Air Plan Approval; Ohio; Ohio Permit Rules Revisions
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The Environmental Protection Agency (EPA) is approving revisions to Ohio air permitting rules into the State Implementation Plan (SIP) under the Clean Air Act (CAA). These revisions represent changes to the air permitting rules the Ohio Environmental Protection Agency (Ohio EPA) adopted on March 1, 2023, and July 25, 2025, which became effective at the State level on March 11, 2023, and August 14, 2025, respectively. These revisions will result in consistent requirements of rules at both the State and Federal level. The EPA proposed to approve this action on January 9, 2026, and received no adverse comments.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 63 (Thursday, April 2, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 63 (Thursday, April 2, 2026)]
[Rules and Regulations]
[Pages 16550-16553]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-06398]
[[Page 16550]]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R05-OAR-2025-0143; FRL-13000-02-R5]
Air Plan Approval; Ohio; Ohio Permit Rules Revisions
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is approving
revisions to Ohio air permitting rules into the State Implementation
Plan (SIP) under the Clean Air Act (CAA). These revisions represent
changes to the air permitting rules the Ohio Environmental Protection
Agency (Ohio EPA) adopted on March 1, 2023, and July 25, 2025, which
became effective at the State level on March 11, 2023, and August 14,
2025, respectively. These revisions will result in consistent
requirements of rules at both the State and Federal level. The EPA
proposed to approve this action on January 9, 2026, and received no
adverse comments.
DATES: This final rule is effective on May 4, 2026.
ADDRESSES: The EPA has established a docket for this action under
Docket ID No. EPA-R05-OAR-2025-0143. All documents in the docket are
listed on the <a href="https://www.regulations.gov">https://www.regulations.gov</a> website. Although listed in
the index, some information is not publicly available, i.e.,
Confidential Business Information (CBI), Proprietary Business
Information (PBI), or other information whose disclosure is restricted
by statute. Certain other material, such as copyrighted material, is
not placed on the internet and will be publicly available only in hard
copy form. Publicly available docket materials are available either
through <a href="https://www.regulations.gov">https://www.regulations.gov</a> or at the Environmental Protection
Agency, Region 5, Air and Radiation Division, 77 West Jackson
Boulevard, Chicago, Illinois 60604. This facility is open from 8:30
a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays.
We recommend that you telephone Skyler Sanderson, at (312) 886-4454,
before visiting the Region 5 office.
FOR FURTHER INFORMATION CONTACT: Skyler Sanderson, Air and Radiation
Division (AR-18J), Environmental Protection Agency, Region 5, 77 West
Jackson Boulevard, Chicago, Illinois 60604, telephone number: (312)
886-4454, email address: <a href="/cdn-cgi/l/email-protection#dfacbeb1bbbaadacb0b1f1acb4a6b3baad9fbaafbef1b8b0a9"><span class="__cf_email__" data-cfemail="1665777872736465797838657d6f7a73645673667738717960">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: Throughout this document whenever ``we,''
``us,'' or ``our'' is used, we mean the EPA.
I. Background Information
On January 9, 2026 (91 FR 937), the EPA proposed to approve
revisions submitted on March 19, 2025, and August 5, 2025, to Ohio's
air permitting rules into the SIP under the CAA, including
incorporating by reference Ohio rule(s) 3745-31-01 [with the exception
of OAC 3745-31-01(A)(8), (E)(3)(b)(ii) and (iii), (M)(10)(a)(ii),
(P)(12), (Q), and (S)(11)], 3745-31-02, 3745-31-03 [with the exception
of OAC 3745-31-03(B)(1)(p)], 3745-31-05 [with the exception of OAC
3745-31-05(E)], 3745-31-06, 3745-31-07, 3745-31-09, 3745-31-10, 3745-
31-11, 3745-31-12, 3745-31-13 [with the exception of OAC 3745-31-
13(H)(1)(c)], 3745-31-14, 3745-31-15, 3745-31-16, 3745-31-17, 3745-31-
18, 3745-31-19, 3745-31-20, 3745-31-21, 3745-31-22 [with the exception
of OAC 3745-31-22(A)(3)(b)], 3745-31-23 [with the exception of the 1-
hour NO<INF>2</INF> SIL in 3745-31-23(A)], 3745-31-24 [with the
exception of OAC 3745-31-24(F)], 3745-31-25, 3745-31-26 [with the
exception of OAC 3745-31-26(D)], 3745-31-27 [with the exception of OAC
3745-31-27(A)(1)(b)], 3745-31-28, 3745-31-29, 3745-31-30, and 3745-31-
32. An explanation of the CAA requirements, a detailed analysis of the
revisions, and the EPA's reasons for proposing approval were provided
in the notice of proposed rulemaking and will not be restated here. The
public comment period for this proposed rule ended on February 9, 2026.
The EPA received no comments on the proposal.
II. Final Action
The EPA is approving Ohio EPA's March 19, 2025, and August 5, 2025,
submittals as revisions to its existing SIP. The EPA finds that the
revisions are consistent with Federal requirements. As requested by
Ohio EPA, the following provisions are not included in this proposed
approval: OAC 3745-31-01(A)(8), (E)(3)(b)(ii) and (iii),
(M)(10)(a)(ii), (P)(12), (Q), and (S)(11); 3745-31-03(B)(1)(p); 3745-
31-05(E); 3745-31-13(H)(1)(c); 3745-31-22(A)(3)(b); 1-hour
NO<INF>2</INF> SIL in 3745-31-23(A); 3745-31-24(F); 3745-31-26(D);
3745-31-27(A)(1)(b); and 3745-31-34(B), (C), and (D).
III. Incorporation by Reference
In this rule, the EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, the EPA is finalizing the incorporation by reference of the Ohio
Regulations described in section I. of this preamble and set forth in
the amendments to 40 CFR part 52 below. The EPA has made, and will
continue to make, these documents generally available through <a href="https://www.regulations.gov">https://www.regulations.gov</a>, and at the EPA Region 5 Office (please contact the
person identified in the FOR FURTHER INFORMATION CONTACT section of
this preamble for more information). Therefore, these materials have
been approved by the EPA for inclusion in the SIP, have been
incorporated by reference by the EPA into that plan, are fully
federally enforceable under sections 110 and 113 of the CAA as of the
effective date of the final rulemaking of the EPA's approval, and will
be incorporated by reference in the next update to the SIP
compilation.\1\
---------------------------------------------------------------------------
\1\ 62 FR 27968 (May 22, 1997).
---------------------------------------------------------------------------
IV. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the CAA and applicable
Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, the EPA's role is to approve State choices,
provided that they meet the criteria of the CAA. Accordingly, this
action merely approves State law as meeting Federal requirements and
does not impose additional requirements beyond those imposed by State
law. For these reasons, this action:
<bullet> Is not a significant regulatory action subject to review
by the Office of Management and Budget under Executive Order 12866 (58
FR 51735, October 4, 1993);
<bullet> Is not subject to Executive Order 14192 (90 FR 9065,
February 6, 2025) because SIP actions are exempt from review under
Executive Order 12866;
<bullet> Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
<bullet> Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
<bullet> Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
<bullet> Does not have federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
[[Page 16551]]
<bullet> Is not subject to Executive Order 13045 (62 FR 19885,
April 23, 1997) because it approves a State program;
<bullet> Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001); and
<bullet> Is not subject to requirements of section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA.
In addition, the SIP is not approved to apply on any Indian
reservation land or in any other area where the EPA or an Indian Tribe
has demonstrated that a Tribe has jurisdiction. In those areas of
Indian country, the rule does not have Tribal implications and will not
impose substantial direct costs on Tribal governments or preempt Tribal
law as specified by Executive Order 13175 (65 FR 67249, November 9,
2000).
This action is subject to the Congressional Review Act, and the EPA
will submit a rule report to each House of the Congress and to the
Comptroller General of the United States. This action is not a ``major
rule'' as defined by 5 U.S.C. 804(2).
Under section 307(b)(1) of the CAA, petitions for judicial review
of this action must be filed in the United States Court of Appeals for
the appropriate circuit by June 1, 2026. Filing a petition for
reconsideration by the Administrator of this final rule does not affect
the finality of this action for the purposes of judicial review nor
does it extend the time within which a petition for judicial review may
be filed, and shall not postpone the effectiveness of such rule or
action. This action may not be challenged later in proceedings to
enforce its requirements. (See section 307(b)(2).)
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon oxides,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
oxides, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: March 26, 2026.
Cheryl Newton,
Acting Regional Administrator, Region 5.
For the reasons stated in the preamble, title 40 CFR part 52 is
amended as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
0
2. In Sec. 52.1870, amend the table in paragraph (c) by revising the
section ``Chapter 3745-31 Permit-to Install New Sources and Permit-to-
Install and Operate Program'', consisting of entries 3745-31-01 through
2745-31-34, to read as follows:
Sec. 52.1870 Identification of plan.
* * * * *
(c) * * *
EPA-Approved Ohio Regulations
----------------------------------------------------------------------------------------------------------------
Ohio effective
Ohio citation Title/subject date EPA Approval date Notes
----------------------------------------------------------------------------------------------------------------
* * * * * * *
----------------------------------------------------------------------------------------------------------------
Chapter 3745-31 Permit-to-Install New Sources and Permit-to-Install and Operate Program
----------------------------------------------------------------------------------------------------------------
3745-31-01................. Definitions.......... 3/11/2023 4/2/2026, 91 FR Except for (A)(8),
[Insert Federal (E)(3)(b)(ii) and
Register page where (iii),
the document begins]. (M)(10)(a)(ii),
(P)(12), (Q), and
(S)(11).
3745-31-02................. Applicability, 3/11/2023 4/2/2026, 91 FR
requirements, and [Insert Federal
obligations. Register page where
the document begins].
3745-31-03................. Exemptions........... 8/14/2025 4/2/2026, 91 FR Except for (B)(1)(p).
[Insert Federal
Register page where
the document begins].
3745-31-04................. Applications......... 5/29/2014 6/25/2015, 80 FR
36477.
3745-31-05................. Criteria for decision 3/11/2023 4/2/2026, 91 FR Except for (E).
by the Director. [Insert Federal
Register page where
the document begins].
3745-31-06................. Completeness 3/11/2023 4/2/2026, 91 FR
determinations, [Insert Federal
processing Register page where
requirements, public the document begins].
participation,
public notice, and
issuance.
3745-31-07................. Termination, 3/11/2023 4/2/2026, 91 FR
revocation, [Insert Federal
expiration, renewal, Register page where
revision and the document begins].
transfer.
3745-31-08................. Registration status 5/29/2014 6/25/2015, 80 FR
permit-to-operate. 36477.
3745-31-09................. Variances on 3/11/2023 4/2/2026, 91 FR
operation. [Insert Federal
Register page where
the document begins].
3745-31-10................. NSR projects at 3/11/2023 4/2/2026, 91 FR
existing emissions [Insert Federal
units at a major Register page where
stationary source. the document begins].
3745-31-11................. Attainment 3/11/2023 4/2/2026, 91 FR
provisions--ambient [Insert Federal
air increments, Register page where
ceilings, and the document begins].
classifications.
3745-31-12................. Attainment 3/11/2023 4/2/2026, 91 FR
provisions--data [Insert Federal
submission Register page where
requirements. the document begins].
[[Page 16552]]
3745-31-13................. Attainment 3/11/2023 4/2/2026, 91 FR Except for (H)(1)(c).
provisions--review [Insert Federal
of major stationary Register page where
sources and major the document begins].
modifications,
stationary source
applicability, and
exemptions.
3745-31-14................. Attainment 3/11/2023 4/2/2026, 91 FR
provisions--pre- [Insert Federal
application analysis. Register page where
the document begins].
3745-31-15................. Attainment 3/11/2023 4/2/2026, 91 FR
provisions--control [Insert Federal
technology review. Register page where
the document begins].
3745-31-16................. Attainment 3/11/2023 4/2/2026, 91 FR .....................
provisions--major [Insert Federal
stationary source Register page where
impact analysis. the document begins].
3745-31-17................. Attainment 3/11/2023 4/2/2026, 91 FR
provisions--addition [Insert Federal
al impact analysis. Register page where
the document begins].
3745-31-18................. Attainment 3/11/2023 4/2/2026, 91 FR
provisions--air [Insert Federal
quality models. Register page where
the document begins].
3745-31-19................. Attainment 3/11/2023 4/2/2026, 91 FR
provisions--notice [Insert Federal
to the United States Register page where
environmental the document begins].
protection agency.
3745-31-20................. Attainment 3/11/2023 4/2/2026, 91 FR
provisions--innovati [Insert Federal
ve control Register page where
technology. the document begins].
3745-31-21................. Nonattainment 3/11/2023 4/2/2026, 91 FR
provisions--review [Insert Federal
of major stationary Register page where
sources and major the document begins].
modifications--stati
onary source
applicability and
exemptions.
3745-31-22................. Nonattainment 3/11/2023 4/2/2026, 91 FR Except for (A)(3)(b).
provisions--conditio [Insert Federal
ns for approval. Register page where
the document begins].
3745-31-23................. Nonattainment 3/11/2023 4/2/2026, 91 FR Except for 1-hour NO2
provisions--stationa [Insert Federal SIL in (A).
ry sources locating Register page where
in designated clean the document begins].
or unclassifiable
areas which would
cause or contribute
to a violation of a
national ambient air
quality standard.
3745-31-24................. Nonattainment 3/11/2023 4/2/2026, 91 FR Except for (F).
provisions--baseline [Insert Federal
for determining Register page where
credit for emission the document begins].
and air quality
offsets.
3745-31-25................. Nonattainment 3/11/2023 4/2/2026, 91 FR
provisions--location [Insert Federal
of offsetting Register page where
emissions. the document begins].
3745-31-26................. Nonattainment 3/11/2023 4/2/2026, 91 FR Except for (D).
provisions--offset [Insert Federal
ratio requirements. Register page where
the document begins].
3745-31-27................. Nonattainment 3/11/2023 4/2/2026, 91 FR Except for (A)(1)(b).
provisions--administ [Insert Federal
rative procedures Register page where
for emission offsets. the document begins].
3745-31-28................. Review of major 3/11/2023 4/2/2026, 91 FR
stationary sources [Insert Federal
of hazardous air Register page where
pollutants requiring the document begins].
MACT determinations.
3745-31-29................. General permit-to- 3/11/2023 4/2/2026, 91 FR
install and general [Insert Federal
PTIO. Register page where
the document begins].
3745-31-30................. Permits-by-rule...... 3/11/2023 4/2/2026, 91 FR
[Insert Federal
Register page where
the document begins].
3745-31-32................. Plantwide 3/11/2023 4/2/2026, 91 FR
applicability limit. [Insert Federal
Register page where
the document begins].
3745-31-34................. Permits to install 3/31/2011 2/14/2020, 85 FR 8406 Except for (B), (C),
for major stationary and (D).
sources and major
modifications of
sources emitting
greenhouse gases.
[[Page 16553]]
* * * * * * *
----------------------------------------------------------------------------------------------------------------
* * * * *
[FR Doc. 2026-06398 Filed 4-1-26; 8:45 am]