Skip to main content
Notice2026-16168

Erie Boulevard Hydropower, L.P.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
August 7, 2026

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 151 (Friday, August 7, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 151 (Friday, August 7, 2026)]
[Notices]
[Pages 51165-51168]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-16168]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2645-176]


Erie Boulevard Hydropower, L.P.; Notice of Application Accepted 
for Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2645-176.
    c. Date Filed: July 30, 2024.
    d. Applicant: Erie Boulevard Hydropower, L.P. (Erie).
    e. Name of Project: Beaver River Hydroelectric Project (project).
    f. Location: On the Beaver River in Lewis and Herkimer Counties, 
New York.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Steven P. Murphy, Director--U.S. 
Licensing, Brookfield Renewable, 33 West 1st Street South, Fulton, NY 
13069; telephone at (315) 598-6130; email at 
<a href="/cdn-cgi/l/email-protection#83d0f7e6f3ebe6edadcef6f1f3ebfac3e1f1ecece8e5eae6efe7f1e6ede6f4e2e1efe6ade0ecee"><span class="__cf_email__" data-cfemail="77240312071f1219593a0205071f0e37150518181c111e121b13051219120016151b125914181a">[email&#160;protected]</span></a>.
    i. FERC Contact: Nicholas Ettema, Project Coordinator, Great Lakes 
Branch, Division of Hydropower Licensing; telephone at (312) 596-4447; 
email at <a href="/cdn-cgi/l/email-protection#d9b7b0bab1b6b5b8aaf7bcadadbcb4b899bfbcabbaf7beb6af"><span class="__cf_email__" data-cfemail="157b7c767d7a7974663b70616170787455737067763b727a63">[email&#160;protected]</span></a>.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
fishway prescriptions: October 5, 2026, by 5:00 p.m. Eastern Time. 
Deadline for filing reply comments: November 17, 2026, by 5:00 p.m. 
Eastern Time.
    The Commission strongly encourages electronic filing. Please file 
motions to

[[Page 51166]]

intervene, protests, comments, recommendations, preliminary terms and 
conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief comments up to 10,000 
characters, without prior registration, using the eComment system at 
<a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please 
contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#c88e8d9a8b87a6a4a1a6ad9bbdb8b8a7babc88aeadbaabe6afa7be"><span class="__cf_email__" data-cfemail="b5f3f0e7f6fadbd9dcdbd0e6c0c5c5dac7c1f5d3d0c7d69bd2dac3">[email&#160;protected]</span></a>, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, you may submit a paper copy. Submissions sent via the U.S. 
Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426. Submissions sent via any other carrier must be 
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. The 
first page of any filing should include docket number P-2645-176.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. Project Description: The project consists of the following eight 
developments from upstream to downstream: the 8-megawatt (MW) Moshier 
Development, the 5.81-MW Eagle Development, the 12.145-MW Soft Maple 
Development, the 2.8-MW Effley Development, the 1.5-MW Elmer 
Development, the 4.645-MW Taylorville Development, the 2.21-MW Belfort 
Development, and the 4.8-MW High Falls Development.

Project Facilities

Moshier Development

    The Moshier Development consists of an approximately 1,132-foot-
long, 93-foot-high dam (Moshier dam) that includes an intake structure 
with two slide gates and two trashracks with 1-inch clear bar spacing, 
a sluice gate, and a 200-foot-long ogee spillway with 2-foot-high 
flashboards that have a crest elevation of 1,641.48 feet North American 
Vertical Datum of 1988 (NAVD 88). The dam creates an impoundment that 
has a surface area of 340 acres at 1,641.48 feet NAVD 88. From the 
impoundment, water flows through the intake structure to an 
approximately 1.9-mile-long penstock. The penstock bifurcates into two 
70-foot-long penstocks that convey water to a powerhouse that includes 
two 4-MW vertical Francis turbine-generators. From the powerhouse, 
water flows to the tailrace and discharges into the Beaver River. Water 
also flows through the sluice gate to provide minimum flows to a 2.1-
mile-long bypassed reach of the Beaver River. The generators are 
connected to the regional electric grid by two overhead generator lead 
lines and a transformer. The project recreation facilities include an 
impoundment take-out site, a portage trail, a hand-carry boat put-in 
site downstream of the powerhouse, 2 parking areas, and a whitewater 
boating put-in site in the bypassed reach.

Eagle Development

    The Eagle Development consists of a 369.5-foot-long, 21-foot-high 
dam (Eagle dam) that includes a headgate structure that includes four 
stoplog gates and four trashracks with 1-inch clear bar spacing, a 
sluice gate, a 183-foot-long ogee spillway with 1-foot-high flashboards 
that have a crest elevation of 1,426.65 feet NAVD 88, and two low-level 
needle beam gates. The dam creates an impoundment that has a surface 
area of 138 acres at 1,426.65 feet NAVD 88.
    From the impoundment, water flows through the headgate structure to 
a forebay canal with a stoplog gate. From the forebay canal, water 
enters an intake structure with three slide gates and a trashrack with 
1.25-inch clear bar spacing. From the intake structure, water enters a 
2,725-foot-long penstock that conveys water to a powerhouse that 
includes three 1.35-MW horizontal Francis turbine-generators and a 
1.79-MW horizontal Francis turbine-generator. Water is discharged from 
the turbines to a tailrace. Water also flows through the sluice gate to 
provide minimum flows to the 0.73-mile-long bypassed reach. The 
generators are connected to the regional electric grid by a generator 
lead line and a step-up transformer. The project recreation facilities 
include: (1) a hand-carry boat portage route with an impoundment take-
out site, a portage trail, and a put-in site downstream of the 
powerhouse; (2) a fishing access trail to the bypassed reach; and (3) a 
boat put-in site downstream of the dam for whitewater flow release 
events.

Soft Maple Development

    The Soft Maple Development includes: (1) a 307-foot-long, 40-foot-
high earthen dam with an intake structure with six slide gates and 
three trashracks with 1-inch clear bar spacing; (2) a 720-foot-long, 
124-foot-high earthen dam (Terminal dam); (3) a 173-foot-long, 20-foot-
high concrete dam with two sluice gates and a 144-foot-long ogee 
spillway with 1.5-foot-high flashboards that have a crest elevation of 
1,289.9 feet NAVD 88; (4) a 910-foot-long, 67-foot-high earthen dam 
(Diversion dam) that includes an intake structure with a butterfly gate 
and a trashrack with 5-inch clear spacing; and (5) five earthen dikes. 
The dams and dikes create an impoundment that has a surface area of 400 
acres at 1,289.9 feet NAVD 88.
    From the impoundment, water flows through the intake structure to 
two 530-foot-long penstocks that provide water to a powerhouse that 
includes a 6.045-MW and a 6.1-MW vertical Francis turbine-generator. 
Water is discharged from the turbines to a tailrace. Minimum flows are 
provided from the impoundment through: (1) the two sluice gates; and 
(2) a 263.9-foot-long pipe equipped with a screen with 0.5-inch 
openings housed in a diversion tunnel that extends from the Diversion 
dam's intake structure. The generators are connected to the regional 
electric grid by two generator lead lines and a step-up transformer. 
The project recreation facilities include: (1) a hand-carry boat 
portage route with an impoundment take-out site, a portage trail, and a 
put-in site downstream of the powerhouse, with a parking area; (2) a 
campground adjacent to the impoundment, with 10 tent sites, an access 
road, a parking area, a car-top boat launch, and four restrooms; (3) 
seven primitive campsites on islands within the impoundment; (4) a 
picnic area; and (5) a trail to a scenic overlook with a view of the 
bypassed reach and a parking area.

Effley Development

    The Effley Development consists of a 1,370.8-foot-long, 30-foot-
high dam (Effley dam) that includes a south intake structure with a 
slide gate and a trashrack with 1-inch clear bar spacing, a north 
intake structure with three slide gates and a trashrack with 1-inch 
clear bar spacing, and a section that includes: (1) a 69.7-foot-long 
south ogee spillway with a crest elevation of 1,162.95 feet NAVD 88; 
(2) a stoplog gate and two low-level outlet gates; and (3) a 360.5-
foot-long north ogee spillway with a crest elevation of 1,162.95 feet 
NAVD 88

[[Page 51167]]

and a sluice gate. The dam creates an impoundment that has a surface 
area of 340 acres at 1,162.95 feet NAVD 88.
    From the impoundment, water enters through the south intake 
structure to a 148-foot-long penstock that provides water to a south 
powerhouse that includes a 1.44-MW vertical Francis turbine-generator. 
Water enters through the north intake structure to: (1) a 109.7-foot-
long penstock that provides water to a 0.56-MW horizontal Francis 
turbine-generator; and (2) two 87-foot-long penstocks that each 
provides water to a 0.4-MW horizontal Francis turbine-generator, 
located in a north powerhouse. Water is discharged from the powerhouses 
to a tailrace. Water also flows through sluice gate at the north 
spillway to provide minimum flows to the 0.11-mile-long bypassed reach. 
The generators are connected to the regional electric grid by two 
generator lead lines and a step-up transformer. The project recreation 
facilities include a hand-carry boat portage route that includes an 
impoundment take-out site, a portage trail, and a put-in site 
downstream of the dam.

Elmer Development

    The Elmer Development consists of a 326.6-foot-long, 23-foot-high 
dam (Elmer dam) that includes an intake structure with four slide gates 
and two trashracks with 1-inch clear bar spacing, a 122-foot-long west 
ogee spillway with a crest elevation of 1,107.96 feet NAVD 88, a needle 
beam gate, and a 113.8-foot-long east ogee spillway with a crest 
elevation of 1,107.96 feet NAVD 88. The dam creates an impoundment that 
has a surface area of 34 acres at 1,107.96 feet NAVD 88.
    From the impoundment, water flows through the intake structure to a 
powerhouse that includes two 0.75-MW vertical Francis turbine-generator 
units. Water is discharged from the powerhouse to a tailrace. Water 
also flows through an opening at the bottom of the needle beam gate 
that provides minimum flows to a 260-foot-long bypassed reach of the 
Beaver River. The generators are connected to the regional electric 
grid by a generator lead line and a step-up transformer. The project 
recreation facilities include a hand-carry boat portage route with an 
impoundment take-out site, a portage trail, and a put-in site 
downstream of the dam.

Taylorville Development

    The Taylorville Development consists of a 23-foot-high concrete dam 
(Taylorville dam) that includes a 348-foot-long ogee spillway with 0.8-
foot-high flashboards that have a crest elevation of 1,070.46 feet NAVD 
88 and a section that includes two sluice gates and two low-level 
stoplog gates, a 119.5-foot-long ogee spillway with 0.8-foot-high 
flashboards that have a crest elevation of 1,070.46 feet NAVD 88, a 
sluice gate, and an intake structure with three slide gates and a 
trashrack with 1-inch clear bar spacing. The development also includes 
two earthen dikes. The dam and dikes create an impoundment that has a 
surface area of 170 acres at 1,070.46 feet NAVD 88.
    From the impoundment, water flows through the intake structure to a 
2,725-foot-long penstock. The penstock conveys water to a powerhouse 
that includes two 1.1-MW, one 1.245-MW, and one 1.2-MW horizontal 
Francis turbine-generator. Water is discharged from the powerhouse to a 
tailrace. Water also flows through the sluice gates to provide minimum 
flows to a 0.86-mile-long bypassed reach of the Beaver River. The 
generators are connected to the regional electric grid by a generator 
lead line, a step-up transformer, and a 200-foot-long transmission 
line. The project recreation facilities include: (1) a hand-carry boat 
portage route that includes an impoundment access site, a portage 
trail, and a put-in site downstream of the powerhouse; (2) a walking 
trail that begins near the impoundment access site; (3) a picnic area 
near the boat take-out site with picnic tables, grills, and a parking; 
and (4) a picnic area near the boat put-in site.

Belfort Development

    The Belfort Development consists of a 600.5-foot-long, 17-foot-high 
dam (Belfort dam) that includes a 161.1-foot-long ogee spillway with 2-
foot-high flashboards that have a crest elevation of 965.64 feet NAVD 
88, a sluice gate, a low-level outlet gate, and an intake structure 
with two slide gates and two trashracks with 1-inch clear bar spacing. 
The dam creates an impoundment that has a surface area of 50 acres at 
965.64 feet NAVD 88.
    From the impoundment, water flows through the intake structure to a 
52-foot-long penstock that provides water to a 0.4-MW horizontal 
Francis turbine-generator and a 0.64-MW double horizontal Francis 
turbine-generator, and a 52-foot-long penstock that provides water to a 
1.17-MW double Francis turbine-generator. The turbine-generators are 
located in a powerhouse. Water is discharged from the powerhouse to a 
tailrace. Water also flows through the sluice gate at the spillway to 
provide minimum flows to a 0.13-mile-long bypassed reach of the Beaver 
River. The generators are connected to the regional electric grid by a 
generator lead line and a step-up transformer. The project recreation 
facilities include: (1) a hand-carry boat portage route with an 
impoundment take-out site, a portage trail, and a put-in site 
downstream of the powerhouse; and (2) a fishing platform adjacent to 
the dam that provides anglers with access to the impoundment.

High Falls Development

    The High Falls Development includes a 1,559.9-foot-long, 50-foot-
high concrete dam (High Falls dam) that includes an intake structure 
with four slide gates and four trashracks with 1-inch clear bar 
spacing, a 204-foot-long ogee spillway with a crest elevation of 914.82 
feet NAVD 88, a non-operational stoplog gate and low-level outlet gate, 
and a 445.9-foot-long ogee spillway with a crest elevation of 914.82 
feet NAVD 88 and a sluice gate. The development also includes two 
dikes. The dam and dikes create an impoundment that has a surface area 
of 145 acres at the spillway crest elevation of 914.82 feet NAVD 88.
    From the impoundment, water flows through the intake structure to a 
605-foot-long penstock that provides water to a powerhouse that 
includes three 1.6-MW vertical Francis turbine-generators. Water is 
discharged from the powerhouse to a tailrace. Water also flows through 
the sluice gate at the spillway to provide minimum flows to a 0.21-
mile-long bypassed reach of the Beaver River. The generators are 
connected to the regional electric grid by two generator lead lines and 
a step-up transformer. The project recreation facilities include: (1) a 
hand-carry boat portage route that includes an impoundment take-out 
site, a portage trail, and a put-in site downstream of the powerhouse; 
(2) five campsites on the islands in the impoundment; and (3) an 
impoundment access site that includes a hand-carry boat launch, picnic 
area, and parking area.

Proposed Project Operation and Environmental Measures

    Erie proposes to: (1) continue to limit impoundment fluctuations 
by: (a) 1 foot from May 1 through June 30 and 1.5 feet from July 1 
through April 30, for the Moshier, Soft Maple, and Effley Developments; 
(b) 1 foot at the Eagle, Elmer, Taylorville, and Belfort Developments; 
and (c) 1.5 feet at the High Falls Development, in the downward 
direction from the crest of the dam or the flashboards, if present; (2) 
continue to release the following minimum flows or inflow, whichever is 
less, to the bypassed reaches: (a) 45 cfs at the Moshier and Eagle 
Developments;

[[Page 51168]]

(b) 35 cfs at the Soft Maple Development; (c) 20 cfs at the Effley, 
Elmer, and Belfort Developments; (d) 60 cfs at the Taylorville 
Development; and (e) 30 cfs at the High Falls Development; (3) continue 
to release a minimum flow of 250 cfs downstream of the High Falls 
Development's powerhouse; (4) continue to implement the Low Flow 
Augmentation Plan, including consultation with the New York DEC to 
determine any alternative flow releases; (5) continue to implement the 
Streamflow and Headpond Elevation Monitoring Plan; (6) continue to 
implement the Minimum Flow and Fish Conveyance Plans for the Moshier, 
Soft Maple, Effley, Elmer, Belfort, Soft Maple, and High Falls 
Developments; (7) update and continue to implement the Recreation Plan 
that requires operation and maintenance of the project recreation 
facilities described above and releasing the following whitewater 
flows: (a) one 4-hour release of 400 cfs from Moshier dam; (b) five 4-
hour releases of 200 cfs from the Taylorville dam; and (c) five 4-hour 
releases of 200 cfs from Eagle dam; (8) maintain a fishing access area 
at the Moshier Development and bypassed reach trails at the Taylorville 
Development as project recreation facilities, including installing 
signage at the facilities; and (9) develop a historic properties 
management plan.
    m. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document (i.e., P-2645). For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at Lowville Free Library, located at 5387 Dayan St., 
Lowville, NY 13367, or the Frank J. Basloe Library, located at 245 Main 
St., Herkimer, NY 13350.
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name of the person 
protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed on the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#9fd0cfcfdff9faedfcb1f8f0e9"><span class="__cf_email__" data-cfemail="baf5eaeafadcdfc8d994ddd5cc">[email&#160;protected]</span></a>.
    o. The applicant must file on or before 5:00 p.m. Eastern Time on 
October 5, 2026: (1) a copy of the water quality certification; (2) a 
copy of the request for certification, including proof of the date on 
which the certifying agency received the request; or (3) evidence of 
waiver of water quality certification.
    p. Final amendments to the application must be filed with the 
Commission on or before 5:00 p.m. Eastern Time on September 3, 2026.

(Authority: 18 CFR 2.1.)

     Dated: August 4, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-16168 Filed 8-6-26; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on August 7, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.