Notice2026-04642

Certification Notice-264; Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
March 10, 2026

Issuing agencies

Energy Department

Abstract

On August 26, 2025, CPV Basin Ranch, LLC (CPV Basin Ranch), as owner and operator of the CPV Basin Ranch Energy Center, a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE). The Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 46 (Tuesday, March 10, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 46 (Tuesday, March 10, 2026)]
[Notices]
[Pages 11536-11537]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-04642]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Certification Notice--264]


Certification Notice--264; Notice of Filing of Self-Certification 
of Coal Capability Under the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity, Department of Energy.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: On August 26, 2025, CPV Basin Ranch, LLC (CPV Basin Ranch), as 
owner and operator of the CPV Basin Ranch Energy Center, a new baseload 
electric generating powerplant,

[[Page 11537]]

submitted a coal capability self-certification to the Department of 
Energy (DOE). The Powerplant and Industrial Fuel Use Act of 1978 (FUA), 
as amended, and regulations thereunder require DOE to publish a notice 
of filing of self-certification in the Federal Register.

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, by contacting the Office 
of Electricity by electronic mail to <a href="/cdn-cgi/l/email-protection#f5b099909681879c969c818cdbb08d859a878186b59d84db919a90db929a83"><span class="__cf_email__" data-cfemail="c287aea7a1b6b0aba1abb6bbec87bab2adb0b6b182aab3eca6ada7eca5adb4">[email&#160;protected]</span></a>.

FOR FURTHER INFORMATION CONTACT: Marina Fennel at (240) 702-6156, 
<a href="/cdn-cgi/l/email-protection#ce8ba2abadbabca7ada7bab7e08bb6bea1bcbabd8ea6bfe0aaa1abe0a9a1b8"><span class="__cf_email__" data-cfemail="d89db4bdbbacaab1bbb1aca1f69da0a8b7aaacab98b0a9f6bcb7bdf6bfb7ae">[email&#160;protected]</span></a>.

SUPPLEMENTARY INFORMATION: On August 26, 2025, CPV Basin Ranch, as 
owner and operator of a new baseload electric generating powerplant, 
submitted a coal capability self-certification to the DOE pursuant to 
Sec.  201(d) of the Powerplant and Industrial Fuel Use Act of 1978 
(FUA), as amended (42 U.S.C. 8311(d)), and DOE regulations in 10 CFR 
501.61(a). The FUA and regulations thereunder require DOE to publish a 
notice of filing of self-certification in the Federal Register. See 42 
U.S.C. 8311(d)(1); 10 CFR 501.61(c). Section 201(a) of the FUA provides 
that ``no new base load electric powerplant may be constructed or 
operated without the capability to use coal or another alternate fuel 
as a primary energy source.'' 42 U.S.C. 8311(a). Pursuant to section 
201(d) of the FUA, in order to meet the requirement of coal capability, 
the owner or operator of such a facility proposing to use natural gas 
or petroleum as its primary energy source shall certify to the 
Secretary of Energy (Secretary) prior to construction, or prior to 
operation as a base load electric powerplant, that such powerplant has 
the capability to use coal or another alternate fuel. See 42 U.S.C. 
8311(d)(1). Such certification establishes compliance with FUA section 
201(a) as of the date it is filed with the Secretary. Id.; 10 CFR 
501.61(b). The following owner of a proposed new baseload electric 
generating powerplant has filed a self-certification of coal-capability 
with DOE pursuant to FUA section 201(d) and in accordance with DOE 
regulations at 10 CFR 501.61:

Owner: CPV Basin Ranch, LLC
Design Capacity: Seasonal average capacity of 1,350 megawatts
Fuel To Be Used: Natural gas
Plant Location: 535 Private Road 177, Pecos, TX 79772
In-Service Date: December 2028

Signing Authority

    This document of the Department of Energy was signed on February 6. 
2026, by Catherine Jereza, Assistant Secretary, Office of Electricity, 
pursuant to delegated authority from the Secretary of Energy. That 
document with the original signature and date is maintained by DOE. For 
administrative purposes only, and in compliance with requirements of 
the Office of the Federal Register, the undersigned DOE Federal 
Register Liaison Officer has been authorized to sign and submit the 
document in electronic format for publication, as an official document 
of the Department of Energy. This administrative process in no way 
alters the legal effect of this document upon publication in the 
Federal Register.

    Signed in Washington, DC on March 6, 2026.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2026-04642 Filed 3-9-26; 8:45 am]
BILLING CODE 6450-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on March 10, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.