Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 66 (Tuesday, April 7, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 66 (Tuesday, April 7, 2026)]
[Notices]
[Pages 17639-17640]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-06706]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2454-088]


ALLETE, Inc.; Notice of Application Tendered for Filing With the 
Commission and Establishing Procedural Schedule for Relicensing and a 
Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.

[[Page 17640]]

    a. Type of Application: New Major License.
    b. Project No.: 2454-088.
    c. Date filed: March 24, 2026.
    d. Applicant: ALLETE, Inc. (ALLETE).
    e. Name of Project: Sylvan Hydroelectric Project (project).
    f. Location: The project is located on the Crow Wing River in Cass, 
Crow Wing, and Morrison Counties, Minnesota.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Greg Prom, Senior Environmental 
Compliance Specialist, Minnesota Power/ALLETE, Inc., 30 West Superior 
Street, Duluth, MN 55802-2093; Phone at (218) 355-3191 or email at 
<a href="/cdn-cgi/l/email-protection#96f1e6e4f9fbd6f7fafaf3e2f3b8f5f9fb"><span class="__cf_email__" data-cfemail="a8cfd8dac7c5e8c9c4c4cddccd86cbc7c5">[email&#160;protected]</span></a>.
    i. FERC Contact: David Graefe at (202) 502-6137; or email at 
<a href="/cdn-cgi/l/email-protection#1c787d6a7578327b6e7d797a795c7a796e7f327b736a"><span class="__cf_email__" data-cfemail="a7c3c6d1cec389c0d5c6c2c1c2e7c1c2d5c489c0c8d1">[email&#160;protected]</span></a>.
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: the project consists of: (1) a 1,211-acre 
reservoir; (2) a 78.0-foot-long left earth embankment with a concrete 
core wall; (3) a powerhouse with three 600-kilowatt generating units 
with a total installed capacity of 1.8 megawatts; (4) a 243.8-foot-long 
spillway with four vertical slide gates and two inflatable rubber dams; 
(5) a 41.0-foot-long right earth embankment with a concrete core wall; 
(6) a 730.0-foot-long earth embankment, approximately 4 to 6 feet tall; 
(7) an 830.0-foot-long earth embankment, about 4 to 6 feet tall with 
some sections up to 9 feet tall, with an auxiliary spillway; (8) an 
approximately 1,211-acre reservoir; and (9) appurtenant facilities.
    The project is operated in a run-of-river mode with an estimated 
annual energy production of approximately 9,963 megawatt hours. ALLETE 
proposes to continue to operate the project in a run-of-river mode.
    l. In addition to publishing the full text of this notice in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this notice, as well 
as other documents in the proceeding (e.g., license application) via 
the internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>), 
using the ``eLibrary'' link. Enter the docket number, excluding the 
last three digits in the docket number field to access the document (P-
2454). For assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#15535047565a7b797c7b70466065657a676155737067763b727a63"><span class="__cf_email__" data-cfemail="b3f5f6e1f0fcdddfdaddd6e0c6c3c3dcc1c7f3d5d6c1d09dd4dcc5">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#b6f9e6e6f6d0d3c4d598d1d9c0"><span class="__cf_email__" data-cfemail="91dec1c1d1f7f4e3f2bff6fee7">[email&#160;protected]</span></a>.
    n. Procedural Schedule: The application will be processed according 
to the following preliminary schedule. Revisions to the schedule will 
be made as appropriate.

------------------------------------------------------------------------
              Milestone                              Target
------------------------------------------------------------------------
Deficiency Letter (if necessary).....  July 2026.
Additional Information Request (if     July 2026.
 necessary).
Notice of Acceptance/Notice of Ready   September 2026.
 for Environmental Analysis.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

(Authority: 18 CFR 2.1)

    Dated: April 2, 2026.
Carlos D. Clay,
Deputy Secretary.
[FR Doc. 2026-06706 Filed 4-6-26; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on April 7, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.