported, demonstrates that the Department can implement thinning
projects up to 5,000 acres covered by this CE without significant
impacts. This conclusion is unaffected by the fact that the BLM has
also approved actions covered by this CE on fewer acres and determined
that these actions did not have significant impacts on the human
environment. Therefore, the Department retained the 5,000-acre limit
for the CE along with the accompanying nine design feature categories.
Comment 11: The Department received comments questioning the
permanent and temporary road construction parameters, the associated
environmental impacts, and the statistical methods used to derive them.
Response 11: The CE includes a five-mile limit for permanent road
construction and 2.5 miles per 1,000 acres limit for temporary road
construction. The explanation for these limits is described in the
Substantiation Report, pp. 20-21. Additionally, of the 84 EAs evaluated
in the Substantiation Report, 35 EAs analyzed new permanent road
construction included in the proposed actions. The five-mile permanent
road limit parameter in the CE is less than the new permanent road
miles proposed in 14 projects analyzed in the EAs and substantially
smaller than six projects analyzed in the EAs that added between 10.5
and 76.3 miles of new permanent road. The 2.5-mile-per-1,000-acre
temporary road construction limit reflects the range of these
activities demonstrated in the EAs and supported by FONSIs, as
explained in the Substantiation Report, with temporary roads further
bounded by mandatory decommissioning and stabilization standards under
the design feature categories. The projects reviewed for the
Substantiation Report, and the validation of their associated FONSIs
through post-implementation review, show that the Department can
implement density management projects that include permanent and/or
temporary road construction as long as these projects conform to the
applicable land use plan management direction for roads without causing
significant impacts; therefore, the CE includes the permanent and
temporary road construction limits originally proposed.
Comment 12: The Department received comments stating that because
the CE does not limit the number of times the CE may be used,
potentially exempting projects from the requirement to prepare an EIS
or an EA, the CE may result in significant cumulative impacts from the
implementation of multiple 5,000-acre projects.
Response 12: The analysis in the EAs described in the
Substantiation Report included consideration of other actions,
including other forest management actions, that had taken place or were
taking place, or were planned for the area, demonstrating that even in
the context of several other projects, the actions covered by this CE
did not normally result in significant impacts. As shown in the EAs for
the projects reviewed for the Substantiation Report, the relevant
indicator for forest health is not the acreage limit but the forest
density achieved. The Department established the 5,000 acre-limit based
on the information available as well as the incorporation of the
accompanying nine design feature categories that address the potential
for adverse impacts from these types of projects, even in the context
of other projects. In addition, while the CE itself does not include a
limit on the number of times it may be used, each proposed action
considered for approval in use of the CE must be reviewed against the
Department's extraordinary circumstances, one of which, and here most
relevant, is that if a proposed action may ``have a direct relationship
to other actions that implicate potentially significant environmental
effects'' (43 CFR 46.215(e)) the bureau must prepare an EA or EIS. This
means that if the bureau determines that a proposed forestry action has
a direct relationship to a previously conducted, or planned project
that may implicate potentially significant environmental effects, such
as may (hypothetically) arise when several forestry actions may have
occurred or may occur in the same area, the bureau would need to
prepare an EA or EIS.
Comment 13: The Department received comments suggesting that the CE
mandate design feature categories rather than just requiring
disclosure.
Response 13: The CE lists nine categories of design features that
were common to the projects analyzed in the EAs reviewed for the
Substantiation Report. Because forestry actions may be proposed in
areas that may be governed by different land use plans, developed as
appropriate to the planning area, the specifics for the design features
may similarly vary as appropriate to the planning area; therefore,
instead of setting forth the specific design feature, when the bureau
proposes to use the CE, the bureau must document the specific design
feature applicable to the category of design feature identified in the
CE's terms. In this way, covered forestry actions must ensure
appropriate treatment of these common resource issues in a way that
matches the conditions specific to the planning area, and ``where no
plan requirements apply [the bureau decision record authorizing the
covered action must] specify how these considerations are addressed''
in the proposed forestry action.
Categorical Exclusion Justification
The Department finds that the type of actions described in this
forestry and woodland density management CE do not normally have a
significant effect on the quality of the human environment. This
finding is based on the analysis of these types of actions, as
documented in the BLM's Substantiation Report for this CE, supporting
documents, and the relevant scientific literature. To demonstrate the
finding that actions under the proposed CEs would not normally result
in significant effects on the quality of the human environment, the
Department reviewed proposed actions evaluated in 84 EAs that supported
FONSIs as well as post-implementation information and summarized them
in the Substantiation Report.
As with other administratively developed CEs for bureaus, when
applying this CE, Responsible Officials must evaluate proposed actions
to determine whether any extraordinary circumstances are present in
accordance with the requirements in the Department's NEPA implementing
procedures at 43 CFR 46.205 and
[[Page 54748]]
46.215. For use of this CE, the Responsible Official must document this
review. If the Responsible Official cannot use this CE to support a
decision to authorize density management in forests or woodlands due to
the presence of extraordinary circumstances, the Responsible Official
must prepare an EA or EIS before authorizing such activities,
consistent with 43 CFR 46.205(c) and 42 U.S.C. 4336(b).
The Department consulted with CEQ on the establishment of this new
forest and woodland density management CE consistent with section
102(2)(B) of NEPA, 42 U.S.C. 4332(2)(B).
III. Text Added to the U.S. Department of the Interior Handbook of NEPA
Implementing Procedures, Appendix 2: Bureau Categorical Exclusions
The DOI Handbook of NEPA Implementing Procedures, Appendix 2:
Bureau Categorical Exclusions includes the following language:
Bureau of Land Management
11.9 Actions Eligible for a Categorical Exclusion (CE)
* * * * *
C. Forestry
* * * * *
(11) *Modification of tree density up to 5,000 acres of treatment
area. Does not include silvicultural methods that are intended to
regenerate whole stands, such as even-aged regeneration harvest,
clearcutting, or variable retention harvest, or vegetation management
intended to convert forest or woodlands to non-forest vegetation cover.
(a) Covered actions include:
(i) Cutting, yarding, and the use of landings and skid trails to
facilitate the removal of commercial and non-commercial trees
(ii) Chipping/grinding or removal of residual slash.
(iii) Group selection silvicultural treatment to promote
regeneration of shade intolerant species and early successional habitat
in an uneven-aged context not to exceed 2-acre individual patches and
10 percent of the treatment area. Group selection openings will retain
overstory legacy elements consistent with the applicable land use plan
(e.g., large fire resilient trees, snags).
(iv) Pile burning or underburning of fuels created by covered
actions described in subparagraphs (i)-(iii) of this paragraph and
fuels within or in close proximity to those actions' treatment
boundaries whether created by those actions or not.
(v) Seeding or planting necessary to accelerate native species re-
establishment.
(b) Such actions:
(i) Must not exceed 5 miles of new permanent road construction to
facilitate the covered actions and all segments must conform to
applicable land use planning decisions with route-specific designations
disclosed where travel management planning has been completed.
(ii) May include maintenance and renovation of existing roads as
needed.
(iii) May include construction of temporary roads not to exceed a
ratio of 2.5 miles per 1,000 acres of treatment area as needed,
provided they are not part of the bureau's permanent transportation
system, are designed to standards appropriate for their intended use
(safety, erosion control, sedimentation prevention, and resource
protection), are not needed for long-term resource management, and are
decommissioned and stabilized after use to minimize erosion and protect
water quality.
(iv) Must disclose design features in documentation of finding that
an action is excluded pursuant to the use of this categorical exclusion
that address the following resource considerations, consistent with
applicable land use plan decisions, or, where no plan requirements
apply, and specify how these considerations are addressed:
(1) Snag and downed wood--amount to be created or retained;
(2) Erosion control--specifications or measures (e.g., water bars,
dispersed slash);
(3) Soil compaction--criteria for avoidance, minimization, or
remediation;
(4) Logging systems--types and scope of constraints (e.g.,
seasonal, location, extent, etc.);
(5) Seasonal operations--purpose and extent of operating
restrictions;
(6) Invasive species--measures to prevent or limit spread;
(7) Riparian areas--buffer widths and/or operating restrictions;
(8) Prescribed fire--operating constraints for underburning or pile
burning; and
(9) Temporary roads--decommissioning standards.
(c) Definitions:
(i) Permanent road: A road constructed or reconstructed, managed as
part of the bureau's permanent transportation system.
(ii) Temporary road: A road authorized by contract, permit, lease,
written authorization, or emergency operation, not added to the
permanent system, and decommissioned after use.
(iii) Group selection: An uneven-aged harvest method where groups
of trees are removed to promote spatial heterogeneity, regeneration of
desired tree species, or the establishment of new cohorts.
* * * * *
Authorities: NEPA, as amended (42 U.S.C. 4321 et seq.).
Stephen G. Tryon,
Director, Office of Environmental Policy and Compliance.
[FR Doc. 2026-17252 Filed 8-21-26; 8:45 am]
BILLING CODE 4331-27-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on August 24, 2026.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.