Columbia Gas Transmission, LLC; Notice of Request for Extension of Time

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
May 8, 2026

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 89 (Friday, May 8, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 89 (Friday, May 8, 2026)]
[Notices]
[Page 25356]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-09207]



[[Page 25356]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP25-35-002]


Columbia Gas Transmission, LLC; Notice of Request for Extension 
of Time

    Columbia states that following issuance of the March 3 Approval, 
construction was further delayed due to contractor availability 
constraints, as the originally planned contractor was no longer 
immediately available. Columbia asserts that it has since worked to 
rearrange construction activities and secure contractor resources; 
however, intermittent weather-related delays have also affected the 
Project schedule. Collectively, these factors have resulted in the need 
for additional time to complete the remaining construction activities. 
To date, Columbia has completed drilling Well 12653. The remaining work 
includes installing the connecting pipeline to ensure full integration 
with the storage field and readiness for service. Columbia's 
anticipated in-service date, based on the Project's current progress, 
is June 1, 2026.
    This notice establishes a 15-calendar day intervention and comment 
period deadline. Any person wishing to comment on Columbia's request 
for an extension of time may do so. No reply comments or answers will 
be considered. If you wish to obtain legal status by becoming a party 
to the proceedings for this request, you should, on or before the 
comment date stated below, file a motion to intervene in accordance 
with the requirements of the Commission's Rules of Practice and 
Procedure (18 CFR 385.214 or 385.211) and the Regulations under the 
Natural Gas Act (NGA) (18 CFR 157.10).
    As a matter of practice, the Commission itself generally acts on 
requests for extensions of time to complete construction for NGA 
facilities when such requests are contested before order issuance. For 
those extension requests that are contested,\1\ the Commission will aim 
to issue an order acting on the request within 45 days.\2\ The 
Commission will address all arguments relating to whether the applicant 
has demonstrated there is good cause to grant the extension.\3\ The 
Commission will not consider arguments that re-litigate the issuance of 
the certificate order, including whether the Commission properly found 
the project to be in the public convenience and necessity and whether 
the Commission's environmental analysis for the certificate complied 
with the National Environmental Policy Act (NEPA).\4\ At the time a 
pipeline requests an extension of time, orders on certificates of 
public convenience and necessity are final and the Commission will not 
re-litigate their issuance.\5\ The Director of the Office of Energy 
Projects, or his or her designee, will act on all of those extension 
requests that are uncontested.
---------------------------------------------------------------------------

    \1\ Contested proceedings are those where an intervenor disputes 
any material issue of the filing. 18 CFR 385.2201(c)(1).
    \2\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40 
(2020).
    \3\ Id. at P 40.
    \4\ Similarly, the Commission will not re-litigate the issuance 
of an NGA section 3 authorization, including whether a proposed 
project is not inconsistent with the public interest and whether the 
Commission's environmental analysis for the permit order complied 
with NEPA.
    \5\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40 
(2020).
---------------------------------------------------------------------------

    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>). From 
the Commission's Home Page on the internet, this information is 
available on eLibrary. The full text of this document is available on 
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or 
downloading. To access this document in eLibrary, type the docket 
number excluding the last three digits of this document in the docket 
number field.
    User assistance is available for eLibrary and the Commission's 
website during normal business hours from FERC Online Support at (202) 
502-6652 (toll free at 1-866-208-3676) or email at 
<a href="/cdn-cgi/l/email-protection#04626176676b6a686d6a61777174746b767044626176672a636b72"><span class="__cf_email__" data-cfemail="7a1c1f081915141613141f090f0a0a15080e3a1c1f0819541d150c">[email&#160;protected]</span></a>, or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at 
<a href="/cdn-cgi/l/email-protection#fa8a8f98969399d4889f9c9f889f94999f88959597ba9c9f8899d49d958c"><span class="__cf_email__" data-cfemail="8efefbece2e7eda0fcebe8ebfcebe0edebfce1e1e3cee8ebfceda0e9e1f8">[email&#160;protected]</span></a>.
    The Commission strongly encourages electronic filings of comments 
in lieu of paper using the ``eFile'' link at <a href="http://www.ferc.gov">http://www.ferc.gov</a>. In 
lieu of electronic filing, you may submit a paper copy which must 
reference the Project docket number.
    To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    To file via any other courier: Debbie-Anne A. Reese, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852.
    For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#1b544b4b5b7d7e6978357c746d"><span class="__cf_email__" data-cfemail="84cbd4d4c4e2e1f6e7aae3ebf2">[email&#160;protected]</span></a>.
    Comment Date: 5:00 p.m. Eastern Time on May 20, 2026.

(Authority: 18 CFR 2.1)

    Dated: May 5, 2026.
Carlos D. Clay,
Deputy Secretary.
[FR Doc. 2026-09207 Filed 5-7-26; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on May 8, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.