Erie Boulevard Hydropower, L.P.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
August 7, 2026

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 151 (Friday, August 7, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 151 (Friday, August 7, 2026)]
[Notices]
[Pages 51162-51165]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-16169]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2569-169]


Erie Boulevard Hydropower, L.P.; Notice of Application Accepted 
for Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed

[[Page 51163]]

with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2569-169.
    c. Date Filed: August 30, 2024.
    d. Applicant: Erie Boulevard Hydropower, L.P. (Erie).
    e. Name of Project: Black River Hydroelectric Project (project).
    f. Location: On the Black River in Jefferson County, New York.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Mr. Steven P. Murphy, Director--U.S. 
Licensing, Brookfield Renewable, 33 West 1st Street South, Fulton, NY 
13069; telephone at (315) 598-6130; email at 
<a href="/cdn-cgi/l/email-protection#481b3c2d38202d2666053d3a382031082a3a2727232e212d242c3a2d262d3f292a242d662b2725"><span class="__cf_email__" data-cfemail="b7e4c3d2c7dfd2d999fac2c5c7dfcef7d5c5d8d8dcd1ded2dbd3c5d2d9d2c0d6d5dbd299d4d8da">[email&#160;protected]</span></a>.
    i. FERC Contact: Nicholas Ettema, Project Coordinator, Great Lakes 
Branch, Division of Hydropower Licensing; telephone at (312) 596-4447; 
email at <a href="/cdn-cgi/l/email-protection#036d6a606b6c6f62702d667777666e6243656671602d646c75"><span class="__cf_email__" data-cfemail="e08e8983888f8c8193ce859494858d81a086859283ce878f96">[email&#160;protected]</span></a>.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
fishway prescriptions: October 5, 2026, by 5:00 p.m. Eastern Time. 
Deadline for filing reply comments: November 17, 2026, by 5:00 p.m. 
Eastern Time.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief comments up to 10,000 
characters, without prior registration, using the eComment system at 
<a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please 
contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#84c2c1d6c7cbeae8edeae1d7f1f4f4ebf6f0c4e2e1f6e7aae3ebf2"><span class="__cf_email__" data-cfemail="04424156474b6a686d6a61577174746b767044626176672a636b72">[email&#160;protected]</span></a>, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, you may submit a paper copy. Submissions sent via the U.S. 
Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426. Submissions sent via any other carrier must be 
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. The 
first page of any filing should include docket number P-2569-169.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. Project Description: The project consists of the following five 
developments from upstream to downstream: the 5.0625-megawatt (MW) 
Herrings Development, the 10.8-MW Deferiet Development, the 5.4-MW 
Kamargo Development, the 6-MW Black River Development, and the 1.875-MW 
Sewalls Development.

Project Facilities

Herrings Development

    The Herrings Development consists of a 729-foot-long, 25-foot-high 
dam (Herrings dam) that includes: (1) a 512-foot-long ogee spillway 
with 1-foot-high flashboards that have a crest elevation of 680.1 feet 
North American Vertical Datum of 1988 (NAVD 88); (2) a stoplog gate; 
and (3) a 137-foot-long powerhouse that includes: (a) an intake 
structure with a stoplog gate, nine slide gates, a skimmer with stoplog 
gate, and a trashrack with 2-inch clear bar spacing and (b) three 
1.6875-MW vertical propeller turbine-generators. The dam creates an 
impoundment that has a surface area of 140 acres at an elevation of 
680.1 feet NAVD 88.
    From the impoundment, water flows through the powerhouse to a 
tailrace that discharges into the Black River. The project generators 
are connected to the regional electric grid by two generator lead lines 
and a transformer. The project recreation facilities include a hand-
carry boat access site that includes a picnic area and parking area on 
the north shoreline of the impoundment, a portage trail, a put-in site, 
and two fishing access sites.

Deferiet Development

    The Deferiet Development consists of a 926.9-foot-long, 18-foot-
high dam (Deferiet dam) that includes: (1) a 503.9-foot-long spillway 
with a 3-foot-high inflatable rubber crest gate with a maximum crest 
elevation of 659.53 feet NAVD 88; (2) eleven stoplog gates; and (3) a 
canal headworks structure with ten sluice gates. The dam creates an 
impoundment that has a surface area of 70 acres at 659.53 feet NAVD 88.
    From the impoundment water flows through the canal headworks 
structure to a 4,200-foot-long power canal. From the power canal, water 
enters a powerhouse that includes: (1) an intake structure with three 
sluice gates and a trashrack with 2-inch clear bar spacing; and (2) 
three 3.6-MW vertical Francis turbine-generators. From the powerhouse, 
water flows to a tailrace that discharges into the Black River. The 
development creates an approximately 1.73-mile-long bypassed reach.
    The generators are connected to the regional electric grid by three 
overhead generator lead lines and a transformer. The project recreation 
facilities include two impoundment access sites for hand-carry boats, a 
portage trail, a put-in site downstream of the dam, a hiking trail, and 
a boat access site and parking area downstream of the powerhouse.

Kamargo Development

    The Kamargo Development consists of a 188-foot-long headgate 
structure that includes fourteen sluice gates and an 886-foot-long, 24-
foot-high dam (Kamargo dam) that includes a 647-foot-long ogee spillway 
with 2-foot-high flashboards that have a crest elevation of 565.48 feet 
NAVD 88 and a 5.7-foot-long, 6-foot-high notch. The dam creates an 
impoundment that has a surface area of 40 acres at 565.48 feet NAVD 88.
    From the impoundment, water flows through the headgate structure to 
a 3,850-foot-long power canal that includes a 160.8-foot-long ogee 
spillway with twelve stoplog gates and low-level sluice gate that 
discharge into the Black River. From the power canal, water enters a 
powerhouse that includes: (1) an intake structure with nine sluice 
gates and a trashrack with 2-inch clear bar spacing; and (2) three 1.8-
MW vertical Francis turbine-generators. From the powerhouse, water 
flows to a tailrace that discharges into the Black River. The 
development creates a 0.69-mile-long bypassed reach.
    The generators are connected to the regional electric grid by four 
generator lead lines and a transformer. The project includes the Poors 
Island Recreation Area that includes two portage trails, fishing access 
areas, a picnic area, a bicycle rack, a hiking trail, and parking area.

Black River Development

    The Black River Development consists of a 362.5-foot-long, 27.8-
foot-high dam (Black River dam) that includes: (1) two sluice gates, a 
291-foot-long ogee spillway with a 4.5-foot-long, 3.5-foot-high notch 
and 2-foot-high flashboards that have a crest elevation of 535.68 feet 
NAVD 88, and a stoplog gate; and (2) a 99.6-foot-long headgate 
structure with five sluice gates. The dam creates an impoundment that 
has a surface area of 25 acres at 535.68 feet NAVD 88.

[[Page 51164]]

    From the impoundment, water flows through the headgate structure to 
a 2,250-foot-long power canal that includes: (1) a 250-foot-long waste 
weir with a crest elevation of 537.68 NAVD 88; and (2) a 134-foot-long 
waste weir with 2-foot-high flashboards and a low-level outlet gate. 
From the power canal, water enters a powerhouse that includes: (1) an 
intake structure with nine sluice gates, a skimmer equipped with two 
sluice gates, and a trashrack with 2-inch clear bar spacing; and (2) 
three 2-MW vertical Francis turbine-generators. From the powerhouse 
water flows to a tailrace that discharges into the Black River. The 
development creates an approximately 0.6-mile-long bypassed reach of 
the Black River.
    The generators are connected to the regional electric grid by two 
underground generator lead lines and a transformer. The project 
recreation facilities include: (1) a parking area, picnic area, and 
fishing platform, referred to as the ``Stone Drive Recreation Area,'' 
located on the north shoreline of the impoundment; (2) a hand-carry 
boat portage route with an impoundment take-out site, a portage trail, 
and a put-in site downstream of the dam; and (3) a picnic and parking 
area southeast of the dam.

Sewalls Development

    The Sewalls Development consists of: (1) a 345-foot-long, 15.5-
foot-high south dam (Sewalls dam) that includes a 243-foot-long ogee 
spillway with a crest elevation of 463.73 feet NAVD 88, two stoplog 
gates, and two sluice gates; and (2) a north dam that includes a 95.9-
foot-long, 18.5-foot-high spillway with a crest elevation of 463.73 
feet NAVD 88 and a 3.61-foot-long, 2-foot-high notch. The dam creates 
an impoundment that has a surface area of 4 acres at 463.73 feet NAVD 
88.
    From the impoundment water flows through the sluice gates to a 400-
foot-long power canal with 2-foot-high flashboards, a sluice gate, and 
a low-level outlet gate. From the power canal, water enters a 
powerhouse that includes: (1) an intake structure with four sluice 
gates and a trashrack with 2-inch clear bar spacing; and (2) two 
0.9375-MW vertical propeller turbine-generators. From the powerhouse, 
water flows to a tailrace that discharges into the Black River. The 
development creates an approximately 400-foot-long bypassed reach of 
the Black River downstream of the south dam (south channel bypassed 
reach); and an approximately 0.25-mile-long bypassed reach downstream 
of the north dam (north channel bypassed reach).
    The generators are connected to the regional electric grid by two 
underground generator lead lines and a transformer. The project 
recreation facilities include a parking area and scenic overlook on the 
south shoreline of the impoundment, a portage trail, and an impoundment 
take-out site.

Proposed Project Operation and Environmental Measures

    Erie proposes to: (1) continue to operate the project so that the 
water levels at each development's impoundment are maintained no lower 
than 0.5 foot below the crest of the dam or flashboards, if present; 
(2) continue to operate the Sewalls Development in run-of-river mode 
from May 1 through September 30 when flows in the Black River are less 
than 2,000 cfs; (3) continue to install flashboards at all developments 
by May 1 of each year, or as soon as possible thereafter; (4) continue 
to release a minimum flow of 1,000 cfs, or inflow, whichever is less, 
downstream of each development; (5) continue to release the following 
minimum flows or inflow, whichever is less, to the bypassed reaches: 
(a) 20 cfs at the Herrings Development; (b) 245 cfs at the Deferiet 
Development, with 800 cfs during the walleye spawning season in the 
spring; (c) 120 cfs at the Kamargo Development; (d) 80 cfs at the Black 
River Development with 300 cfs during the walleye spawning season; and 
(e) 32 cfs into the north channel bypassed reach and 137 cfs into the 
south channel bypassed reach at the Sewalls Development; (6) continue 
to maintain seasonal trashracks with 1-inch clear bar spacing in the 
top half of the water column from May 1 to October 1 at each 
development except the Sewalls Development; (7) continue to implement 
the Streamflow and Headpond Monitoring Plan; (8) continue to implement 
the Minimum Flow and Fish Conveyance Plan; (9) continue to maintain 
woodland buffers along the shorelines of each development; (10) update 
and continue to implement the Recreation Plan that requires operation 
and maintenance of the project recreation facilities described above; 
(11) notify the public via an online platform of bypassed reach flow 
and relevant safety information for the Deferiet Development; (12) 
enhance a fishing area at the Herrings Development by formalizing and 
maintaining a designated trail to the water's edge; (13) enhance a 
staircase at the put-in site downstream of the dam at the Deferiet 
Development to improve access for whitewater boaters; (14) continue to 
maintain project facilities, including fencing and outbuildings, in a 
dark brown/green color; and (15) develop a historic properties 
management plan.
    m. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document (i.e., P-2569). For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the Roswell P. Flower Memorial Library, located at 229 
Washington Street, Watertown, NY 13601.
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name of the person 
protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed on the service list prepared by the Commission in this

[[Page 51165]]

proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#8cc3dcdccceae9feefa2ebe3fa"><span class="__cf_email__" data-cfemail="e1aeb1b1a187849382cf868e97">[email&#160;protected]</span></a>.
    o. The applicant must file on or before 5:00 p.m. Eastern Time on 
October 5, 2026: (1) a copy of the water quality certification; (2) a 
copy of the request for certification, including proof of the date on 
which the certifying agency received the request; or (3) evidence of 
waiver of water quality certification.
    p. Final amendments to the application must be filed with the 
Commission on or before 5:00 p.m. Eastern Time on September 3, 2026.

(Authority: 18 CFR 2.1)

    Dated: August 4, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-16169 Filed 8-6-26; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on August 7, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.