Proposed Rule2026-11436

Approval and Promulgation of Air Quality Implementation Plans; Wyoming; Regional Haze Federal Implementation Plan

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
June 8, 2026

Issuing agencies

Environmental Protection Agency

Abstract

The U.S. Environmental Protection Agency (EPA) is proposing revisions to the Federal Implementation Plan (FIP) addressing regional haze in the State of Wyoming. The EPA is proposing revisions to the FIP's nitrogen oxides (NO<INF>X</INF>) best available retrofit technology (BART) requirements for the PacifiCorp Dave Johnston Power Plant Unit 3. In response to PacifiCorp's letter no longer consenting to closure of Dave Johnston Unit 3, the EPA is proposing to withdraw the NO<INF>X</INF> BART determination containing the closure requirement. Additionally, in response to a request from PacifiCorp, and in light of new information that was not available at the time the EPA originally promulgated the FIP in 2014, the Agency is also proposing to revise the other NO<INF>X</INF> BART determination for Dave Johnston Unit 3.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 109 (Monday, June 8, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 109 (Monday, June 8, 2026)]
[Proposed Rules]
[Pages 34589-34597]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-11436]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R08-OAR-2026-1651; FRL-13299-01-R8]


Approval and Promulgation of Air Quality Implementation Plans; 
Wyoming; Regional Haze Federal Implementation Plan

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The U.S. Environmental Protection Agency (EPA) is proposing 
revisions to the Federal Implementation Plan (FIP) addressing regional 
haze in the State of Wyoming. The EPA is proposing revisions to the 
FIP's nitrogen oxides (NO<INF>X</INF>) best available retrofit 
technology (BART) requirements for the PacifiCorp Dave Johnston Power 
Plant Unit 3. In response to PacifiCorp's letter no longer consenting 
to closure of Dave Johnston Unit 3, the EPA is proposing to withdraw 
the NO<INF>X</INF> BART determination containing the closure 
requirement. Additionally, in response to a request from PacifiCorp, 
and in light of new information that was not available at the time the 
EPA originally promulgated the FIP in 2014, the Agency is also 
proposing to revise the other NO<INF>X</INF> BART determination for 
Dave Johnston Unit 3.

DATES: 
    Comments: Written comments must be received on or before July 23, 
2026 unless a public hearing is held. If a public hearing is held, 
comments on this notice of proposed rulemaking must be received on or 
before date 30 days after date of public hearing.
    Public Hearing: Any party requesting a public hearing must notify 
the contact listed in the FOR FURTHER INFORMATION CONTACT section by 5 
p.m. Mountain Daylight Time on or before June 15, 2026. If a public 
hearing is held, it will take place on or around June 23, 2026.

ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R08-
OAR-2026-1651, to the Federal Rulemaking Portal: <a href="https://www.regulations.gov">https://www.regulations.gov</a>. Follow the online instructions for submitting 
comments. Once submitted, comments cannot be edited or removed from 
<a href="http://www.regulations.gov">www.regulations.gov</a>. The EPA may publish any comment received to the 
Agency's public docket. Do not submit electronically any information 
you consider to be Confidential Business Information (CBI) or other 
information the disclosure of which is restricted by statute. 
Multimedia submissions (audio, video, etc.) must be accompanied by a 
written comment. The written comment is considered the official comment 
and should include discussion of all points you wish to make. The EPA 
will generally not consider comments or comment contents located 
outside of the primary submission (i.e., on the web, cloud, or other 
file sharing system). For additional submission methods, the full EPA 
public comment policy, information about CBI or multimedia submissions, 
and general guidance on making effective comments, please visit <a href="https://www.epa.gov/dockets/commenting-epa-dockets">https://www.epa.gov/dockets/commenting-epa-dockets</a>.
    If a public hearing is requested on or before June 15, 2026, the 
EPA will post an update at <a href="https://www.epa.gov/wy/wyoming-events-and-public-notices">https://www.epa.gov/wy/wyoming-events-and-public-notices</a>. The EPA does not intend to publish a document in the 
Federal Register (FR) announcing updates. The public hearing will be 
held on or around June 23, 2026. Information on the hearing including 
the time and URL will be posted at <a href="https://www.epa.gov/wy/wyoming-events-and-public-notices">https://www.epa.gov/wy/wyoming-events-and-public-notices</a>.
    Docket: All documents in the docket are listed in the <a href="https://www.regulations.gov">https://www.regulations.gov</a> index. Although listed in the index, some 
information is not publicly available, e.g., CBI or other information 
the disclosure of which is restricted by statute. Certain other 
material, such as copyrighted material, will be publicly available only 
in hard copy. Publicly available docket materials are available 
electronically in <a href="https://www.regulations.gov">https://www.regulations.gov</a>. Please email or call the 
person listed in the FOR FURTHER INFORMATION CONTACT section if you 
need to make alternative arrangements for access to the docket.

FOR FURTHER INFORMATION CONTACT: For information about this proposed 
rule, contact Jaslyn Dobrahner, Air and Radiation Division, EPA, Region 
8, Mailcode 8ARD-IO, 1595 Wynkoop Street, Denver, Colorado 80202-1129, 
telephone number: (303) 312-6252, email address: 
<a href="/cdn-cgi/l/email-protection#ceaaa1acbcafa6a0abbce0a4afbda2b7a08eabbeafe0a9a1b8"><span class="__cf_email__" data-cfemail="33575c5141525b5d56411d5952405f4a5d735643521d545c45">[email&#160;protected]</span></a>.

SUPPLEMENTARY INFORMATION: Throughout this document, the use of ``we,'' 
``us,'' or ``our'' is intended to refer to the EPA. We use multiple 
acronyms and terms in this preamble. While this list may not be 
exhaustive, to ease the reading of this preamble and for reference 
purposes, the EPA defines the following terms and acronyms here:

BART Best Available Retrofit Technology
CAA Clean Air Act
CAMPD Clean Air Markets Program Data
CBI Confidential Business Information
CFR Code of Federal Regulations
EGU Electric Generating Unit
EPA U.S. Environmental Protection Agency
FGD Flue Gas Desulfurization
FIP Federal Implementation Plan
FLM Federal Land Manager
FR Federal Register
IRP Integrated Resource Plan
LB Pound
LNB/OFA Low-NO<INF>X</INF> Burners With Overfire Air
MMBtu Million British Thermal Units
MW Megawatt
NAAQS National Ambient Air Quality Standards
NERC North American Electric Reliability Corporation
NO<INF>X</INF> Nitrogen Oxides
OMB Office of Management and Budget
PM Particulate Matter
PRA Paperwork Reduction Act
RFA Regulatory Flexibility Act
RHR Regional Haze Rule
RTC Response to Comments
SCR Selective Catalytic Reduction
SIP State Implementation Plan
SNCR Selective Non-Catalytic Reduction
SO<INF>2</INF> Sulfur Dioxide
TPY Tons Per Year

[[Page 34590]]

UMRA Unfunded Mandates Reform Act
USFS United States Forest Service

Table of Contents

I. What action is the EPA proposing?
II. Background
    A. Dave Johnston Power Plant
    B. Legal Authority and Requirements
    C. Regulatory History
III. NO<INF>X</INF> BART Determination for Dave Johnston Unit 3
    A. Costs of Compliance
    B. Energy and Non-Air Quality Environmental Impacts of 
Compliance
    C. Pollution Control Equipment in Use at the Source
    D. Remaining Useful Life of the Source
    E. Degree of Improvement in Visibility
    F. Conclusion
IV. Coordination With FLMs
V. Clean Air Act Section 110(l)
VI. Statutory and Executive Order Reviews

I. What action is the EPA proposing?

    The EPA is proposing to revise the Wyoming regional haze FIP to 
amend the NO<INF>X</INF> BART determination for Dave Johnston Unit 3. 
Specifically, the EPA is proposing to: (1) remove the NO<INF>X</INF> 
BART requirement of 0.28 pounds per million British thermal units (lb/
MMBtu) (30-day rolling average) interim emission limit and permanent 
cessation of operations at Dave Johnston Unit 3 on or before December 
31, 2027; and (2) revise the other NO<INF>X</INF> BART requirement of 
0.07 lb/MMBtu (30-day rolling average).\1\ Specifically, the EPA is 
proposing to revise the NO<INF>X</INF> BART determination and establish 
a new NO<INF>X</INF> BART requirement of 0.23 lb/MMBtu (30-day rolling 
average) and associated compliance date for Dave Johnston Unit 3. 
Although the EPA is proposing to revise the Wyoming regional haze FIP 
NO<INF>X</INF> BART determination for Dave Johnston Unit 3, the Agency 
invites Wyoming to submit a new regional haze State Implementation Plan 
(SIP) NO<INF>X</INF> BART determination in the future for Dave Johnston 
Unit 3 to the Agency in an effort to replace this FIP with a SIP.
---------------------------------------------------------------------------

    \1\ 40 CFR 52.2636(c)(1) Table 2 and 40 CFR 52.2636(d)(4).
---------------------------------------------------------------------------

II. Background

A. Dave Johnston Power Plant

    The Dave Johnston power plant is located in Converse County, 
Wyoming and is comprised of four coal-fired units, but only Units 3 and 
4 are subject to BART requirements.\2\
---------------------------------------------------------------------------

    \2\ Dave Johnston Units 1 and 2 began operation in 1958 and 
1960, respectively. BART applies to sources built between 1962 and 
1977.
---------------------------------------------------------------------------

    Dave Johnston Unit 3 is a 230 megawatt (MW) coal-fired boiler that 
commenced service in 1964. The coal is currently sourced from the Dry 
Fork Mine, Caballo Mine, and Coal Creek Mine in the Powder River Basin 
in Wyoming.\3\ In June 2008, Wyoming issued a construction permit 
approving PacifiCorp's construction permit application request to 
install new emission controls at Dave Johnston Units 3 and 4.\4\ In 
December 2009, Wyoming issued a BART permit with emission limits to 
meet BART requirements for Dave Johnston Unit 3.\5\ In 2010, PacifiCorp 
completed emissions controls upgrades on Unit 3, including installation 
of Flue Gas Desulfurization (FGD) sulfur dioxide (SO<INF>2</INF>) 
emission controls, upgrades to the existing electrostatic precipitator 
to a baghouse for particulate matter (PM) emission controls, and 
installation of low-NO<INF>X</INF> burners with overfire air (LNB/OFA) 
for NO<INF>X</INF> emission controls. Additionally, Dave Johnston Unit 
3 was originally equipped with burners in a cell configuration until 
the 2010 upgrades when it was converted to a dry bottom wall-fired 
boiler to enable the installation of the LNB/OFA combustion controls.
---------------------------------------------------------------------------

    \3\ Email communication between the EPA and PacifiCorp. May 28, 
2026. Available in the docket for this rulemaking at Docket ID No. 
EPA-R08-OAR-2026-1651.
    \4\ Wyoming permit number MD-5098. (June 27, 2008).
    \5\ Wyoming permit number MD-6041. (December 31, 2009).
---------------------------------------------------------------------------

B. Legal Authority and Requirements

    Clean Air Act (CAA) section 169A sets forth the regional haze 
program for protecting visibility in certain national parks and 
wilderness areas, establishing ``as a national goal the prevention of 
any future, and the remedying of any existing, impairment of visibility 
in mandatory Class I Federal areas which impairment results from 
manmade air pollution.'' \6\ The EPA promulgated the Regional Haze Rule 
(RHR) to address regional haze on July 1, 1999,\7\ and published a 
revision to the RHR on January 10, 2017.\8\
---------------------------------------------------------------------------

    \6\ 42 U.S.C. 7491(a).
    \7\ 64 FR 35714 (July 1, 1999).
    \8\ 82 FR 3078 (January 10, 2017).
---------------------------------------------------------------------------

    The CAA requires each State to develop a SIP to meet various air 
quality requirements, including protection of visibility.\9\ Regional 
haze SIPs must ensure reasonable progress toward the national goal of 
achieving natural visibility conditions in Class I areas. A State must 
submit its SIP and SIP revisions to the EPA for approval.\10\ If a 
State elects not to make a required SIP submittal, fails to make a 
required SIP submittal, or if the EPA finds that a State's required 
submittal is incomplete or not approvable, then CAA section 110(c)(1) 
requires the EPA to promulgate a FIP.\11\
---------------------------------------------------------------------------

    \9\ 42 U.S.C. 7410(a), 7491, and 7492(a); CAA sections 110(a), 
169A, and 169B.
    \10\ Regional haze SIPs for the first implementation period were 
due on December 17, 2007.
    \11\ 42 U.S.C. 7410(c)(1).
---------------------------------------------------------------------------

    Under the CAA, even if the EPA establishes a FIP, a State may 
submit a SIP that, if approved by the Agency, would replace the FIP.
1. Best Available Retrofit Technology (BART)
    CAA section 169A directs States, or the EPA if developing a FIP, to 
evaluate the use of retrofit controls at certain larger stationary 
sources built between 1962 and 1977 to address visibility impacts from 
these sources.\12\ Specifically, CAA section 169A(b)(2) requires SIPs 
to contain such measures as may be necessary to make reasonable 
progress toward the natural visibility goal.\13\ This includes a 
requirement that existing major stationary sources built between 1962 
and 1977 that emit air pollutants which may reasonably be anticipated 
to cause or contribute to any impairment in a Class I area shall 
procure, install, and operate, as expeditiously as practicable, BART 
for controlling emissions from such sources for the purpose of 
eliminating or reducing any such impairment. BART is determined by the 
States through their SIPs, or by the EPA in a FIP.\14\ For fossil fuel-
fired generating powerplants having a total generating capacity in 
excess of 750 megawatts, the emission limitations required shall be 
determined pursuant to guidelines promulgated by the Administrator.\15\
---------------------------------------------------------------------------

    \12\ 42 U.S.C. 7491.
    \13\ 42 U.S.C. 7491(b)(2).
    \14\ Id.
    \15\ Id.
---------------------------------------------------------------------------

    CAA section 169A(g)(2) requires that States, or the EPA if 
developing a FIP, must consider the following five factors in making 
BART determinations: (1) the costs of compliance; (2) the energy and 
non-air quality environmental impacts of compliance; (3) any existing 
pollution control technology in use at the source; (4) the remaining 
useful life of the source; and (5) the degree of improvement in 
visibility which may reasonably be anticipated to result from the use 
of such technology. Under the RHR, States (or the EPA) are directed to 
conduct BART determinations for such ``BART-eligible'' sources that may 
reasonably be anticipated to cause or contribute to any visibility 
impairment in a Class I area.\16\
---------------------------------------------------------------------------

    \16\ 40 CFR 51.308(e).
---------------------------------------------------------------------------

    On July 6, 2005, the EPA published the Guidelines for BART 
Determinations under the RHR at appendix Y to 40

[[Page 34591]]

Code of Federal Regulations (CFR) part 51 (the ``BART Guidelines'') to 
assist States and the Agency in determining which sources should be 
subject to the BART requirements and the appropriate emission limits 
for each applicable source.<SUP>17 18</SUP> Under the BART Guidelines 
promulgated per CAA 169A(b)(2), ``States must follow the guidelines in 
making BART determinations on a source-by-source basis for 750 megawatt 
power plants but are not required to use the process under the 
guidelines when making BART determinations for other type of sources.'' 
In addition to what is required by the RHR, general SIP requirements 
mandate that the SIP or FIP include all regulatory requirements related 
to monitoring, recordkeeping, and reporting for the BART emission 
limitations.\19\
---------------------------------------------------------------------------

    \17\ 70 FR 39104 (July 6, 2005).
    \18\ In making a BART determination for a fossil fuel-fired 
electric generating plant with a total generating capacity in excess 
of 750 MW, a State must use the approach set forth in the BART 
Guidelines.
    \19\ See CAA section 110(a); 40 CFR part 51, subpart K.
---------------------------------------------------------------------------

2. Consultation With Federal Land Managers
    The RHR requires that a State, or the EPA if promulgating a FIP, 
consult with the Federal land managers (FLMs) before adopting and 
submitting a required SIP or SIP revision, or a required FIP or FIP 
revision.\20\ Further, a State, or the EPA if considering a FIP 
revision, must include in its notice to the public a summary of the 
conclusions and recommendations of the FLMs.\21\
---------------------------------------------------------------------------

    \20\ CAA section 169A(d), 40 CFR 51.308(i).
    \21\ CAA section 169A(d).
---------------------------------------------------------------------------

3. BART Guidelines Definition of Baseline Emissions
    On January 30, 2014, the EPA partially approved and partially 
disapproved a regional haze SIP revision submitted by the State of 
Wyoming on January 12, 2011 (the ``2014 Final Rule'').\22\ In the 2014 
Final Rule, the EPA limited the adjustment of baseline emissions for 
recently installed controls and stated that the baseline should only be 
adjusted in cases in which controls were installed to meet other CAA 
requirements. However, the BART Guidelines gives discretion to States 
and the EPA in setting baseline emissions and defines baseline 
emissions as a ``realistic depiction of anticipated emissions.'' 
<SUP>23 24</SUP> Additionally, the third BART statutory factor requires 
consideration of ``existing pollution control technology in use at the 
source.'' \25\ Therefore, given the language in both the statute and 
the BART Guidelines, the EPA is proposing to determine that inclusion 
of existing controls in the baseline emissions, regardless of purpose, 
is both permissible and reasonable.
---------------------------------------------------------------------------

    \22\ 79 FR 5032 (January 30, 2014).
    \23\ Since the Dave Johnston power plant is larger than 750 
megawatts, the BART Guidelines apply.
    \24\ BART Guidelines, 40 CFR part 51, appendix Y section 
IV.D.4.d.1.
    \25\ CAA section 169A(g)(2).
---------------------------------------------------------------------------

    According to the BART Guidelines, for purposes of calculating the 
costs of compliance, ``the baseline emissions rate should represent a 
realistic depiction of anticipated annual emissions for the source.'' 
\26\ The BART Guidelines allow States and the EPA to adjust baseline 
emissions to take into account projections of ``future operating 
parameters'' by making such assumptions into enforceable limits.\27\ In 
previous regional haze first planning period actions, the EPA confirmed 
that neither the RHR nor the BART Guidelines require a particular 
timeframe be used as the baseline for BART determinations at individual 
sources.\28\ Consequently, States and the EPA have considerable 
discretion in how they consider existing controls in use at a source, 
so long as that consideration is explained and reasonable.
---------------------------------------------------------------------------

    \26\ BART Guidelines, 40 CFR part 51, appendix Y section 
IV.D.4.d.1.
    \27\ BART Guidelines, 40 CFR part 51, appendix Y section 
IV.D.4.d.2.
    \28\ 77 FR 72526 (December 5, 2012); 79 FR 5104 (January 30, 
2014).
---------------------------------------------------------------------------

    In the 2014 Final Rule, the EPA did not update the baseline 
NO<INF>X</INF> emissions to account for the newly installed LNB/OFA 
combustion controls. In the EPA's responses to comments, the Agency 
explained that it would have been inappropriate for the Agency to take 
LNB/OFA into consideration, because it appeared the controls on certain 
sources in Wyoming had been installed early to avoid a more stringent 
BART determination as opposed to comply with other CAA 
requirements.\29\ Allowing for inclusion of existing controls in the 
baseline emissions, regardless of purpose, more closely aligns with the 
``consideration of any existing pollution control technology'' CAA 
requirement and the BART Guidelines requirement that the baseline 
emissions rate should represent a ``realistic depiction of annual 
emissions'' and ``in general, for the existing source subject to BART, 
you will estimate the anticipated annual emissions based upon actual 
emissions from a baseline period.'' \30\ Therefore, given the language 
in both the statute and the BART Guidelines, the EPA believes it is 
permissible and appropriate to adjust the baseline emissions rate to 
reflect existing controls at the source, regardless of purpose, despite 
the EPA declining to do so in the 2014 Final Rule.
---------------------------------------------------------------------------

    \29\ 79 FR 5105 (January 30, 2014).
    \30\ BART Guidelines, 40 CFR part 51 appendix Y section 
IV.D.4.d.
---------------------------------------------------------------------------

    In the 2014 Final Rule, the EPA also stated that the Agency's 
action would not be inconsistent with the Eighth Circuit's decision in 
North Dakota.<SUP>31 32</SUP> In the EPA's responses to comments, the 
Agency stated that the Eighth Circuit rejected the Agency's position to 
not consider the Dry Fining\TM\ control technology in use at Coal Creek 
Station in the BART evaluation (either in the cost of control options 
or adjustment to the baseline), holding that the ``EPA's refusal to 
consider Dry Fining\TM\ as an existing pollution control technology in 
use at the Coal Creek Station because it had been voluntarily installed 
was arbitrary and capricious.'' \33\ The Eighth Circuit explained that 
``any existing pollution control technology'' also included voluntarily 
installed controls.\34\ The Eighth Circuit did not opine as to how 
``existing'' must be considered and, thus, North Dakota did not 
specifically require the EPA to ``take into consideration'' the 
existing controls by adjusting the baseline emissions.\35\ However, the 
Eighth Circuit recognized that the relevance of the plain language 
requirement of the CAA to ``take into consideration'' existing 
pollution control technology in use at the source can include adjusting 
the baseline emissions to reflect existing controls.\36\
---------------------------------------------------------------------------

    \31\ 79 FR 5032 at 5103 through 5105 (January 30, 2014).
    \32\ North Dakota v. EPA, 730 F.3d 750 (8th Cir. 2013), cert. 
denied (2014).
    \33\ 79 FR 5032 at 5103 through -5105 (January 30, 2014).
    \34\ Id.
    \35\ Id.
    \36\ North Dakota v. EPA, 730 F.3d 750 (8th Cir. 2013), cert. 
denied (2014).
---------------------------------------------------------------------------

    Subsequent to the EPA's 2014 NO<INF>X</INF> BART determination for 
Dave Johnston Unit 3, the Ninth Circuit upheld the Agency's selection 
of a 2008-2010 baseline period representing the 2009 installation of 
combustion controls for a source subject-to-BART in the Agency's 2012 
FIP for Montana.\37\ Conservation organizations argued that the EPA 
should have chosen earlier periods between 2000-2004 because the source 
was not required to maintain the rate of emissions achieved between 
2008-2010, describing the changes at the source as ``unenforceable.'' 
The Ninth Circuit found that the EPA offered a reasoned response to the 
comment. Specifically,

[[Page 34592]]

the Ninth Circuit agreed with the EPA on the following: (1) the 
Agency's decision to adjust the baseline to include recently installed 
controls to meet CAA Acid Rain Program emission limits; (2) that the 
source had achieved reduced emissions using technology it has no plans 
to deactivate; and (3) that conservation organizations suggested no 
reason to believe that the source would change course and remove the 
additional combustion controls it had already installed.\38\ While the 
EPA updated the baseline in the 2012 FIP for Montana to reflect 
currently installed controls for Colstrip due to CAA acid rain 
requirements, as described above, the CAA and the BART Guidelines allow 
for adjustment of baseline to account for installed controls, 
regardless of purpose.
---------------------------------------------------------------------------

    \37\ 77 FR 57864 (September 18, 2012).
    \38\ NPCA v. EPA, 788 F.3d 1134, 1143 (9th Cir. 2015).
---------------------------------------------------------------------------

    In summary, the EPA considered the following when determining the 
baseline emissions rate for Dave Johnston Unit 3: (1) BART requires the 
consideration of any pollution control equipment in use at the source; 
\39\ (2) the BART Guidelines provide that, for purposes of calculating 
the costs of compliance, the baseline emissions rate should represent a 
realistic depiction of the anticipated annual emissions for the source; 
\40\ (3) neither the RHR nor the BART Guidelines require a particular 
timeframe be used as the baseline for BART determinations at individual 
sources; and (4) updating the baseline to reflect installation of 
additional combustion controls is consistent with case law. Thus, it is 
reasonable to interpret the BART Guidelines to allow for NO<INF>X</INF> 
emission controls that are currently in place at Dave Johnston Unit 3 
to represent the baseline emissions rate when calculating the costs of 
compliance, particularly given the fact that Dave Johnston Unit 3 has 
maintained that rate for 15 years and the emissions represent a 
realistic depiction of anticipated annual emissions.\41\
---------------------------------------------------------------------------

    \39\ CAA section 169A(g)(2); 40 CFR 51.308(e)(1)(ii)(A).
    \40\ BART Guidelines, 40 CFR part 51 appendix Y section 
IV.D.4.d.
    \41\ 2010-2025 Dave Johnston Emissions. Clean Air Markets 
Program Data (CAMPD). (April 17, 2026).
---------------------------------------------------------------------------

C. Regulatory History

    In the 2014 Final Rule, the EPA partially disapproved the Wyoming 
regional haze SIP, including the NO<INF>X</INF> BART emission limit of 
0.28 lb/MMBtu (30-day rolling average) reflecting LNB/OFA at Dave 
Johnston Unit 3, among other actions. Within the same action, the EPA 
promulgated a FIP that required a NO<INF>X</INF> BART emission limit of 
0.07 lb/MMBtu (30-day rolling average) to be implemented by March 4, 
2019 (five years from the effective date of the FIP). At PacifiCorp's 
request, the EPA also included an alternative NO<INF>X</INF> BART 
requirement of 0.28 lb/MMBtu (30-day rolling average) interim emission 
limit and permanent cessation of operations at Dave Johnston Unit 3 by 
December 31, 2027. PacifiCorp is currently operating within the 
NO<INF>X</INF> BART requirement of 0.28 lb/MMBtu interim emission limit 
and permanent cessation of operations at Dave Johnston Unit 3 on or 
before December 31, 2027.<SUP>42 43</SUP>
---------------------------------------------------------------------------

    \42\ 2020 to 2025 Dave Johnston Emissions. EPA Clean Air Markets 
Program Data (CAMPD). (March 13, 2026).
    \43\ 40 CFR 52.2636(c) and (d)(4).
---------------------------------------------------------------------------

    On March 4, 2026, PacifiCorp informed the EPA that it withdrew its 
consent to the closure of Dave Johnston Unit 3 by December 31, 
2027.\44\ In its letter, PacifiCorp explained that due to projected 
``[d]ramatic increases in electricity demand'' associated with the 
``resurgence of domestic manufacturing and the construction of 
artificial intelligence data processing centers,'' PacifiCorp's 2025 
Integrated Resource Plan (IRP) projects a need for an additional 1,000 
MW more generating capacity in the next eight years than had been 
projected in the 2019 IRP for the same time period. Accordingly, 
PacifiCorp states that it ``no longer consents to closure of [Dave 
Johnston Unit 3] and has retracted its prior request to the EPA to 
include the retirement option in the FIP.'' \45\
---------------------------------------------------------------------------

    \44\ Letter from Jayson Branch, Senior Vice President, Power 
Supply, PacifiCorp, to Cyrus Western, U.S. EPA Regional 
Administrator. (March 4, 2026).
    \45\ Id. at 3. See also comment requesting addition of 
NO<INF>X</INF> BART shutdown option with interim limit in the 2014 
Final Rule. 79 FR 5032, and 5045 (January 30, 2014).
---------------------------------------------------------------------------

III. NOX BART Determination for Dave Johnston Unit 3

A. Costs of Compliance

    In the 2014 Final Rule, the EPA relied on a number of emissions and 
control cost assumptions for Dave Johnston Unit 3. To provide cost 
information that is consistent with the original FIP, the EPA generally 
relied on the same control costs assumptions used in the 2014 Final 
Rule to re-analyze the prior control scenarios at Dave Johnston Unit 3. 
This allows for a direct comparison between the current cost 
assumptions and other BART analyses from that same time period.
    In the 2014 Final Rule, the EPA relied on baseline pre-combustion 
control NO<INF>X</INF> emissions of 4,913 tons per year (tpy), based on 
the actual annual average of NO<INF>X</INF> emissions for the years 
2001-2003, as the baseline emissions.\46\ However, for this current 
analysis, and as previously described, the EPA is reconsidering the 
baseline emissions assumptions. As noted earlier, in 2010, PacifiCorp 
installed LNB/OFA combustion controls on Dave Johnston Unit 3, and 
those controls are permanent and have now been operating for over 15 
years. Therefore, based on the third BART statutory factor, ``pollution 
equipment in use at the source,'' \47\ the EPA is adjusting the 
baseline to reflect the pollution equipment installed at Dave Johnston 
Unit 3. Additionally, in selecting a baseline emissions period, the 
BART Guidelines state that the baseline should ``represent(s) a 
realistic depiction of anticipated emissions for the source.'' \48\ 
Therefore, in selecting baseline emissions for this revised BART 
analysis, a baseline that includes operation of LNB/OFA combustion 
controls represents both ``pollution equipment in use at the source'' 
and ``represent(s) a realistic depiction of anticipated emissions for 
the source.'' \49\
---------------------------------------------------------------------------

    \46\ Wyoming EGU BART and Reasonable Progress Costs (79 FR 5039; 
October 28, 2013).
    \47\ CAA section 169A(g)(2).
    \48\ BART Guidelines, 40 CFR part 51 appendix Y section 
IV.D.4.d.1.
    \49\ CAA section 169A(g)(2); BART Guidelines, 40 CFR part 51 
appendix Y section IV.D.4.d.1.
---------------------------------------------------------------------------

    Since LNB/OFA was installed in 2010, the EPA is using the period of 
operation immediately following the LNB/OFA installation as the updated 
baseline period for the revised BART analysis. Dave Johnston Unit 3 
achieved an actual NO<INF>X</INF> emission rate of 0.22 lb/MMBtu 
(annual average) for the years 2011, 2012, and the first two quarters 
of 2013,\50\ which reduced NO<INF>X</INF> emissions by 2,837 tpy and 
resulted in post-combustion control baseline NO<INF>X</INF> emissions 
of 2,076 tpy.\51\ Based on the current boiler configuration, PacifiCorp 
provided information that LNB/OFA has consistently achieved an emission 
limit of 0.23 lb/MMBtu (30-day rolling average) since installation in 
2010.\52\ Therefore, for purposes of calculating the costs of 
compliance, the EPA's revised NO<INF>X</INF> BART determination for 
Dave Johnston Unit 3 uses the post-combustion control baseline of 2,076 
tpy. As explained above, this baseline is

[[Page 34593]]

consistent with the demonstrated actual NO<INF>X</INF> emissions from 
the installation of LNB/OFA in 2010 continuing through present day 
(over a 15-year period) and is consistent with both the CAA statutory 
factor(s) and the BART Guidelines.
---------------------------------------------------------------------------

    \50\ These time periods reflect the emission data available 
following the installation of LNB/OFA and prior to the finalization 
of the 2014 Final Rule in January 2014.
    \51\ Wyoming EGU BART and Reasonable Progress Costs. `Emissions' 
worksheet (79 FR 5039; October 28, 2013).
    \52\ Letter from Jayson Branch, Senior Vice President, Power 
Supply, PacifiCorp, to Cyrus Western, U.S. EPA Regional 
Administrator at 12. (March 4, 2026).
---------------------------------------------------------------------------

    The next step in determining BART is to identify all available 
retrofit control technologies and eliminate technically infeasible 
options. As determined in the 2014 Final Rule, selective non-catalytic 
reduction (SNCR) and selective catalytic reduction (SCR) are the 
primary available post-combustion retrofit technologies for the Dave 
Johnston Unit 3 boiler, and both technologies were determined to be 
feasible, which are not being challenged currently. The next step is to 
evaluate the control effectiveness of the feasible control 
technologies. To calculate the potential NO<INF>X</INF> emissions 
reductions for the SNCR and SCR scenarios, the EPA used a 
NO<INF>X</INF> emission rate assumption of 0.16 lb/MMBtu (annual 
average) for SNCR and 0.05 lb/MMBtu (annual average) for SCR.\53\ The 
emission reductions associated with the installation of SNCR reflect a 
control efficiency of 25 percent and would potentially reduce 
NO<INF>X</INF> emissions by only 519 tpy compared to the post-
combustion control baseline NO<INF>X</INF> emissions of 2,076 tpy. The 
emission reductions associated with the installation of SCR reflect a 
control efficiency of 77 percent and would potentially reduce 
NO<INF>X</INF> emissions by 1,597 tpy compared to the post-control 
baseline NO<INF>X</INF> emissions of 2,076 tpy. Based on these 
assumptions, the annualized costs to install SNCR and SCR using a 20-
year equipment life were found to be $1,810,782 per year and $9,980,337 
per year, respectively, as compared to the pre-combustion control 
annualized costs of $3,510,589 per year and $11,680,144 per year to 
install LNB/OFA + SNCR and LNB/OFA + SCR, respectively.\54\ The current 
version of the EPA's Control Cost Manual (revised in 2014) includes a 
30-year equipment life for SCR.\55\ Therefore, the EPA also calculated 
the annualized costs to install SCR using a 30-year equipment life to 
be $8,862,953 per year. Thus, the average cost-effectiveness for SNCR, 
SCR (20-year life), and SCR (30-year life) are $3,488 per ton, $6,251 
per ton, and $5,551 per ton, respectively. The incremental cost-
effectiveness \56\ of installing SCR compared to an SNCR is $7,583 per 
ton for SCR (20-year life) and $6,602 per ton for SCR (30-year life). 
Costs of compliance for Dave Johnston Unit 3 NO<INF>X</INF> BART are 
summarized in table 1.\57\
---------------------------------------------------------------------------

    \53\ In the 2014 Final Rule, the EPA estimated the 
NO<INF>X</INF> reduction from SNCR for Dave Johnston to be 
approximately 25 percent of the initial NO<INF>X</INF> rate of 0.22 
lb/MMBtu (annual average) based on review of similar units (78 FR 
34748). Per the EPA's Control Cost Manual, a 0.05 lb/MMBtu (annual 
average) should be obtainable by a power plant boiler with an SCR 
system. (EPA, Cost Control Manual. Section 4, Chapter 2, June 2019, 
page 57, available at <a href="https://www.epa.gov/sites/default/files/2017-12/documents/scrcostmanualchapter7thedition_2016revisions2017.pdf">https://www.epa.gov/sites/default/files/2017-12/documents/scrcostmanualchapter7thedition_2016revisions2017.pdf</a>.
    \54\ Wyoming EGU BART and Reasonable Progress Costs. (79 FR 
5039; October 28, 2013).
    \55\ U.S. Environmental Protection Agency. Cost Control Manual. 
Section 4, Chapter 2, June 2019, page 80, available at <a href="https://www.epa.gov/sites/default/files/2017-12/documents/scrcostmanualchapter7thedition_2016revisions2017.pdf">https://www.epa.gov/sites/default/files/2017-12/documents/scrcostmanualchapter7thedition_2016revisions2017.pdf</a>.
    \56\ The incremental cost effectiveness calculation compares the 
costs and performance level of a control option to the costs and 
performance level of the next most stringent option. BART 
Guidelines, 40 CFR part 51 appendix Y.
    \57\ Wyoming EGU BART and Reasonable Progress Costs. (79 FR 
5039; October 28, 2013).

                         Table 1--Summary of Dave Johnston Unit 3 NOX BART Cost Analysis
----------------------------------------------------------------------------------------------------------------
                              Emission rate (lb/   Emission                   Average cost-    Incremental  cost-
     Control technology         MMBtu; annual      reduction    Annualized  effectiveness ($/  effectiveness ($/
                                   average)       (tons/year)     costs            ton)               ton)
----------------------------------------------------------------------------------------------------------------
Baseline (LNB/OFA)..........               0.22           N/A          N/A                N/A                N/A
SNCR........................               0.16           519   $1,810,782             $3,488  .................
SCR (20-year life)..........               0.05         1,597    9,980,337              6,251             $7,583
SCR (30-year life)..........               0.05         1,597    8,862,953              5,551              6,602
----------------------------------------------------------------------------------------------------------------

    Notably, the EPA's NO<INF>X</INF> BART determination relies on the 
baseline NO<INF>X</INF> rate of 0.22 lb/MMBtu (annual average) 
contained in the 2014 Final Rule as opposed to the proposed 0.23 lb/
MMBtu (30-day rolling average) NO<INF>X</INF> emission limit. 
Generally, the NO<INF>X</INF> annual average emission rate is based on 
the expected annual emission performance under a 30-day rolling average 
emission rate. The latter value will be higher than the former because 
of the shorter averaging period and a margin for compliance. For 
example, Dave Johnston Unit 3 is generally able to achieve a 30-day 
rolling average NO<INF>X</INF> emission rate of 0.23 lb/MMBtu and an 
annual average emission rate of between 0.20 to 0.21 lb/MMBtu.\58\ 
Thus, the proposed 0.23 lb/MMBtu (30-day rolling average) reflects a 
more conservative annual NO<INF>X</INF> emission rate than the 0.22 lb/
MMBtu (annual average) that was used in the 2014 Final Rule and in this 
proposed revision for purposes of calculating the costs of compliance 
contained in table 1.
---------------------------------------------------------------------------

    \58\ 2020-2025 Dave Johnston Emissions, Clean Air Markets 
Program Data (CAMPD) (March 13, 2026).
---------------------------------------------------------------------------

    As described in section III.E of this preamble and consistent with 
other BART actions, the EPA proposes to find that neither SNCR nor SCR 
are cost effective when compared to the associated visibility 
improvement.

B. Energy and Non-Air Quality Environmental Impacts of Compliance

    In its March 2026 letter to the EPA withdrawing its consent to the 
closure of Dave Johnston Unit 3, PacifiCorp noted the recent increase 
in energy demand. Specifically, PacifiCorp noted that the North 
American Electric Reliability Corporation's (NERC) 2024 Long-Term 
Reliability Assessment, which includes Wyoming and other western 
States, describes the need for replacement of five gigawatts of 
baseload resource retirements, anticipated between 2024 and 2028 in the 
region.\59\
---------------------------------------------------------------------------

    \59\ North American Electric Reliability Corporation. 2024 Long-
Term Reliability Assessment at 128. (December 2024).
---------------------------------------------------------------------------

    PacifiCorp's 2025 IRP projects increasing system-wide retail sales 
with a compounded annual growth rate of 2.17 percent between 2024 and 
2033 and a compounded annual growth rate of 1.35 percent between 2024 
and 2042, which reflects a noticeable increase in forecasted growth 
from previous forecasts.<SUP>60 61</SUP> According to PacifiCorp's 2025 
IRP, growth is driven, in part, by ``significant new data center loads

[[Page 34594]]

coming online in the 2027-2033 timeframe.'' \62\
---------------------------------------------------------------------------

    \60\ PacifiCorp 2025 Integrated Resource Plan, Appendix A. 
(January 30, 2026).
    \61\ Letter from Jayson Branch, Senior Vice President, Power 
Supply, PacifiCorp, to Cyrus Western, U.S. EPA Regional 
Administrator at 8. (March 4, 2026).
    \62\ PacifiCorp 2025 Integrated Resource Plan at 6. (March 31, 
2025).
---------------------------------------------------------------------------

    PacifiCorp states that Dave Johnston Unit 3 is ``uniquely poised to 
respond to these growing demand needs'' because, in part, it has an 
operating range of 90-220 MW of dispatchable generation that allows 
Unit 3 to generate more or less power to respond to changes in energy 
demand, including accommodating intermittent wind generation.\63\ 
Additionally, Dave Johnston Unit 3 also provides frequency response--an 
automatic, rapid adjustment of power output to stabilize grid 
frequency--making it ``uniquely capable of offsetting unanticipated 
reductions in wind generation,'' according to PacifiCorp.\64\
---------------------------------------------------------------------------

    \63\ Letter from Jayson Branch, Senior Vice President, Power 
Supply, PacifiCorp, to Cyrus Western, U.S. EPA Regional 
Administrator at 9. (March 4, 2026).
    \64\ Id.
---------------------------------------------------------------------------

    The EPA recognizes that any source that previously decided to close 
could determine in the future that closure is no longer appropriate. As 
PacifiCorp notes in its March 2026 letter to the EPA, the demand for 
electricity is rising. Executive Order 14261, Reinvigorating America's 
Beautiful Clean Coal Industry and Amending Executive Order 14241, 
states that ``[o]ur Nations' beautiful clean coal resources will be 
critical to meeting the rise in electricity demand due to the 
resurgence of domestic manufacturing and the construction of artificial 
intelligence data processing centers'' and power generated from coal 
resources is critical to addressing this surging demand and a matter of 
national interest, national security, and energy policy.\65\
---------------------------------------------------------------------------

    \65\ Executive Order 14261, Reinvigorating America's Beautiful 
Clean Coal Industry and Amending Executive Order 14241, 90 FR 15517 
(April 14, 2025). <a href="https://www.whitehouse.gov/presidential-actions/2025/04/reinvigorating-americas-beautiful-clean-coal-industry-and-amending-executive-order-14241/">https://www.whitehouse.gov/presidential-actions/2025/04/reinvigorating-americas-beautiful-clean-coal-industry-and-amending-executive-order-14241/</a>.
---------------------------------------------------------------------------

    The EPA does not encourage electric generating facilities to close 
in the face of this energy demand. Moreover, the EPA does not expect an 
electrical generating facility to close in order to comply with the 
CAA's regional haze requirements. Voluntary source retirement and 
replacement is much different from enforceable, unconsented closures, 
which neither the RHR nor the CAA's regional haze provisions reference 
or contemplate in any manner. Furthermore, the EPA is unaware of any 
instance where the Agency has approved a SIP revision containing a 
forced, unconsented closure. Finally, although there are identified 
energy impacts from potential emission controls (e.g., parasitic energy 
requirements to operate SCR), the EPA did not identify any ``energy and 
non-air quality environmental impacts of compliance'' that would 
preclude the selection of any of the emission controls evaluated.

C. Pollution Control Equipment in Use at the Source

    Dave Johnston Unit 3 currently employs LNB/OFA for control of 
NO<INF>X</INF> emissions, which was installed in 2010. As part of the 
installation of LNB/OFA, PacifiCorp converted the boiler configuration 
from a cell boiler to a dry-bottom wall-fired configuration.\66\ Based 
on the current boiler configuration, PacifiCorp provided information 
from the EPA's Clean Air Markets Program Data (CAMPD) that LNB/OFA has 
consistently achieved an emission limit of 0.23 lb/MMBtu (30-day 
rolling average) since installation in 2010.\67\
---------------------------------------------------------------------------

    \66\ Id.
    \67\ Id.
---------------------------------------------------------------------------

    As previously stated, the EPA accounted for the ``pollution 
equipment in use at the source'' in the Agency's adjustment of the 
baseline to reflect the pollution equipment currently installed. In 
doing so, the EPA finds that the Agency's proposed BART determination 
for Dave Johnston Unit 3, as described in section III of this preamble, 
is consistent with the Ninth Circuit's decision. Dave Johnston Unit 3 
has achieved NO<INF>X</INF> emission reductions using technology (LNB/
OFA) that it has no plans to deactivate. Additionally, there is no 
reason to believe that PacifiCorp would remove the combustion controls 
it has already installed, given that PacifiCorp received a Wyoming 2008 
construction permit to construct those control technologies.\68\ This 
is further demonstrated by Dave Johnston Unit 3 maintaining its 
existing NO<INF>X</INF> emissions close to 0.23 lb/MMBtu (30-day 
rolling average) for the last 15 years since its installation of LNB/
OFA.\69\ If this proposed rule is finalized as proposed, Dave Johnston 
Unit 3 would be required to continue to meet a 0.23 lb/MMBtu (30-day 
rolling average) NO<INF>X</INF> emission limit by the compliance date.
---------------------------------------------------------------------------

    \68\ Wyoming permit number MD-5098. (June 27, 2008).
    \69\ 2010-2025 Dave Johnston Emissions. CAMPD. (April 17, 2026).
---------------------------------------------------------------------------

D. Remaining Useful Life of the Source

    With this proposed action, the EPA is proposing to withdraw the 
requirement to permanently close Dave Johnston Unit 3 by December 31, 
2027, because the source no longer consents to closure.\70\ As 
previously stated in section III.B of this preamble, the EPA does not 
expect an electrical generating facility to close in order to comply 
with the CAA's regional haze requirements. Thus, because the proposal 
removes the enforceable closure for Dave Johnston Unit 3, the remaining 
useful life is based on the useful life of the control equipment.\71\ 
Therefore, for the remaining useful life for evaluation of controls 
consistent with the Control Cost Manual, the BART Guidelines, and the 
2014 Final Rule, the EPA evaluated both 20-years (for SNCR and SCR) and 
30-years (for SCR).\72\ Those 20-year and/or 30-year lifetime of the 
emission controls assumptions are accounted for in the cost 
calculations for both SNCR and SCR controls.
---------------------------------------------------------------------------

    \70\ See section II.C of this preamble.
    \71\ BART Guidelines, 40 CFR part 51 appendix Y section 
IV.D.4.k.
    \72\ U.S. Environmental Protection Agency. Control Cost Manual. 
Available at <a href="https://www.epa.gov/sites/default/files/2017-12/documents/scrcostmanualchapter7thedition_2016revisions2017.pdf">https://www.epa.gov/sites/default/files/2017-12/documents/scrcostmanualchapter7thedition_2016revisions2017.pdf</a>; BART 
Guidelines, 40 CFR part 51 appendix Y; 79 FR 5032 (January 30, 
2014).
---------------------------------------------------------------------------

E. Degree of Improvement in Visibility

    The EPA relied on CALPUFF \73\ used in the 2014 Final Rule \74\ and 
adjusted the baseline to reflect the inclusion of the pollution control 
equipment in use at the source (LNB/OFA) when determining visibility 
improvement. The 2014 model included visibility impacts from Dave 
Johnston Unit 3 to Badlands National Park, Wind Cave National Park, 
Mount Zirkel Wilderness Area, Rawah Wilderness Area, and Rocky Mountain 
National Park. The modeling indicated that visibility impact was 
greatest at Wind Cave National Park. The visibility improvement (delta 
deciviews) for Dave Johnston Unit 3 with LNB/OFA as baseline controls 
is summarized in table 2.\75\
---------------------------------------------------------------------------

    \73\ CALPUFF is a multi-layer, multi-species non-steady state 
puff dispersion model that simulates the effects of time and space 
varying meteorological conditions on pollution transport, 
transformation, and removal. <a href="https://www.epa.gov/scram/air-quality-dispersion-modeling-alternative-models">https://www.epa.gov/scram/air-quality-dispersion-modeling-alternative-models</a>.
    \74\ Modeling in the 2014 Final Rule predicted visibility 
improvement for each emissions control technology at each of the 
Class I areas that the EPA modeled in the Agency's analysis of the 
Dave Johnston power plant.
    \75\ Air Quality Modeling Protocol. Wyoming Regional Haze 
Federal Implementation Plan. (79 FR 5039; January 2014).

[[Page 34595]]



                                          Table 2--Summary of Dave Johnston Unit 3 NOX BART Visibility Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                   Wind Cave         Badlands      Rocky Mountain    Rawah Wilderness     Mount Zirkel
                      Control technology                         National Park    National Park     National Park          Area         Wilderness Area
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                     Visibility improvement (delta deciview for the maximum 98th percentile impact)
--------------------------------------------------------------------------------------------------------------------------------------------------------
SNCR..........................................................             0.06             0.06              0.03               0.05               0.02
SCR...........................................................             0.18             0.17              0.10               0.14               0.06
--------------------------------------------------------------------------------------------------------------------------------------------------------

    While all five BART statutory factors must be considered when 
determining BART, the average cost-effectiveness value is weighed 
against the expected visibility improvement from the controls to 
determine if the potential control is overall ``cost-effective.'' 
Additionally, to promote consistency, the facts of each BART decision 
can be compared to previous BART decisions by both States and the EPA. 
As shown in table 1, the EPA evaluated NO<INF>X</INF> emission 
controls, SNCR and SCR, from the baseline reflecting the currently 
installed LNB/OFA emission controls.
    First, the EPA evaluated SNCR as a potential BART control. For Dave 
Johnston Unit 3, the average cost-effectiveness associated with the 
installation of SNCR is $3,488 per ton with an associated visibility 
improvement of only 0.06 deciviews. This is similar to the installation 
of SNCR on Colorado's Comanche Unit 1 for which the average cost-
effectiveness was $3,644 per ton with an associated visibility 
improvement of 0.11 deciviews. In 2012, the EPA agreed with Colorado 
that based on its consideration of the five factors, the NO<INF>X</INF> 
BART emission limit for Comanche Unit 1, a tangentially fired 
boiler,\76\ is 0.20 lb/MMBtu (30-day rolling average)--and not SNCR--
which can be achieved through the operation of existing LNBs.\77\ 
Although other alternatives, including SNCR, achieve more emission 
reductions, Colorado determined, and the EPA agreed, that the added 
expense of achieving lower limits through different controls was not 
reasonable based on the ``high cost effectiveness coupled with the low-
visibility (under 0.20 deciview) afforded.'' \78\ Here, the average 
cost-effectiveness value is similar, but the visibility benefit from 
the addition of SNCR is half as much, at only 0.06 deciviews. 
Similarly, in the 2014 Final Rule, the EPA found it unreasonable to 
require SNCR on Naughton Units 1 and 2 due to the ``very low'' 
incremental visibility improvement of 0.10 deciviews across both units 
(0.04 deciviews for Unit 1; 0.06 deciviews for Unit 2).\79\ Therefore, 
this proposed action is consistent with historical BART decisions on 
sources for which controls were found not to be BART due to the very 
small visibility benefits of installing controls.
---------------------------------------------------------------------------

    \76\ 77 FR 18065 (March 26, 2012).
    \77\ 77 FR 76871 (December 31, 2012).
    \78\ 77 FR 18066 (March 26, 2012).
    \79\ 79 FR 5050 (January 30, 2014).
---------------------------------------------------------------------------

    Next, the EPA evaluated SCR as a potential control. For Dave 
Johnston Unit 3, the installation of SCR would result in a modest 
increase in visibility improvement of 0.12 deciviews compared to SNCR 
and 0.18 deciviews compared to the LNB/OFA baseline with an average 
cost-effectiveness of $6,251 per ton (20-year life) and $5,551 per ton 
(30-year life). In this case, the cost-effectiveness of SCR is similar 
to the installation of SCR on Colorado's Martin Drake Units 5, 6, and 7 
of $7,314 per ton, $5,395 per ton, and $4,981 per ton, respectively. In 
2012, the EPA agreed with Colorado that SCR was not cost effective on 
Martin Drake Units 5, 6, and 7 when compared with the associated 
visibility improvement of 0.12 deciviews, 0.27 deciviews, and 0.37 
deciviews, respectively.\80\ Similarly, the EPA also determined that 
Colorado reasonably considered the five BART statutory factors when 
Colorado determined SCR was not reasonable at Craig Units 1 and 2 due 
to the ``high cost-effectiveness value[s]'' of $6,432 per ton and 
$6,299 per ton, respectively, despite an associated visibility 
improvement of 1.01 deciviews for each unit.\81\ The cost-effectiveness 
values at Craig Units 1 and 2 are almost identical to the cost-
effectiveness of the installation of SCR at Dave Johnston Unit 3 at 
$6,251 per ton (using the same 20-year amortization period as 
Colorado), while the associated visibility improvement is significantly 
less at Dave Johnston Unit 3 at only 0.18 deciviews. Again, the average 
cost-effectiveness of SCR for Dave Johnston Unit 3 is similar to the 
average cost-effectiveness at other BART sources for which the EPA 
determined SCR was not cost effective, and the potential visibility 
benefit from SCR at Dave Johnston Unit 3 is considerably smaller than 
at these same BART sources. In conclusion, based on considering the 
average cost-effectiveness and expected visibility improvement, the EPA 
finds that neither SNCR nor SCR are reasonable.
---------------------------------------------------------------------------

    \80\ 77 FR 76871 (December 31, 2012).
    \81\ 77 FR 18068 (March 26, 2012).
---------------------------------------------------------------------------

F. Conclusion

    Based on the EPA's consideration of the CAA and BART Guidelines and 
evaluation of the five BART factors (cost of controls, predicted 
visibility improvement, energy and non-air quality environmental 
impacts of compliance, pollution control currently in use, and 
remaining useful life), the Agency proposes to find that a 
NO<INF>X</INF> emission limit of 0.23 lb/MMBtu (30-day rolling 
average), consistent with the continued operation of LNB/OFA combustion 
controls, is NO<INF>X</INF> BART for Dave Johnston Unit 3. The proposed 
emission limit is consistent with a rate that Dave Johnston Unit 3 has 
consistently achieved since installation of the LNB/OFA and is equal to 
the presumptive NO<INF>X</INF> BART limit for a dry-bottom, wall-fired 
boiler burning sub-bituminous coal in the BART Guidelines.\82\ 
Additionally, PacifiCorp recently submitted a permit application to 
Wyoming requesting a revised NO<INF>X</INF> emission limit for Dave 
Johnston Unit 3 of 0.23 lb/MMBtu based on a 30-day rolling average.\83\ 
To ensure uninterrupted implementation of NO<INF>X</INF> BART at Dave 
Johnston Unit 3, and because Unit 3 can already meet the proposed limit 
without any upgrades or changes in operation, the EPA proposes to 
require compliance upon the effective date of the final rule.\84\
---------------------------------------------------------------------------

    \82\ BART Guidelines, 40 CFR part 51 appendix Y, table 1. 
Presumptive NO<INF>X</INF> Emission Limits for BART-Eligible Coal-
Fired Units.
    \83\ Letter from Jayson Branch, Senior Vice President, Power 
Supply, PacifiCorp, to Cyrus Western, U.S. EPA Regional 
Administrator, Attachment 2 at 15. (March 4, 2026).
    \84\ The effective date of the final rule will be 30 days after 
publication in the Federal Register.
---------------------------------------------------------------------------

IV. Coordination With FLMs

    There are seven Class I areas in the State of Wyoming. The U.S. 
Forest Service (USFS) manages the Bridger Wilderness, Fitzpatrick 
Wilderness, North Absaroka Wilderness, Teton Wilderness, and the 
Washakie Wilderness. The U.S. National Park

[[Page 34596]]

Service manages the Grand Teton National Park and Yellowstone National 
Park.
    There are obligations to consult on the plan revisions under CAA 
section 169A(d) and associated regulations found at 40 CFR 51.308(i). 
Thus, the EPA consulted with the USFS, the U.S. Fish and Wildlife 
Service, and the U.S. National Park Service on the proposed FIP 
revision. The EPA described the proposed revisions with the USFS, the 
Fish and Wildlife Service, and the National Park Service on April 13, 
2026, and provided a summary of the conclusions and recommendations of 
the FLMs along with a description of how the Agency addressed the 
comments in the docket for this action.\85\ Therefore, the EPA met the 
obligations under 40 CFR 51.308(i)(2) and (3) and CAA 169A(d).
---------------------------------------------------------------------------

    \85\ Summary of FLM Conclusions and Recommendations and How the 
EPA Addressed the Comments. (May 2026). Available in the docket for 
this rulemaking at Docket ID No. EPA-R08-OAR-2026-1651.
---------------------------------------------------------------------------

V. Clean Air Act Section 110(l)

    Under CAA section 110(l), the EPA cannot approve a plan revision 
``if the revision would interfere with any applicable requirement 
concerning attainment and reasonable further progress (as defined in 
section 7501 of this title), or any other appliable requirement of this 
chapter.'' \86\ The EPA proposes to find that these revisions satisfy 
section 110(l). The previous section of this preamble explains how the 
proposed FIP revision will comply with applicable regional haze 
requirements and general implementation plan requirements such as 
enforceability. With respect to requirements concerning attainment and 
reasonable further progress, the FIP, as revised by this action, will 
not result in an increase in emissions compared to historical levels. 
In addition, the area where the Dave Johnston power plant is located is 
in attainment for all National Ambient Air Quality Standards (NAAQS). 
Thus, the revision will ensure no increases in NO<INF>X</INF> emissions 
compared to historical levels in an area that has not been designated 
nonattainment for any NAAQS.
---------------------------------------------------------------------------

    \86\ Note that ``reasonable further progress'' as used in CAA 
section 110(l) is a reference to that term as defined in section 
301(a) (i.e., 42 U.S.C. 7501(a)), and as such means reductions 
required to attain the National Ambient Air Quality Standards 
(NAAQS) set for criteria pollutants under CAA section 109. This term 
as used in CAA section 110(l) (and defined in CAA section 301(a)) is 
not synonymous with ``reasonable progress'' as that term is used in 
the regional haze program. Instead, CAA section 110(l) provides that 
the EPA cannot approve plan revisions that interfere with regional 
haze requirements (including reasonable progress requirements) 
insofar as they are ``other applicable requirement[s]'' of the CAA.
---------------------------------------------------------------------------

VI. Statutory and Executive Order Reviews

A. Executive Order 12866: Regulatory Planning and Review

    This action is not a significant regulatory action and was 
therefore not submitted to the Office of Management and Budget (OMB) 
for review.

B. Executive Order 14192: Unleashing Prosperity Through Deregulation

    This action is expected to be an Executive Order 14192 deregulatory 
action. This proposed rule is expected to provide burden reduction by 
revising the NO<INF>X</INF> BART determination for, and not requiring 
the contested closure of, Dave Johnston Unit 3.

C. Paperwork Reduction Act (PRA)

    This proposed rule does not impose an information collection burden 
under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 
3501 et seq.).

D. Regulatory Flexibility Act (RFA)

    I certify that this action will not have a significant economic 
impact on a substantial number of small entities under the RFA (5 
U.S.C. 601 et seq.). This action will not impose any requirements on 
small entities. This action will establish an emission limit for one 
electric generating unit. This unit is not owned by a small entity, and 
therefore, there are no impacts on small entities.

E. Unfunded Mandates Reform Act (UMRA)

    This action does not contain any unfunded mandate as described in 
UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect 
small governments. The action imposes no enforceable duty on any State, 
local, or Tribal governments or the private sector.

F. Executive Order 13132: Federalism

    This action does not have federalism implications as it revises an 
already existing FIP. It will not have substantial direct effects on 
the States, on the relationship between the national government and the 
States, or on the distribution of power and responsibilities among the 
various levels of government.

G. Executive Order 13175: Consultation and Coordination With Indian 
Tribal Governments

    This proposed rule does not have Tribal implications, as specified 
in Executive Order 13175. It will not have substantial direct effects 
on Tribal governments. Thus, Executive Order 13175 does not apply to 
this proposed rule.

H. Executive Order 13045: Protection of Children From Environmental 
Health and Safety Risks

    This action is not subject to Executive Order 13045 because it is 
not 3(f)(1) significant as defined in Executive Order 12866, and 
because the EPA does not believe the environmental health or safety 
risks addressed by this action present a disproportionate risk to 
children.

I. Executive Order 13211: Actions That Significantly Affect Energy 
Supply, Distribution, or Use

    This action is not subject to Executive Order 13211 because it is 
not a significant regulatory action under Executive Order 12866. This 
action will not have a significant adverse effect on the supply, 
distribution, or use of energy as, if finalized, it would result in 
additional electricity generation remaining on the grid.

J. National Technology Transfer Advancement Act

    This rulemaking does not involve technical standards.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Ammonia, Carbon 
oxides, Incorporation by reference, Intergovernmental relations, Lead, 
Nitrogen oxides, Ozone, Particulate matter, Reporting and recordkeeping 
requirements, Sulfur oxides, Volatile organic compounds.

    Authority:  42 U.S.C. 7401 et seq.

Lee Zeldin,
EPA Administrator.

    For the reasons stated in the preamble, the Environmental 
Protection Agency is proposing to amend 40 CFR part 52 as follows:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority:  42 U.S.C. 7401 et seq.

Subpart ZZ--Wyoming

0
2. In Sec.  52.2636:
0
a. Table 2 in paragraph (c)(1) is amended by:
0
i. Revising the entry ``PacifiCorp Dave Johnston Unit 3'';
0
ii. Adding footnote ``5'' in numerical order; and

[[Page 34597]]

0
iii. Removing footnote ``*''; and
0
b. Removing paragraph (d)(4).
    The revisions and additions read as follows:


Sec.  52.2636   Implementation plan for regional haze.

* * * * *
    (c) * * *

Table 2 to Sec.   52.2636 [Emission Limits and Required Control Technologies for BART Units for Which the EPA Disapproved the State's BART Determination
                                                                 and Implemented a FIP]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                          SO2 emission limit--lb/MMBtu
                    Source name/BART unit                       NOX required control  NOX emission limit--lb/MMBtu (30-  (averaged annually across Units
                                                                     technology             day rolling average)                    1 and 2)
--------------------------------------------------------------------------------------------------------------------------------------------------------
 
                                                                      * * * * * * *
PacifiCorp Dave Johnston Unit 3..............................                   N/A                          0.23 \5\                               N/A
 
                                                                      * * * * * * *
--------------------------------------------------------------------------------------------------------------------------------------------------------
 \5\ By [DATE 30 DAYS AFTER DATE OF PUBLICATION OF FINAL RULE].

* * * * *
[FR Doc. 2026-11436 Filed 6-5-26; 8:45 am]
BILLING CODE 6560-50-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>