Notice2026-10653
Joshua Klein; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
May 29, 2026
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 103 (Friday, May 29, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 103 (Friday, May 29, 2026)]
[Notices]
[Pages 32042-32043]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-10653]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD26-2-000]
Joshua Klein; Notice of Preliminary Determination of a Qualifying
Conduit Hydropower Facility and Soliciting Comments and Motions To
Intervene
On May 18, 2026, Joshua Klein filed a notice of intent to construct
a
[[Page 32043]]
qualifying conduit hydropower facility, pursuant to section 30 of the
Federal Power Act (FPA). The proposed Cape Horn Mill Project would have
an installed capacity of up to 40 kilowatts (kW) and would be located
along the Boardman Canal, near Colfax, Placer County, California.
Applicant Contact: Joshua Klein, 26855 Cape Horn Road, Colfax,
California 95713, 858-652-9569, <a href="/cdn-cgi/l/email-protection#5a3728303529322f3b31363f33341a3d373b333674393537"><span class="__cf_email__" data-cfemail="87eaf5ede8f4eff2e6ecebe2eee9c7e0eae6eeeba9e4e8ea">[email protected]</span></a>.
FERC Contact: Christopher Chaney, 202-502-6778,
<a href="/cdn-cgi/l/email-protection#b7d4dfc5dec4c3d8c7dfd2c599d4dfd6d9d2cef7d1d2c5d499d0d8c1"><span class="__cf_email__" data-cfemail="ddbeb5afb4aea9b2adb5b8aff3beb5bcb3b8a49dbbb8afbef3bab2ab">[email protected]</span></a>.
Qualifying Conduit Hydropower Facility Description: The project
would consist of: (1) one turbine generating unit with a capacity of up
to 40 kW, (2) a 10-inch pipeline transporting water from Boardman Canal
to the unit and returning it to Boardman Canal, and (3) and appurtenant
facilities. The proposed project would have an estimated annual
generation of approximately 280 megawatt-hours
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................ The conduit the Y
facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i)............. The facility is Y
constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii)............ The facility has an Y
installed capacity
that does not exceed
40 megawatts.
FPA 30(a)(3)(C)(iii)........... On or before August 9, Y
2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed Cape Horn Mill Project will
not alter the primary purpose of the conduit, which is for
agricultural, municipal, and industrial consumption. Therefore, based
upon the above criteria, Commission staff preliminarily determines that
the operation of the project described above satisfies the requirements
for a qualifying conduit hydropower facility, which is not required to
be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments,
comments contesting whether the facility meets the qualifying criteria,
and motions to intervene: June 22, 2026, 5:00 p.m. Eastern Time.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS,'' ``COMMENTS CONTESTING
QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY,'' or ``MOTION TO
INTERVENE,'' as applicable; (2) state in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) state the name, address, and telephone number of the
person filing; and (4) otherwise comply with the requirements of
sections 385.2001 through 385.2005 of the Commission's regulations.\1\
All comments contesting Commission staff's preliminary determination
that the facility meets the qualifying criteria must set forth their
evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2025).
---------------------------------------------------------------------------
For public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, contact the Office
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#0b445b5b4b6d6e7968256c647d"><span class="__cf_email__" data-cfemail="e7a8b7b7a781829584c9808891">[email protected]</span></a>.
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at <a href="/cdn-cgi/l/email-protection#f3b5b6a1b0bc9d9f9a9d96a08683839c8187b395968190dd949c85"><span class="__cf_email__" data-cfemail="89cfccdbcac6e7e5e0e7ecdafcf9f9e6fbfdc9efecfbeaa7eee6ff">[email protected]</span></a>, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, MD 20852. A copy of all other filings
in reference to this application must be accompanied by proof of
service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
<a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number
(i.e., CD26-2) in the docket number field to access the document. You
may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. For assistance,
call toll-free 1-866-208-3676 or email <a href="/cdn-cgi/l/email-protection#2d6b687f6e6243414443487e585d5d425f596d4b485f4e034a425b"><span class="__cf_email__" data-cfemail="367073647579585a5f585365434646594442765053445518515940">[email protected]</span></a>. For
TTY, call (202) 502-8659.
(Authority: 18 CFR 2.1)
Dated: May 22, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-10653 Filed 5-28-26; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on May 29, 2026.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.