Rule2026-10738

Air Plan Approval; ID; Update to Materials Incorporated by Reference

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
May 29, 2026
Effective
May 29, 2026

Issuing agencies

Environmental Protection Agency

Abstract

The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Idaho State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by Idaho and approved by the EPA. This update affects the materials that are available for public inspection at the EPA Regional Office and the National Archives and Records Administration (NARA). In this action, the EPA is also notifying the public that we are correcting a typographical error.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 103 (Friday, May 29, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 103 (Friday, May 29, 2026)]
[Rules and Regulations]
[Pages 31932-31939]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-10738]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R10-OAR-2026-0498; FRL-13207-01-R10]


Air Plan Approval; ID; Update to Materials Incorporated by 
Reference

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule; administrative change.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is updating the 
materials that are incorporated by reference (IBR) into the Idaho State 
Implementation Plan (SIP). The regulations affected by this update have 
been previously submitted by Idaho and approved by the EPA. This update 
affects the materials that are available for public inspection at the 
EPA Regional Office and the National Archives and Records 
Administration (NARA). In this action, the EPA is also notifying the 
public that we are correcting a typographical error.

DATES: This action is effective May 29, 2026.

ADDRESSES: The SIP materials for which incorporation by reference into 
40 CFR part 52 is finalized through this action are available for 
inspection at the following locations: Environmental Protection Agency, 
Region 10, 1200 Sixth Avenue, Suite 155, Seattle, WA 98101; and 
<a href="http://www.regulations.gov">www.regulations.gov</a>. To view the materials at the Region 10 Office, the 
EPA requests that you email the contact listed in the FOR FURTHER 
INFORMATION CONTACT section to schedule your inspection. The Regional 
Office's official hours of business are Monday through Friday 8:30 a.m. 
to 4:30 p.m., excluding Federal holidays.

FOR FURTHER INFORMATION CONTACT: Jeff Hunt, EPA Region 10, 1200 Sixth 
Avenue--Suite 155, Seattle, WA 98101, at (206) 553-0256, or 
<a href="/cdn-cgi/l/email-protection#2149544f550f4b444747614451400f464e57"><span class="__cf_email__" data-cfemail="ea829f849ec4808f8c8caa8f9a8bc48d859c">[email&#160;protected]</span></a>.

SUPPLEMENTARY INFORMATION: 

I. Background

    Each State has a SIP containing the control measures and strategies 
used to attain and maintain the national ambient air quality standards 
(NAAQS). The SIP is extensive, containing such elements as air 
pollution control regulations, emission inventories, monitoring 
networks, attainment demonstrations, and enforcement mechanisms.
    Each State must formally adopt the control measures and strategies 
in the SIP after the public has had an opportunity to comment on them 
and then submit the proposed SIP revisions to the EPA. Once these 
control measures and strategies are approved by EPA, and after notice 
and comment, they are incorporated into the federally approved SIP and 
are identified in part 52, ``Approval and Promulgation of 
Implementation Plans,'' of title 40 of the Code of Federal Regulations 
(40 CFR part 52). The full text of the State regulation approved by the 
EPA is not reproduced in its entirety in 40 CFR part 52 but is 
``incorporated by reference.'' This means that the EPA has approved a 
given State regulation or specified changes to the given regulation 
with a specific effective date. The public is referred to the location 
of the full text version should they want to know which measures are 
contained in a given SIP. The information provided allows the EPA and 
the public to monitor the extent to which a State implements a SIP to 
attain and maintain the NAAQS and to take enforcement action for 
violations of the SIP.
    The SIP is a living document which the State can revise as 
necessary to address the unique air pollution problems in the State. 
Therefore, the EPA from time to time must take action on proposed 
revisions containing new or revised State regulations. A submission 
from a State can revise one or more rules in their entirety, or 
portions of rules. The State indicates the changes in the submission 
(such as by using redline/strikethrough text) and the EPA then takes 
action on the requested changes. The EPA establishes a docket for its 
actions using a unique Docket Identification Number, which is listed in 
each action. These dockets and the complete submission are available 
for viewing on <a href="http://www.regulations.gov">www.regulations.gov</a>.
    On May 22, 1997 (62 FR 27968), the EPA revised the procedures for 
incorporating by reference, into the Code of Federal Regulations, 
materials approved by the EPA into each SIP. These changes revised the 
format for the identification of the SIP in 40 CFR part 52, streamlined 
the mechanisms for announcing the EPA approval of revisions to a SIP, 
and streamlined the mechanisms for the EPA's updating of the IBR 
information contained for each SIP in 40 CFR part 52. The revised 
procedures also called for the EPA to maintain ``SIP Compilations'' 
that contain the federally approved regulations and source-specific 
permits submitted by each State agency.
    The EPA generally updates these SIP Compilations every few years. 
Under the revised procedures, the EPA must periodically publish an 
informational document in the rules section of the Federal Register 
notifying the public that updates have been made to a SIP Compilation 
for a particular state. The EPA began applying the revised IBR 
procedures to the Idaho SIP on January 25, 2005 (70 FR 3479) and 
subsequently published updates to the IBR materials in the Idaho SIP on 
December 28, 2012 (77 FR 76417), April 1, 2015 (80 FR 17333), July 24, 
2020 (85 FR 44741), November 18, 2024 (89 FR 90592), and June 27, 2025 
(90 FR 27470).

II. EPA Action

    In this action, the EPA is providing notification of an update to 
the materials incorporated by reference into the Idaho SIP as of 
January 6, 2026, and identified in 40 CFR 52.670(c) and (d). This 
update includes SIP materials submitted by Idaho and approved by the 
EPA since the last IBR update. See 90 FR 27470 (June 27, 2025). This 
action also corrects a minor typographical error from a previous EPA 
approval for the P4 Production LLC, Soda Springs, Idaho facility in 
which we inadvertently cited the nonexistent permit condition ``13.33'' 
instead of the correct citation ``13.23.'' See 90 FR 42821 (September 
5, 2025).

III. Good Cause Exemption

    The EPA has determined that this action falls under the ``good 
cause'' exemption in section 553(b)(3)(B) of the Administrative 
Procedure Act (APA) which, upon finding ``good cause,'' authorizes 
agencies to dispense with public participation and section 553(d)(3) 
which allows an agency to make an action effective immediately (thereby 
avoiding the 30-day delayed effective date otherwise provided for in 
the APA). This administrative action simply codifies provisions which 
are already in effect as a matter of law in Federal and approved state 
programs and makes a correction a table in the CFR. Under section 553 
of the APA, an agency may find good cause where procedures are 
``impracticable, unnecessary, or contrary to the public interest.'' 
Public comment for this administrative action is ``unnecessary'' and 
``contrary to the public interest'' since the codification (and 
corrections) only reflect existing law. Immediate notice of this action 
in the Federal Register benefits the public by providing the public 
notification of the updated Idaho SIP Compilation and notification of 
corrections to the Idaho ``Identification of Plan'' portion of the CFR. 
Further, pursuant to section 553(d)(3), making this action

[[Page 31933]]

immediately effective benefits the public by immediately updating both 
the SIP Compilation and the CFR ``Identification of plan'' section 
(which includes table entry corrections).

IV. Incorporation by Reference

    In this document, the EPA is finalizing regulatory text that 
includes incorporation by reference. In accordance with requirements of 
1 CFR 51.5, the EPA is finalizing the incorporation by reference of 
regulations promulgated by Idaho previously approved by the EPA and 
federally effective before January 6, 2026, contained in 40 CFR 
52.670(c) and (d) as described in section I of this preamble. The EPA 
has made, and will continue to make, these materials generally 
available through <a href="http://www.regulations.gov">www.regulations.gov</a> and at the EPA Region 10 Office 
(please contact the person identified in the FOR FURTHER INFORMATION 
CONTACT section of this preamble for more information).

V. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a 
SIP submission that complies with the provisions of the Clean Air Act 
and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). 
Thus, in reviewing SIP submissions, the EPA's role is to approve State 
choices, provided that they meet the criteria of the Clean Air Act. 
Accordingly, this action merely approves State law as meeting Federal 
requirements and does not impose additional requirements beyond those 
imposed by State law. For that reason, this action:
    <bullet> Is not a significant regulatory action subject to review 
by the Office of Management and Budget under Executive Order 12866 (58 
FR 51735, October 4, 1993);
    <bullet> Is not an Executive Order 14192 (90 FR 9065, February 6, 
2025) regulatory action because this action is not significant under 
Executive Order 12866;
    <bullet> Does not impose an information collection burden under the 
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    <bullet> Is certified as not having a significant economic impact 
on a substantial number of small entities under the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.);
    <bullet> Does not contain any unfunded mandate or significantly or 
uniquely affect small governments, as described in the Unfunded 
Mandates Reform Act of 1995 (Pub. L. 104-4);
    <bullet> Does not have federalism implications as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999);
    <bullet> Is not subject to Executive Order 13045 (62 FR 19885, 
April 23, 1997) because it approves a State program;
    <bullet> Is not a significant regulatory action subject to 
Executive Order 13211 (66 FR 28355, May 22, 2001); and
    <bullet> Is not subject to requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) because application of those requirements would be inconsistent 
with the Clean Air Act.
    In addition, this action is not approved to apply on any Indian 
reservation land or in any other area where the EPA or an Indian Tribe 
has demonstrated that a Tribe has jurisdiction. In those areas of 
Indian country, the rule does not have Tribal implications and will not 
impose substantial direct costs on Tribal Governments or preempt Tribal 
law as specified by Executive Order 13175 (65 FR 67249, November 9, 
2000).
    This action is subject to the Congressional Review Act, and the EPA 
will submit a rule report to each House of the Congress and to the 
Comptroller General of the United States. This action is not a ``major 
rule'' as defined by 5 U.S.C. 804(2).
    The EPA also believes that the provisions of section 307(b)(1) of 
the Clean Air Act pertaining to petitions for judicial review are not 
applicable to this action. This is because prior EPA rulemaking actions 
for each individual component of the Idaho SIP Compilation previously 
afforded interested parties the opportunity to file a petition for 
judicial review in the United States Court of Appeals for the 
appropriate circuit within 60 days of such rulemaking action. Thus, the 
EPA believes judicial review of this action under section 307(b)(1) is 
not available.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen 
dioxide, Ozone, Particulate matter, Reporting and recordkeeping 
requirements, Sulfur oxides, Volatile organic compounds.

    Dated: May 18, 2026.
Emma Pokon,
Regional Administrator, Region 10.

    For the reasons set forth in the preamble, 40 CFR part 52 is 
amended as follows:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

Subpart N--Idaho

0
2. Amend Sec.  52.670 by:
0
a. Revising paragraph (b);
0
b. Republishing paragraph (c); and
0
c. Revising paragraph (d).
    The revisions and republication read as follows:


Sec.  52.670  Identification of plan.

* * * * *
    (b) Incorporation by reference. (1) Material listed in paragraphs 
(c) and (d) of this section with an EPA approval date prior to January 
6, 2026, was approved for incorporation by reference by the Director of 
the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 
51. Material is incorporated as it exists on the date of the approval 
and notification of any change in the material will be published in the 
Federal Register. Entries in paragraphs (c) and (d) of this section 
with EPA approval dates after January 6, 2026, will be incorporated by 
reference in the next update to the SIP compilation.
    (2) EPA Region 10 certifies that the rules/regulations provided by 
the EPA in the SIP compilation at the addresses in paragraph (b)(3) of 
this section are an exact duplicate of the officially promulgated State 
rules/regulations which have been approved as part of the State 
Implementation Plan as of the dates referenced in paragraph (b)(1) of 
this section.
    (3) Copies of the materials incorporated by reference may be 
inspected at the Region 10 EPA Office at 1200 Sixth Avenue, Suite 155, 
Seattle, WA 98101. To obtain the material, please call (206) 553-0256. 
You may inspect the material with an EPA approval date prior to January 
6, 2026, for Idaho at the National Archives and Records Administration 
(NARA). For information on the availability of this material at NARA 
email <a href="/cdn-cgi/l/email-protection#c3a5a6a7b1a6a4edafa6a4a2af83ada2b1a2eda4acb5"><span class="__cf_email__" data-cfemail="f5939091879092db9990929499b59b948794db929a83">[email&#160;protected]</span></a> or go to <a href="http://www.archives.gov/federal-register/cfr/ibr-locations.html">http://www.archives.gov/federal-register/cfr/ibr-locations.html</a>.
    (c) EPA approved laws and regulations.

[[Page 31934]]



                                   Table 1 to Paragraph (c)--State Regulations
----------------------------------------------------------------------------------------------------------------
  State citation           Title/subject        State effective date    EPA approval date       Explanations
----------------------------------------------------------------------------------------------------------------
                        Rules for the Control of Air Pollution in Idaho (IDAPA 58.01.01)
----------------------------------------------------------------------------------------------------------------
001...............  Title and scope...........  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
005...............  Definitions...............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
006...............  General definitions.......  3/28/2023...........  12/5/2024, 89 FR      Except subsections
                                                                       96554                 006.23, 006.24,
                                                                                             006.25, 006.30,
                                                                                             006.31.b, 006.49,
                                                                                             006.50, 006.51.
007...............  Definitions for the         3/28/2023...........  12/5/2024, 89 FR      ....................
                     purposes of sections 200                          96554
                     through 225 and 400
                     through 461.
107...............  Incorporations by           7/1/2024............  12/5/2024, 89 FR      Except subsections
                     reference.                                        96554                 107.06 through
                                                                                             107.16.
108...............  Obligation to comply......  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
121...............  Compliance requirements by  3/28/2023...........  12/5/2024, 89 FR      ....................
                     department.                                       96554
122...............  Information orders by the   3/28/2023...........  12/5/2024, 89 FR      ....................
                     department.                                       96554
123...............  Certification of documents  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
125...............  False statements..........  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
126...............  Tampering.................  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
130...............  Startup, shutdown,          7/1/2024............  12/5/2024, 89 FR      ....................
                     scheduled maintenance,                            96554
                     safety measures, upset
                     and breakdown.
131...............  Excess emissions..........  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
132...............  Correction of condition...  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
133...............  Startup, shutdown and       3/28/2023...........  12/5/2024, 89 FR      ....................
                     scheduled maintenance                             96554
                     requirements.
134...............  Upset, breakdown and        3/28/2023...........  12/5/2024, 89 FR      ....................
                     safety requirements.                              96554
135...............  Excess emissions reports..  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
136...............  Excess emissions records..  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
155...............  Circumvention.............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
156...............  Total compliance..........  5/1/1994............  1/16/2003, 68 FR      ....................
                                                                       2217
157...............  Test methods and            3/28/2023...........  12/5/2024, 89 FR      ....................
                     procedures.                                       96554
164...............  Polychlorinated biphenyls   3/28/2023...........  12/5/2024, 89 FR      ....................
                     (PCBs).                                           96554
175...............  Procedures and              3/28/2023...........  12/5/2024, 89 FR      ....................
                     requirements for permits                          96554
                     establishing a facility
                     emissions cap.
176...............  Facility emissions cap....  3/28/2023...........  12/5/2024, 89 FR      Except for
                                                                       96554                 provisions relating
                                                                                             to hazardous air
                                                                                             pollutants.
177...............  Application procedures....  4/11/2015...........  8/12/2016, 81 FR      ....................
                                                                       53290
178...............  Standard contents of        3/28/2023...........  12/5/2024, 89 FR      ....................
                     permits establishing a                            96554
                     facility emissions cap.
179...............  Procedures for issuing      3/28/2023...........  12/5/2024, 89 FR      ....................
                     permits establishing a                            96554
                     facility emissions cap.
180...............  Revisions to permits        3/28/2023...........  12/5/2024, 89 FR      ....................
                     establishing a facility                           96554
                     emissions cap.
181...............  Notice and record-keeping   3/28/2023...........  12/5/2024, 89 FR      ....................
                     of estimates of ambient                           96554
                     concentrations.
200...............  Procedures and              3/28/2023...........  12/5/2024, 89 FR      ....................
                     requirements for permits                          96554
                     to construct.
201...............  Permit to construct         3/28/2023...........  12/5/2024, 89 FR      ....................
                     required.                                         96554
202...............  Application procedures....  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
203...............  Permit requirements for     3/28/2023...........  12/5/2024, 89 FR      Except subsection
                     new and modified                                  96554                 203.03.
                     stationary sources.
204...............  Permit requirements for     3/28/2023...........  12/5/2024, 89 FR      ....................
                     new major facilities or                           96554
                     major modifications in
                     nonattainment areas.
205...............  Permit requirements for     3/28/2023...........  12/5/2024, 89 FR      ....................
                     new major facilities or                           96554
                     major modifications in
                     attainment or
                     unclassifiable areas.
206...............  Optional offsets for        3/28/2023...........  12/5/2024, 89 FR      ....................
                     permits to construct.                             96554
207...............  Requirements for emission   5/1/1994............  1/16/2003, 68 FR      ....................
                     reduction credit.                                 2217
208...............  Demonstration of net air    3/28/2023...........  12/5/2024, 89 FR      ....................
                     quality benefit.                                  96554
209...............  Procedure for issuing       3/28/2023...........  12/5/2024, 89 FR      ....................
                     permits.                                          96554
211...............  Conditions for permits to   3/28/2023...........  12/5/2024, 89 FR      ....................
                     construct.                                        96554
212...............  Relaxation of standards or  3/28/2023...........  12/5/2024, 89 FR      ....................
                     restrictions.                                     96554
213...............  Pre-permit construction...  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
220...............  General exemption criteria  3/28/2023...........  12/5/2024, 89 FR      ....................
                     for permit to construct                           96554
                     exemptions.
221...............  Category I exemption......  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
222...............  Category II exemption.....  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
226...............  Payment of fees for         3/28/2023...........  12/5/2024, 89 FR      ....................
                     permits to construct.                             96554
227...............  Receipt and usage of fees.  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
400...............  Procedures and              3/28/2023...........  12/5/2024, 89 FR      ....................
                     requirements for Tier II                          96554
                     operating permits.

[[Page 31935]]

 
401...............  Tier II operating permit..  3/28/2023...........  12/5/2024, 89 FR      Except subsections
                                                                       96554                 401.01.a and
                                                                                             401.04.
402...............  Application procedures....  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
403...............  Permit requirements for     3/28/2023...........  12/5/2024, 89 FR      ....................
                     Tier II sources.                                  96554
404...............  Procedure for issuing       3/28/2023...........  12/5/2024, 89 FR      ....................
                     permits.                                          96554
405...............  Conditions for Tier II      3/28/2023...........  12/5/2024, 89 FR      ....................
                     operating permits.                                96554
460...............  Requirements for emission   3/28/2023...........  12/5/2024, 89 FR      ....................
                     reduction credit.                                 96554
461...............  Requirements for banking    3/28/2023...........  12/5/2024, 89 FR      ....................
                     emission reduction                                96554
                     credits (ERC's).
500...............  Registration procedures     3/28/2023...........  12/5/2024, 89 FR      ....................
                     and requirements for                              96554
                     portable equipment.
510...............  Stack heights and           3/28/2023...........  12/5/2024, 89 FR      ....................
                     dispersion techniques.                            96554
511...............  Requirements..............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
512...............  Opportunity for public      3/28/2023...........  12/5/2024, 89 FR      ....................
                     hearing.                                          96554
513...............  Approval of field studies   3/28/2023...........  12/5/2024, 89 FR      ....................
                     and fluid models.                                 96554
514...............  No restriction on actual    3/28/2023...........  12/5/2024, 89 FR      ....................
                     stack height.                                     96554
550...............  Air quality episodes......  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
556...............  Criteria for declaring air  3/28/2023...........  12/5/2024, 89 FR      ....................
                     quality episodes.                                 96554
557...............  Requirements during air     3/28/2023...........  12/5/2024, 89 FR      ....................
                     quality episodes.                                 96554
558...............  Notification of air         3/28/2023...........  12/5/2024, 89 FR      ....................
                     quality episode.                                  96554
562...............  Specific air quality        3/28/2023...........  12/5/2024, 89 FR      ....................
                     episode abatement plans                           96554
                     for stationary sources.
563...............  Transportation conformity.  3/30/2001...........  4/12/2001, 66 FR      ....................
                                                                       18873
564...............  Incorporation by reference  3/30/2001...........  4/12/2001, 66 FR      ....................
                                                                       18873
565...............  Abbreviations.............  3/30/2001...........  4/12/2001, 66 FR      ....................
                                                                       18873
566...............  Definitions for the         3/30/2001...........  4/12/2001, 66 FR      ....................
                     purpose of sections 563                           18873
                     through 574 and 582.
567...............  Agencies affected by        3/30/2001...........  4/12/2001 66 FR       ....................
                     consultation.                                     18873
568...............  ICC member roles in         3/30/2001...........  4/12/2001, 66 FR      ....................
                     consultation.                                     18873
569...............  ICC member                  3/30/2001...........  4/12/2001, 66 FR      ....................
                     responsibilities in                               18873
                     Consultation.
570...............  General consultation        3/30/2001...........  4/12/2001, 66 FR      ....................
                     process.                                          18873
571...............  Consultation procedures...  3/30/2001...........  4/12/2001, 66 FR      ....................
                                                                       18873
572...............  Final conformity            3/30/2001...........  4/12/2001, 66 FR      ....................
                     determinations by USDOT.                          18873
573...............  Resolving conflicts.......  3/30/2001...........  4/12/2001, 66 FR      ....................
                                                                       18873
574...............  Public consultation         3/30/2001...........  4/12/2001, 66 FR      ....................
                     procedures.                                       18873
579...............  Baselines for prevention    3/28/2023...........  12/5/2024, 89 FR      ....................
                     of significant                                    96554
                     deterioration.
580...............  Classification of           3/28/2023...........  12/5/2024, 89 FR      ....................
                     prevention of significant                         96554
                     deterioration areas.
581...............  Prevention of significant   3/28/2023...........  12/5/2024, 89 FR      ....................
                     deterioration (PSD)                               96554
                     increments.
600...............  Rules for control of open   3/28/2023...........  12/5/2024, 89 FR      ....................
                     burning.                                          96554
601...............  Fire permits, hazardous     3/28/2023...........  12/5/2024, 89 FR      ....................
                     materials, and liability.                         96554
602...............  Nonpreemption of other      3/28/2023...........  12/5/2024, 89 FR      ....................
                     jurisdiction.                                     96554
603...............  General requirements......  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
606...............  Categories of allowable     3/28/2023...........  12/5/2024, 89 FR      ....................
                     burning.                                          96554
607...............  Recreational and warming    3/28/2023...........  12/5/2024, 89 FR      ....................
                     fires.                                            96554
608...............  Weed control fires........  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
609...............  Training fires............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
611...............  Residential yard waste      3/28/2023...........  12/5/2024, 89 FR      ....................
                     fires.                                            96554
612...............  Solid waste facility fires  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
613...............  Orchard fires.............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
614...............  Prescribed fires..........  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
615...............  Dangerous material fires..  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
616...............  Infectious waste burning..  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
617...............  Crop residue disposal.....  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
618...............  Permit by rule............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
619...............  Registration..............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
620...............  Burn fee..................  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
621...............  Burn approval.............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
622...............  General provisions........  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
623...............  Public notification.......  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
624...............  Spot and baled crop         3/28/2023...........  12/5/2024, 89 FR      ....................
                     residue burn and propane                          96554
                     flaming requirements.
625...............  Visible emissions.........  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
650...............  Rules for control of        3/28/2023...........  12/5/2024, 89 FR      ....................
                     fugitive dust.                                    96554
651...............  General rules.............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
665...............  Regional haze rules.......  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
666...............  Reasonable progress goals.  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
667...............  Long-term strategy for      3/28/2023...........  12/5/2024, 89 FR      ....................
                     regional haze.                                    96554
675...............  Fuel burning equipment--    3/28/2023...........  12/5/2024, 89 FR      ....................
                     particulate matter.                               96554
676...............  Standards for new sources.  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554

[[Page 31936]]

 
677...............  Standards for minor and     3/28/2023...........  12/5/2024, 89 FR      ....................
                     existing sources.                                 96554
678...............  Combinations of fuels.....  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
679...............  Averaging period..........  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
680...............  Altitude correction.......  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
681...............  Test methods and            3/28/2023...........  12/5/2024, 89 FR      ....................
                     procedures.                                       96554
700...............  Particulate matter--        3/28/2023...........  12/5/2024, 89 FR      ....................
                     process weight                                    96554
                     limitations.
701...............  Particulate matter--new     3/28/2023...........  12/5/2024, 89 FR      ....................
                     equipment process weight                          96554
                     limitations.
702...............  Particulate matter--        3/28/2023...........  12/5/2024, 89 FR      ....................
                     existing equipment                                96554
                     process weight
                     limitations.
703...............  Particulate matter--other   3/28/2023...........  12/5/2024, 89 FR      ....................
                     processes.                                        96554
725...............  Rules for sulfur content    3/28/2023...........  12/5/2024, 89 FR      ....................
                     of fuels.                                         96554
790...............  Rule for the control of     3/15/2002...........  8/12/2016, 81 FR      ....................
                     nonmetallic mineral                               53290
                     processing plants.
791...............  General control             3/28/2023...........  12/5/2024, 89 FR      ....................
                     requirements.                                     96554
793...............  Emissions standards for     3/28/2023...........  12/5/2024, 89 FR      ....................
                     nonmetallic mineral                               96554
                     processing plants not
                     subject to 40 CFR part
                     60, subpart OOO.
794...............  Permit requirements.......  3/28/2023...........  12/5/2024, 89 FR      Except subsection
                                                                       96554                 794.04.
795...............  Permit by rule              3/28/2023...........  12/5/2024, 89 FR      ....................
                     requirements.                                     96554
796...............  Applicability.............  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
797...............  Registration for permit by  3/28/2023...........  12/5/2024, 89 FR      ....................
                     rule.                                             96554
798...............  Electrical generators.....  3/28/2023...........  12/5/2024, 89 FR      ....................
                                                                       96554
799...............  Nonmetallic mineral         3/15/2002...........  8/12/2016, 81 FR      ....................
                     processing plan fugitive                          53290
                     dust best management
                     practice.
815...............  Rules for control of kraft  3/28/2023...........  12/5/2024, 89 FR      ....................
                     pulp mills.                                       96554
818...............  Kraft pulp mill LVHC and    3/28/2023...........  12/5/2024, 89 FR      ....................
                     HVLC gas venting                                  96554
                     notification and
                     reporting.
----------------------------------------------------------------------------------------------------------------


                                    Table 2 to Paragraph (c)--State Statutes
----------------------------------------------------------------------------------------------------------------
                                                       State effective
         State citation             Title/subject            date          EPA approval date     Explanations
----------------------------------------------------------------------------------------------------------------
Section 4 of Senate Bill 1024,   Open Burning of     2/26/2019..........  12/9/2019, 84 FR
 codified at Idaho Code section   Crop Residue.                            67189
 39-114.
Idaho Code section 39-107(1)(a)  Board--Composition  7/1/2022...........  5/26/2023, 88 FR    To satisfy the
                                  -Officers--Compen                        34093               requirements of
                                  sation--Powers--S                                            CAA section
                                  ubpoena--Depositi                                            128(a)(1) and CAA
                                  ons--Review--Rule                                            section
                                  s.                                                           110(a)(2)(E)(ii)
                                                                                               for all criteria
                                                                                               pollutants.
Idaho Code section 39.103......  Definitions.......  7/1/2010...........  12/5/2024, 89 FR    Except (4), (5),
                                                                           96554               (8), (9), (10),
                                                                                               (12), (13), (14),
                                                                                               (15), (16), (17),
                                                                                               and (18).
----------------------------------------------------------------------------------------------------------------


                         Table 3 to Paragraph (c)--City and County Codes and Ordinances
----------------------------------------------------------------------------------------------------------------
                                                        State effective
         State citation              Title/subject           date          EPA approval date     Explanations
----------------------------------------------------------------------------------------------------------------
City of Sandpoint Ordinance No.   Material            2/22/1994 (City     6/26/2002, 67 FR    Sandpoint PM10
 939.                              Specifications      adoption date).     43006.              Nonattainment
                                   for Street                                                  Area Plan.
                                   Sanding Material.
City of Sandpoint Chapter 8 Air   Solid Fuel Heating  9/21/2011 (City     4/3/2013, 78 FR     Codified version
 Quality (4-8-1 through 4-8-14).   Appliances.         adoption date).     20001.              of City of
                                                                                               Sandpoint
                                                                                               Ordinance No. 965
                                                                                               as amended by
                                                                                               Ordinance No.
                                                                                               1237 and
                                                                                               Ordinance No.
                                                                                               1258. Sandpoint
                                                                                               PM10 Limited
                                                                                               Maintenance Plan.
Boise City Ordinance 4432.......  Parking Permits...  8/13/1979 (City     6/6/1985, 50 FR     Transportation
                                                       approval date).     23810.              Control Plan for
                                                                                               carbon monoxide,
                                                                                               Ada County.
City of Garden City Ordinance     Solid Fuel Heating  5/14/1987, 1/10/    5/30/1996, 61 FR    Northern Ada
 514, 533, and 624.                Appliance           1989, 9/13/1994     27019.              County PM10
                                   Ordinance of the    (City approval                          Nonattainment
                                   City of Garden      dates).                                 Area Plan.
                                   City, Idaho.
Meridian Ordinance 667..........  Meridian Clean Air  8/16/1994 (City     5/30/1996, 61 FR    Northern Ada
                                   Ordinance.          approval date).     27019.              County PM10
                                                                                               Nonattainment
                                                                                               Area Plan.

[[Page 31937]]

 
City of Eagle Ordinance 245.....  City of Eagle       4/26/1994 (City     5/30/1996, 61 FR    Northern Ada
                                   Clean Air           approval date).     27019.              County PM10
                                   Ordinance.                                                  Nonattainment
                                                                                               Area Plan.
Ada County Ordinance 254........  Ada County Clean    11/3/1992 (County   5/30/1996, 61 FR    Northern Ada
                                   Air Ordinance.      adoption date).     27019.              County PM10
                                                                                               Nonattainment
                                                                                               Area Plan.
Table: Ordinance-1..............  Explanation of      12/30/1994 (date    5/30/1996, 61 FR    Northern Ada
                                   enforcement         of table).          27019.              County PM10
                                   procedures,                                                 Nonattainment
                                   responsibilities                                            Area Plan.
                                   and sources of
                                   funding for the
                                   Northern Ada
                                   County Wood
                                   Burning Control
                                   Ordinances.
City of Pocatello Ordinance 2450  Residential wood    1/12/1994.........  7/13/2006, 71 FR    Portneuf Valley
                                   combustion                              39574.              Nonattainment
                                   curtailment                                                 Area Plan and
                                   ordinance.                                                  Maintenance Plan.
City of Pocatello Ordinance 2726  Revised air         9/18/2003.........  7/13/2006, 71 FR    Portneuf Valley
                                   quality                                 39574.              Nonattainment
                                   curtailment                                                 Area Plan and
                                   levels.                                                     Maintenance Plan.
City of Chubbuck Ordinance 403..  Residential wood    11/23/1993........  7/13/2006, 71 FR    Portneuf Valley
                                   combustion                              39574.              Nonattainment
                                   curtailment                                                 Area Plan and
                                   ordinance.                                                  Maintenance Plan.
City of Chubbuck Ordinance 582..  Revised air         12/9/2003.........  7/13/2006, 71 FR    Portneuf Valley
                                   quality                                 39574.              Nonattainment
                                   curtailment                                                 Area Plan and
                                   levels.                                                     Maintenance Plan.
City of Clifton Ordinance No.     Ordinance No. 120.  8/11/2012.........  3/25/2014, 79 FR    Except Section 9
 120.                                                                      16201.              (Penalty).
City of Dayton Ordinance #287...  Ordinance #287....  8/8/2012..........  3/25/2014, 79 FR    Except Section 9
                                                                           16201.              (Penalty).
Franklin City Ordinance No. 2012- Solid Fuel Heating  9/12/2012.........  3/25/2014, 79 FR    Except Section 9
 9-12.                             Appliances.                             16201.              (Penalty).
Franklin County Ordinance No.     Solid Fuel Heating  6/25/2012.........  3/25/2014, 79 FR    Except Section 9
 2012-6-25.                        Appliances.                             16201.              (Penalty).
City of Oxford Memorandum of      Solid Fuel Heating  10/22/2012........  3/25/2014, 79 FR    Except #2 of the
 Understanding.                    Appliances.                             16201.              MOA and Section 9
                                                                                               of Exhibit A.
City of Preston Ordinance No.     Ordinance No. 2012- 6/11/2012.........  3/25/2014, 79 FR    Except Section 9
 2012-1.                           1.                                      16201.              (Penalty).
City of Weston Ordinance No.      Ordinance No. 2012- 8/1/2012..........  3/25/2014, 79 FR    Except Section 9
 2012-01.                          01.                                     16201.              (Penalty).
----------------------------------------------------------------------------------------------------------------

    (d) EPA approved source-specific requirements.

                        Table 4 to Paragraph (d)--State Source-Specific Requirements \1\
----------------------------------------------------------------------------------------------------------------
                                                State effective    EPA approval
        Name of source            Permit No.          date             date                 Explanation
----------------------------------------------------------------------------------------------------------------
LP Wood Polymers, Inc.,        001-00115......  7/12/2002......  10/27/2003, 68   The following conditions: 1.1,
 Meridian, Idaho.                                                 FR 61106.        1.3, 3.1, and the Appendix.
                                                                                   (Boise/Ada County Maintenance
                                                                                   Plan).
Consolidated Concrete          001-00046......  12/3/2001......  10/27/2003, 68   The following conditions: 1.1,
 Company, Boise, Idaho.                                           FR 61106.        1.3, 2.3, 3.1, 3.2, and the
                                                                                   Appendix. (Boise/Ada County
                                                                                   Maintenance Plan).
Crookham Company, Caldwell,    027-00020......  1/18/2002......  10/27/2003, 68   The following conditions: 1.1,
 Idaho.                                                           FR 61106.        1.3, 2.1, 2.3, 3.1, 3.1.1,
                                                                                   3.1.2, 3.2, and the Appendix.
                                                                                   (Boise/Ada County Maintenance
                                                                                   Plan).
Double D Service Center,       001-00168......  2/4/2002.......  10/27/2003, 68   The following conditions: 1.1,
 Meridian, Idaho.                                                 FR 61106.        1.3, 3.1, 3.2.1, 3.2.2,
                                                                                   3.2.3, and the Appendix.
                                                                                   (Boise/Ada County Maintenance
                                                                                   Plan).
Plum Creek Northwest Lumber,   001-00091......  7/12/2002......  10/27/2003, 68   The following conditions: 1.1,
 Inc., Meridian, Idaho.                                           FR 61106.        1.3, 2.1.2, 3.1, and the
                                                                                   Appendix. (Boise/Ada County
                                                                                   Maintenance Plan).
C. Wright Construction, Inc.,  T2-000033......  7/8/2003.......  10/27/2003, 68   The following conditions: 2
 Meridian, Idaho.                                                 FR 61106.        (heading only), 2.5, (2.12,
                                                                                   Table 2.2 as it applies to
                                                                                   PM10), 2.14, 3 (heading
                                                                                   only), 3.3, Table 3.2, 3.4,
                                                                                   3.5, 3.6, 3.7, 3.8, 3.10, 4
                                                                                   (heading only), 4.2, 4.3,
                                                                                   4.4, 4.7, 5, and Table 5.1.
                                                                                   (Boise/Ada County Maintenance
                                                                                   Plan).
Nelson Construction Co.,       T2-020029......  7/21/2003......  10/27/2003, 68   The following conditions: 2
 Boise, Idaho.                                                    FR 61106.        (heading only), 2.12, 2.14, 3
                                                                                   (heading only), 3.3, 3.4,
                                                                                   3.6, 3.7, 3.9, 3.10, 3.11,
                                                                                   3.12, 4 (heading only), 4.3,
                                                                                   4.4, 4.5, 4.6, 5, and Table
                                                                                   5.1. (Boise/Ada County
                                                                                   Maintenance Plan).
Mike's Sand and Gravel,        001-00184......  7/12/2002......  10/27/2003, 68   The following conditions: 1.1,
 Nampa, Idaho.                                                    FR 61106.        1.3, 2.2.1, 3.1, and the
                                                                                   Appendix. (Boise/Ada County
                                                                                   Maintenance Plan).
Idaho Concrete Co., Eagle,     T2-020031......  7/8/2003.......  10/27/2003, 68   The following conditions: 2
 Idaho.                                                           FR 61106.        (heading only), 2.5, 2.13, 3
                                                                                   (heading only), 3.3, 3.4,
                                                                                   3.6, 3.7, 3.8, 4 (heading
                                                                                   only), and Table 4.1. (Boise/
                                                                                   Ada County Maintenance Plan).

[[Page 31938]]

 
Idaho Concrete Co., Eagle,     T2-020032......  7/8/2003.......  10/27/2003, 68   The following conditions: 2
 Idaho.                                                           FR 61106.        (heading only), 2.5, 2.13, 3
                                                                                   (heading only), 3.3, 3.4,
                                                                                   3.6, 3.7, 3.8, 4 (heading
                                                                                   only), and Table 4.1. (Boise/
                                                                                   Ada County Maintenance Plan).
Idaho Concrete Co. Eagle,      T2-020033......  7/8/2003.......  10/27/2003, 68   The following conditions: 2
 Idaho.                                                           FR 61106.        (heading only), 2.5, 2.13, 3
                                                                                   (heading only), 3.3, 3.4,
                                                                                   3.6, 3.7, 3.8, 4 (heading
                                                                                   only), and Table 4.1. (Boise/
                                                                                   Ada County Maintenance Plan).
The Amalgamated Sugar Company  027-00010......  9/30/2002......  10/27/2003, 68   The following conditions: 2
 LLC, Nampa, Idaho.                                               FR 61106 and     (heading only), (2.7, Table
                                                                  11/1/2004, 69    2.2 as it applies to PM10,)
                                                                  FR 63324.        2.10, 2.10.1, 2.10.2, 2.11,
                                                                                   2.11.1, 2.11.2, 2.11.3,
                                                                                   2.11.4, 2.11.5, 2.12, 2.12.1,
                                                                                   2.12.2, 2.12.3, 2.13, 2.13.1,
                                                                                   2.13.2, 2.13.3, 2.14, 2.14.1,
                                                                                   2.14.2, 2.16, 3 (heading
                                                                                   only), (3.3, Table 3.2 as it
                                                                                   applies to PM10), 3.5, 3.7,
                                                                                   3.8, 3.8.1, 3.8.2, 3.8.3,
                                                                                   3.8.4, 3.8.5, 3.8.6, 3.8.7,
                                                                                   3.8.8, 3.9, 4 (heading only),
                                                                                   (4.3, Table 4.1 as it applies
                                                                                   to PM10), 4.5, 4.6, 4.7, 5
                                                                                   (heading only), (5.3, Table
                                                                                   5.3 as it applies to PM10),
                                                                                   5.5, 5.9, 5.9.1, 5.9.2,
                                                                                   5.9.3, 5.9.4, 5.9.5, 5.9.6,
                                                                                   5.9.7, 5.9.8, 5.9.9, 5.10,
                                                                                   5.11, 6 (heading only), 6.3,
                                                                                   Table 6.1, 6.5, 6.6, 6.7,
                                                                                   6.7.1, 6.7.2, 6.8, 7 (heading
                                                                                   only), 7.3, Table 7.1 as it
                                                                                   applies to PM10, 7.5, 7.7,
                                                                                   7.7.1, 7.7.2, 7.8, 8 (heading
                                                                                   only), 8.3, Table 8.1, 8.5,
                                                                                   8.7, 8.7.1, 8.7.2, 8.8, 9
                                                                                   (heading only), 9.3, Table
                                                                                   9.1, 9.5, 9.7, 9.7.1, 9.7.2,
                                                                                   9.8, 10 (heading only), 10.3,
                                                                                   Table 10.1, 10.6, 10.8,
                                                                                   10.8.1, 10.8.2, 10.9, 11
                                                                                   (heading only), 11.3, Table
                                                                                   11.2, 11.6, 11.8, 11.8.1,
                                                                                   11.8.2, 11.9, 12 (heading
                                                                                   only), 12.3, Table 12.1,
                                                                                   12.5, 12.7, 12.7.1, 12.7.2,
                                                                                   12.8, 13 (heading only), 13.1
                                                                                   (except as it applies to
                                                                                   condition 13.3, 13.3.1,
                                                                                   13.3.2, 13.5, 13.5.1, 13.5.2,
                                                                                   13.5.3, 13.6, 13.6.1, 13.6.2
                                                                                   and 13.9), Table 13.1 (except
                                                                                   conditions 13.3, 13.5 and
                                                                                   13.6), (13.2, Table 13.2 as
                                                                                   it applies to PM10), 13.2.1,
                                                                                   13.4, 13.4.1, 13.4.2, 13.4.3,
                                                                                   13.7, 13.7.1, 13.7.2, 13.8,
                                                                                   13.8.1, 13.8.2, 13.8.3,
                                                                                   13.10, and 13.11. (Boise/Ada
                                                                                   County PM10 Maintenance
                                                                                   Plan).
Lake Pre-Mix, Sandpoint,       777-00182......  5/17/1996......  6/26/2002, 67    The following conditions for
 Idaho.                                                           FR 43006.        the cement silo vent: 1.1,
                                                                                   2.1.1, 2.1.2, 3.1.1, and
                                                                                   3.1.2. (Sandpoint
                                                                                   nonattainment area plan).
Interstate Concrete and        017-00048......  8/2/1999.......  6/26/2002, 67    The following conditions: for
 Asphalt, Sandpoint, Idaho.                                       FR 43006.        the asphalt plant, 2.2,
                                                                                   3.1.1, 4.1, 4.1.1, 4.1.2,
                                                                                   4.2.1 (as it applies to the
                                                                                   hourly PM10 emission limit in
                                                                                   Appendix A), 4.2.2, 4.2.2.1,
                                                                                   4.2.2.2, and 4.2.2.3; for the
                                                                                   concrete batch plant, 2.1,
                                                                                   3.1.1, 4.1, 4.1.1, and 4.1.2;
                                                                                   Appendix A (as it applies to
                                                                                   PM10 emission rates after 7/1/
                                                                                   96) and Appendix B (as it
                                                                                   applies after 7/1/96).
                                                                                   (Sandpoint nonattainment area
                                                                                   plan).
Whiteman Lumber Company,       13-1420-062....  7/16/1979 (date  7/28/1982, 47    Silver Valley TSP
 Cataldo, ID.                                    issued).         FR 32530.        Nonattainment Area Plan.
Potlatch Corporation, Pulp     13-1140-0001-00  7/5/1979 (date   7/28/1982, 47    Lewiston TSP Nonattainment
 and Paper Unit, Lewiston, ID.                   issued).         FR 32530.        Area Plan.
Potlatch Corporation,          13-1140-0003...  7/5/1979 (date   7/28/1982, 47    Lewiston TSP Nonattainment
 Clearwater Unit, Lewiston,                      issued).         FR 32530.        Area Plan.
 ID.
Coast Trading Company, Inc.,   13-1140-0011...  6/29/1979 (date  7/28/1982, 47    Lewiston TSP Nonattainment
 Lewiston, ID.                                   issued).         FR 32530.        Area Plan.
Lewis-Clark Terminal           13-1140-0010...  6/29/1979 (date  7/28/1982, 47    Lewiston TSP Nonattainment
 Association, Lewiston, ID.                      issued).         FR 32530.        Area Plan.
Poe Asphalt, Lewiston, ID....  0880-0008......  3/1/1976         7/28/1982, 47    Lewiston TSP Nonattainment
                                                 (effective       FR 32530.        Area Plan.
                                                 date).
FMC Corporation, Pocatello,    13-1260-0005...  2/26/1980 (date  7/28/1982, 47    Pocatello TSP Nonattainment
 ID \2\.                                         issued).         FR 32530.        Area Plan.
J.R. Simplot, Pocatello, ID..  13-1260-0006-00  3/4/1980 (date   7/28/1982, 47    Pocatello TSP Nonattainment
                                                 issued).         FR 32530.        Area Plan.
Idaho Portland Cement          13-0080-0004-00  7/18/1979 (date  7/28/1982, 47    Pocatello TSP Nonattainment
 Company, Inkom, ID.                             issued).         FR 32530.        Area Plan.
J.R. Simplot Company, Conda,   13-0420-0021-00  7/18/1979 (date  7/28/1982, 47    Soda Springs TSP Nonattainment
 ID.                                             issued).         FR 32530.        Area Plan.
Beker Industries, Conda, ID..  13-0420-0003-00  7/18/1979 (date  7/28/1982, 47    Soda Springs TSP Nonattainment
                                                 issued).         FR 32530.        Area Plan.
Monsanto, Soda Springs, ID...  13-0420-0001-00  7/18/1979 (date  7/28/1982, 47    Soda Springs TSP Nonattainment
                                                 issued).         FR 32530.        Area Plan.
Kerr McGee, Soda Springs, ID.  13-0420-0002-00  7/18/1979 (date  7/28/1982, 47    Soda Springs TSP Nonattainment
                                                 issued).         FR 32530.        Area Plan.
J.R. Simplot, Pocatello,       Air Pollution    4/5/2004.......  7/13/2006, 71    The following conditions:
 Idaho.                         Operating                         FR 39574.        Cover page, facility
                                Permit No. T1-                                     identification information
                                9507-114-1;                                        only, #300 Sulfuric Acid
                                Facility                                           Plant, Permit Conditions
                                Number No. 077-                                    16.1, 16.10, 16.11, #400
                                00006.                                             Sulfuric Acid Plant, Permit
                                                                                   Condition 17.1, 17.7, 17.10,
                                                                                   17.11, Phosphoric acid plant,
                                                                                   Permit Condition 12.3, 12.13,
                                                                                   Granulation No. 3 Process,
                                                                                   Permit Condition 9.2.1,
                                                                                   Granulation No. 3 stack, 9.17
                                                                                   (except 9.17.1 through
                                                                                   9.17.6), Reclaim Cooling
                                                                                   Towers, Permit Condition
                                                                                   14.2, 14.6.1, Babcock &
                                                                                   Wilcox Boiler, Permit
                                                                                   Condition 6.4, 6.12, HPB&W
                                                                                   Boiler, Permit Condition 5.3,
                                                                                   5.13 through 5.18, 5.21.
J.R. Simplot, Pocatello,       Compliance       4/16/2004......  7/13/2006, 71    The following conditions: No.
 Idaho.                         Agreement &                       FR 39574.        300 Sulfuric Acid Plant;
                                Voluntary                                          Condition 8 and 9. No. 400
                                Order Idaho                                        Sulfuric Acid Plant;
                                Code 39-116A.                                      Condition 10, 11, and 12.
                                                                                   Granulation No.1 Plant;
                                                                                   Condition 14. Granulation
                                                                                   No.2 Plant; Condition 15.
                                                                                   Compliance and Performance
                                                                                   Testing; Condition 16.
The Amalgamated Sugar Company  T2-2009.0105...  12/23/2011       4/28/2014, 79    The following conditions: 1.2,
 LLC--Nampa Factory, Nampa,                      (date issued).   FR 23273.        including the table of
 Idaho.                                                                            Regulated Emission Point
                                                                                   Sources Table, 3.2, 3.3
                                                                                   (first paragraph only), 3.4,
                                                                                   3.5, 3.6, 3.7, 3.8, 3.9,
                                                                                   3.11, 3.13, 3.14, 3.15, 3.16,
                                                                                   and 4.1.
P4 Production, L.L.C., Soda    T2-2009.0109...  11/17/2009       6/22/2011, 76    The following conditions: 1.2
 Springs, Idaho.                                 (date issued).   FR 36329.        (including Table 1.1), 2.3,
                                                                                   2.4, 2.5, 2.6, 2.7, and 2.8.
                                                                                   (Regional Haze SIP Revision).

[[Page 31939]]

 
Clearwater Paper Corp,         T1-2020.0024...  3/30/2023......  9/5/2025, 90 FR  Permit conditions 5.4, 5.5,
 Lewiston, Idaho.                                                 42821.           5.6, 5.7, 5.10, 5.11, 5.12,
                                                                                   5.13, 5.14, 5.15, 7.1, 7.4,
                                                                                   7.9, 7.10, 8.1, 8.6, 9.1,
                                                                                   9.2, 9.6, 9.11, 26.22, 26.23,
                                                                                   26.26, 26.27, 26.28, and
                                                                                   26.29 only.
ITAFOS Conda LLC, Soda         T1-2016.0015...  3/2/2022.......  9/5/2025, 90 FR  Permit conditions 5.1, 5.4,
 Springs, Idaho.                                                  42821.           5.5, 5.11, 16.22, and 16.23
                                                                                   only.
Northwest Pipeline LLC, Soda   Compliance       9/1/2023.......  9/5/2025, 90 FR
 Springs, Idaho.                Agreement                         42821.
                                Schedule Case
                                No. E-
                                2023.0011.
P4 Production LLC, Soda        Compliance       11/27/2021.....  9/5/2025, 90 FR
 Springs, Idaho.                Agreement                         42821.
                                Schedule Case
                                No. E-
                                2023.0013.
P4 Production LLC, Soda        T1-2020.0029...  12/23/2021.....  9/5/2025, 90 FR  Permit conditions 4.2, 4.4,
 Springs, Idaho.                                                  42821.           4.5, 4.6, 4.7, 4.19, 4.20,
                                                                                   4.21, 13.22, and 13.23 only.
J.R. Simplot, Pocatello,       T1-2017.0024...  3/29/2023......  9/5/2025, 90 FR  Permit conditions 15.9, 15.10,
 Idaho.                                                           42821.           15.11, 15.19, 15.20, 15.21,
                                                                                   15.22, 15.25, 15.27, 16.6,
                                                                                   16.9, 16.10, 16.19, 16.20,
                                                                                   16.21, 16.22, 16.26, 16.27,
                                                                                   18.22, and 18.23 only.
Tamarack Mill LLC, New         T1-2019-0024...  10/17/2022.....  9/5/2025, 90 FR  Permit conditions 5.2, 5.3,
 Meadows, Idaho.                                                  42821.           5.5, 5.8, 5.17, 10.22, and
                                                                                   10.23 only.
The Amalgamated Sugar Company  P-2018.0011....  2/15/2023......  9/5/2025, 90 FR  Permit condition 4.8 only.
 LLC--Nampa Factory, Nampa,                                       42821.
 Idaho.
The Amalgamated Sugar Company  T1-2019-0020...  11/5/2021......  9/5/2025, 90 FR  Permit conditions 4.3, 4.4,
 LLC--Paul Factory, Paul,                                         42821.           4.5, 4.7, 4.9, 4.10, 4.11,
 Idaho.                                                                            4.12, 4.15, 4.16, 4.18,
                                                                                   11.22, and 11.23 only.
The Amalgamated Sugar Company  T1-2016.0017...  1/21/2022......  9/5/2025, 90 FR  Permit condition 4.9 and 5.2
 LLC--Twin Falls, Twin Falls,                                     42821.           only.
 Idaho.
----------------------------------------------------------------------------------------------------------------
\1\ EPA does not have the authority to remove these source-specific requirements in the absence of a
  demonstration that their removal would not interfere with attainment or maintenance of the NAAQS, violate any
  prevention of significant deterioration increment or result in visibility impairment. Idaho Department of
  Environmental Quality may request removal by submitting such a demonstration to EPA as a SIP revision.
\2\ Only a small portion of this facility is located on State lands. The vast majority of the facility is
  located in Indian Country. It is EPA's position that unless EPA has explicitly approved a program as applying
  in Indian country, State or local regulations or permits are not effective within the boundaries of that
  Indian country land for purposes of complying with the CAA. See 68 FR 2217, 2220 (January 16, 2003).

* * * * *
[FR Doc. 2026-10738 Filed 5-28-26; 8:45 am]
BILLING CODE 6560-50-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on May 29, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.