Skip to main content
Notice2026-10988

Southern California Edison Company; Notice of Application Accepted for Filing With the Commission, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations and Preliminary Fishway Prescriptions

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
June 2, 2026

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 105 (Tuesday, June 2, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 105 (Tuesday, June 2, 2026)]
[Notices]
[Pages 32968-32969]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-10988]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1388-082]


Southern California Edison Company; Notice of Application 
Accepted for Filing With the Commission, Soliciting Motions To 
Intervene and Protests, Ready for Environmental Analysis, and 
Soliciting Comments, Terms and Conditions, Recommendations and 
Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New major license.
    b. Project No.: 1388-082.
    c. Date filed: January 29, 2025.
    d. Applicant: Southern California Edison Company.
    e. Name of Project: Lee Vining Hydroelectric Project.
    f. Location: The existing project is located on both Lee Vining and 
Glacier Creeks in Inyo County, California, near the town of Lee Vining. 
The project affects 536 acres of federal land managed by the U.S. 
Forest Service.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Wayne Allen, Principal Manager, Southern 
California Edison Company, 2244 Walnut Grove Avenue, Rosemead, CA 
91770; Telephone (626) 302-9741 or email <a href="/cdn-cgi/l/email-protection#ddaabca4b3b8bcb1b1b8b39daebeb8f3beb2b0"><span class="__cf_email__" data-cfemail="c7b0a6bea9a2a6ababa2a987b4a4a2e9a4a8aa">[email&#160;protected]</span></a>.
    i. FERC Contact: Rebecca Kipp, (202) 502-8846 or 
<a href="/cdn-cgi/l/email-protection#2f5d4a4d4a4c4c4e0144465f5f6f494a5d4c01484059"><span class="__cf_email__" data-cfemail="ea988f888f89898bc481839a9aaa8c8f9889c48d859c">[email&#160;protected]</span></a>.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, terms and conditions, and prescriptions: on or before 
5:00 p.m. Eastern Time on July 27, 2026; reply comments are due on or 
before 5:00 p.m. Eastern Time on September 10, 2026.
    The Commission strongly encourages electronic filing. Please file 
file motions to intervene and protests, comments, recommendations, 
terms and conditions, and prescriptions using the Commission's eFiling 
system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can 
submit brief comments up to 10,000 characters, without prior 
registration, using the eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please contact FERC Online Support 
at <a href="/cdn-cgi/l/email-protection#fabcbfa8b9b5949693949fa98f8a8a95888eba9c9f8899d49d958c"><span class="__cf_email__" data-cfemail="7d3b382f3e3213111413182e080d0d120f093d1b180f1e531a120b">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
via U.S. Postal Service to: Debbie-Anne A. Reese, Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, 
DC 20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any 
filing should include docket number P-1388-082.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is ready for 
environmental analysis.
    l. The existing Lee Vining Hydroelectric Project consists of four 
dams and three reservoirs including: (1) the 600-foot-long, 45-foot-
high redwood-faced rockfill Saddlebag Dam with: (a) a 54-foot-wide, 
4.5-foot-deep rectangular notch spillway that discharges directly into 
Lee Vining Creek below the dam, (b) a 297-acre Saddlebag Lake 
impoundment with 9,495 acre-feet net storage capacity at 10,089.40 feet 
above mean sea level elevation (msl), (c) a 220-foot-long, 30-inch-
diameter riveted steel pipeline to extend the outlet downstream of the 
dam, and (d) a low-level outlet works with maximum discharge capacity 
of about 150 cubic feet per second (cfs) that discharge directly into 
Lee Vining Creek and consists of: (i) a fully submerged, ungated, 
concrete intake box at 10,048.8 feet msl located at upstream toe of the 
dam that admits water to (ii) a 30-inch-diameter concrete-encased steel 
pipe that passes under the dam near the left abutment that is 
controlled at the downstream toe by (iii) a manually operated 30-inch 
rising stem gate valve, and (iv) a concrete valve house located at the 
south of Saddlebag Dam; (2) the 270-foot-long, 27-foot-high redwood-
faced rockfill Tioga Dam with: (e) 57-feet-wide, 4-feet-deep spillway 
with a crest elevation of 9,650.28 feet msl, (f) the low-level outlet 
works consisting of a 24-inch-diameter concrete-encased riveted steel 
pipe that passes through the base of the main Tioga Dam with an 
upstream invert elevation of 9,626.72 feet msl, draining into Lee 
Vining Creek which is manually controlled by (g) a 24-inch gate valve 
located in (h) a concrete valve house at the downstream toe of the 
Tioga Dam; and (3) the 50-foot-long, 19-foot-high, concrete-arch Tioga 
Auxiliary Dam located on Tioga Lake in the headwaters of Glacier Creek, 
that together with the Tioga Dam impound the 73-acre Tioga Lake with 
1,254 acre-feet net storage capacity at 9,650.28 feet msl, and (j) the 
19.5-foot-long right auxiliary spillway bay, and the 21.5-foot-long 
left auxiliary spillway bay at 9,651.28 feet msl crest elevation; and 
(4) the 437-foot-long, 18.5-foot-high rockfill Rhinedollar Dam that (k) 
impounds the 61-acre Ellery Lake with 493 acre-feet net storage 
capacity at 9,492.53 feet above msl, (l) three spillway bays, each 12-
foot-wide and 6.5-foot-deep, located at Rhinedollar Dam at an elevation 
of 9,492.53 feet msl, (m) a reinforced concrete intake structure at 
9,480 feet elevation msl, (n) a 6,271-foot-long below ground flowline 
with a maximum flow of 110 cfs that convey flows from Ellery Lake at 
the Rhinedollar Dam to Poole Powerhouse and consists of: (v) a 2,530-
foot-long, 48-inch-diameter double riveted steel pipeline, and (vi) a 
3,741-foot-long steel penstock that tapers from 44- to 28-inches in 
diameter; (o) the outlet works

[[Page 32969]]

consists of a 48-inch concrete-encased steel pipe conduit with a 
butterfly valve at the downstream end; (p) the 68-foot-long, 38-foot-
wide, 43-foot-high reinforced concrete Poole Powerhouse and located on 
Lee Vining Creek east downstream of Ellery Lake which contains one 
generating unit with a nameplate capacity of 11.25 megawatts (MWs); (q) 
a switchyard located immediately north of the powerhouse that contains 
the main power transformers, (r) approximately 50 feet of primary 
transmission line between the switchyard and Poole Powerhouse, (s) 
seven project-associated stream gages immediately downstream of 
Saddlebag and Tioga Dams, in stream; and (t) appurtenant facilities.
    Southern California Edison Company is not proposing any changes to 
project facilities or operation.
    m. A copy of the application may be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport. A copy is also available for inspection 
and reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS'', ``REPLY COMMENTS'', 
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;'' 
(2) set forth in the heading the name of the applicant and the project 
number of the application to which the filing responds; (3) furnish the 
name of the person protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202)502-6595 or <a href="/cdn-cgi/l/email-protection#abe4fbfbebcdced9c885ccc4dd"><span class="__cf_email__" data-cfemail="420d121202242730216c252d34">[email&#160;protected]</span></a>.
    o. The applicant must file the following on or before 5:00 p.m. 
Eastern Time on July 27, 2026: (1) a copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    p. Final amendments to the application must be filed with the 
Commission on or before 5:00 p.m. Eastern Time June 29, 2026.

(Authority: 18 CFR 2.1)

    Dated: May 28, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-10988 Filed 6-1-26; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on June 2, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.