Notice2026-04662
Banister Hydro, Inc.; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
March 10, 2026
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 46 (Tuesday, March 10, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 46 (Tuesday, March 10, 2026)]
[Notices]
[Pages 11543-11544]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-04662]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9028-012]
Banister Hydro, Inc.; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 9028-012.
c. Date filed: July 26, 2024.
d. Applicant: Banister Hydro, Inc. (Banister Hydro).
e. Name of Project: Halifax Hydroelectric Project (Halifax Project
or project).
f. Location: On the Banister River, near the Town of Halifax in
Halifax County, Virginia.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Sherri Loon, Coordinator of Operations--USA,
Banister Hydro, Inc c/o KEI (USA) Power Management Inc., 423 Brunswick
Ave., Gardiner, ME 04345; (207) 203-3026; <a href="/cdn-cgi/l/email-protection#186b707d6a6a71367477777658736a6d7f7d6a367b7775"><span class="__cf_email__" data-cfemail="d4a7bcb1a6a6bdfab8bbbbba94bfa6a1b3b1a6fab7bbb9">[email protected]</span></a> or
Lewis Loon, General Manager, Operations and Maintenance--USA, Banister
Hydro, Inc. c/o KEI (USA) Power Management Inc., 423 Brunswick Ave.,
Gardiner, ME 04345; (207) 203-3027; <a href="/cdn-cgi/l/email-protection#e48881938d97ca888b8b8aa48f9691838196ca878b89"><span class="__cf_email__" data-cfemail="49252c3e203a672526262709223b3c2e2c3b672a2624">[email protected]</span></a>.
i. FERC Contact: Chris Millard at (202) 502-8256, or
<a href="/cdn-cgi/l/email-protection#d8bbb0aab1abacb7a8b0bdaaf6b5b1b4b4b9aabc98bebdaabbf6bfb7ae"><span class="__cf_email__" data-cfemail="8deee5ffe4fef9e2fde5e8ffa3e0e4e1e1ecffe9cdebe8ffeea3eae2fb">[email protected]</span></a>.
j. Deadline for filing comments, recommendations, terms and
conditions, and fishway prescriptions: on or before 5:00 p.m. Eastern
Time on May 4, 2026; reply comments are due on or before 5:00 p.m.
Eastern Time June 18, 2026.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief comments up to 10,000
characters, without prior registration, using the eComment system at
<a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please
contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#02444750414d6c6e6b6c67517772726d707642646770612c656d74"><span class="__cf_email__" data-cfemail="bafcffe8f9f5d4d6d3d4dfe9cfcacad5c8cefadcdfc8d994ddd5cc">[email protected]</span></a>, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, you may submit a paper copy. Submissions sent via the U.S.
Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426. Submissions sent via any other carrier must be
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
All filings must clearly identify the project name and docket number on
the first page: Halifax Hydroelectric Project (P-9028-012).
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted and is ready for
environmental analysis at this time.
l. The Halifax Hydroelectric Project consists of the following
existing facilities: (1) a 682-foot-long and 36-foot-high dam, with a
301-foot-long concrete spillway (consisting of a 24-foot-long fixed
weir, twelve 3-foot-wide piers, eleven 20-foot-wide gated bays, and a
21-foot-long fixed weir), a 73-foot-8-inch-long integral powerhouse and
intake structure, and a 307-foot-8-inch-long non-overflow structure
(consisting of a 57-foot-6-inch-long concrete gravity wall, 203-foot-2-
inch-long sheet pile cells with earthfill, and a 47-foot-long earthfill
section); (2) an approximately 374-acre impoundment with a gross
storage capacity of 3,510 acre-feet at a normal water surface elevation
of 351.3 feet mean sea level (MSL); \1\ (3) two 455-kilowatt (kW)
turbine-generator units and a 875-kW turbine-generator unit for a total
installed capacity of 1,785 kW; (4) a 486-foot-long, 4.16-kilovolt (kV)
generator lead connecting to a 4.16/13.2-kV transformer, and a 26-foot-
long, 13.2-kV transmission line connecting to the local distribution
system; and (5) appurtenant facilities.
---------------------------------------------------------------------------
\1\ In a revised Exhibit A filed May 22, 2025, Banister Hydro
states that elevation data expressed as MSL are equal to that of the
National Geodetic Vertical Datum of 1929 at the Halifax Project.
---------------------------------------------------------------------------
The Halifax Project operates in a run-of-river mode with a
continuous minimum flow of 5 cubic feet per second (cfs), or inflow,
whichever is less. There is minimal to no available usable storage
behind the dam and if river flow is less than 135 cfs, all water is
spilled over the dam. The project is typically operated remotely in
automatic control mode. Banister Hydro is not proposing any new project
facilities or changes to the operation of the project.
From 2019 to 2023, average annual generation at the Halifax Project
was 2,403 megawatt-hours.
m. A copy of the application can be viewed on the Commission's
website at (<a href="http://www.ferc.gov">http://www.ferc.gov</a>), using the ``eLibrary'' link. Enter
the docket number, excluding the last three digits in the docket number
field, to access the document (P-9028). For assistance, contact FERC
Online Support (see item j above).
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; and (3) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. Each filing must be accompanied by proof of service
on all persons listed on the service list prepared by the Commission in
this proceeding in accordance with 18 CFR 4.34(b) and 385.2010.
For public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, contact the Office
of Public Participation at (202) 502-6595, or <a href="/cdn-cgi/l/email-protection#b8f7e8e8f8deddcadb96dfd7ce"><span class="__cf_email__" data-cfemail="551a050515333027367b323a23">[email protected]</span></a>.
You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. The license applicant must file the following on or before 5:00
p.m. Eastern Time May 4, 2026: (1) a copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying
[[Page 11544]]
agency received the request; or (3) evidence of waiver of water quality
certification.
o. Final amendments to the application must be filed with the
Commission on or before 5:00 p.m. Eastern Time on April 6, 2026.
(Authority: 18 CFR 2.1)
Dated: March 5, 2026.
Carlos D. Clay,
Deputy Secretary.
[FR Doc. 2026-04662 Filed 3-9-26; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on March 10, 2026.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.