Farmington River Power Company; Notice of Pending Jurisdictional Inquiry and Soliciting Comments, Protests, and Motions To Intervene

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
January 9, 2026

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 6 (Friday, January 9, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 6 (Friday, January 9, 2026)]
[Notices]
[Pages 992-993]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-00266]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. UL26-1-000]


Farmington River Power Company; Notice of Pending Jurisdictional 
Inquiry and Soliciting Comments, Protests, and Motions To Intervene

    On November 3, 2025, the Federal Energy Regulatory Commission 
(Commission) received a request from Save the Sound for an updated 
jurisdictional determination for the unlicensed Rainbow Dam 
Hydroelectric Project. The project is located on the Farmington River, 
a tributary of the Connecticut River, in Hartford County, Connecticut.
    Pursuant to section 23(b)(1) of the Federal Power Act (FPA),\1\ a 
non-federal hydroelectric project must be licensed if it: (a) is 
located on a navigable water of the United States; (b) occupies lands 
or reservations of the United States; (c) utilizes surplus water or 
waterpower from a government dam; \2\ or (d) is located on a stream 
over which Congress has Commerce Clause jurisdiction, is constructed or 
modified on or after August 26, 1935, and affects the interests of 
interstate or foreign commerce.
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 817(1).
    \2\ A project that meets condition (a), (b), or (c) is not 
required to be licensed if it holds a still valid pre-1920 federal 
permit.
---------------------------------------------------------------------------

    A stream is navigable under section 3(8) of the FPA \3\ if: (1) it 
is currently being used or is suitable for use, or (2) it has been used 
or was suitable for use in the past, or (3) it could be made suitable 
for use in the future by reasonable improvements to transport persons 
or property in interstate or foreign commerce.\4\ Navigability under 
section 3(8) of the FPA is not destroyed by obstructions or disuse of 
many years; personal or private use may be sufficient to demonstrate 
the availability of the river for commercial navigation; and the 
seasonal floatation of logs is sufficient to determine that a river is 
navigable.
---------------------------------------------------------------------------

    \3\ 16 U.S.C. 796(8).
    \4\ See Rochester Gas & Elec. Corp., 344 F.2d 594, 596 (2d Cir. 
1965).
---------------------------------------------------------------------------

    Regarding condition (d) above, for purposes of FPA section 
23(b)(1), headwaters and tributaries of navigable waters are Commerce 
Clause streams; \5\ ``post-1935'' construction or modification at an 
existing project includes enlarging a project, such as increasing size 
of the reservoir, height of the dam, or generating capacity; \6\ and 
projects that generate energy for transmission on the interstate grid 
affect interstate commerce.\7\
---------------------------------------------------------------------------

    \5\ FPC v. Union Electric Co., 381 U.S. 90, 94-96 (1965).
    \6\ See, e.g., L.S. Starrett Co. v. FERC, 650 F.3d 19, 26-27 
(1st Cir. 2011); Cent. Vt. Pub. Serv. Corp., 54 FERC ] 61,132, at 
61,434 (1991) (citing Puget Sound Power & Light Co. v. FPC, 557 F.2d 
1311 (9th Cir. 1977); Aquenergy Systems, Inc., 29 FERC ] 61,026 
(1984)).
    \7\ See FPC v. Union Elec. Co., 381 U.S. at 94-95. Moreover, it 
is well settled that small hydroelectric projects that are connected 
to the interstate grid, even if they have no interstate sales, 
affect interstate commerce by displacing power from the grid, and 
the cumulative effect of the national class of these small projects 
is significant for purposes of FPA section 23(b)(1). See Habersham 
Mills v. FERC, 976 F.2d 1381, 1384-85 (11th Cir. 1992).
---------------------------------------------------------------------------

    Commission staff previously investigated the Commission's 
jurisdiction over the Rainbow Dam Project in the 1970s and determined 
that licensing was not required, noting that there was insufficient 
evidence that the Farmington River was navigable at the project.\8\ 
Save the Sound requests that the Commission reexamine the navigability 
of the Farmington River at

[[Page 993]]

the site of the Rainbow Dam Project, specifically considering the 
river's historic and current use or suitability for commercial use.\9\ 
A stream's suitability for commercial use can be demonstrated based on 
its physical characteristics, as well as its actual use or suitability 
for use for recreational boating, if this information shows the river 
is suitable for the simpler types of commercial navigation.\10\ 
Additionally, Save the Sound requests that the Commission reexamine its 
jurisdiction on the grounds that the Rainbow Dam Project is located on 
a stream over which Congress has Commerce Clause jurisdiction, was 
modified to increase its water storage capacity on or after August 26, 
1935, and affects the interests of interstate or foreign commerce.\11\
---------------------------------------------------------------------------

    \8\ See Farmington River Power Co., 49 F.P.C. 389 (1973); but 
see Farmington River Power Co., 44 F.P.C. 1393 (1970) (finding 
licensing required based on the retroactive application of the 1935 
amendments to section 23(b) of the FPA requiring licensing for 
projects located on non-navigable streams that affect interstate 
commerce), vacated by Farmington River Power Co. v. FPC, 455 F.2d 86 
(2d. Cir. 1972) (holding that the 1935 amendment to section 23(b) 
had no retroactive effect and vacating Commission's 1970 order 
finding licensing required).
    \9\ In 1996, Commission staff determined that the Farmington 
River is a navigable waterway of the United States ``from north of 
the Colebrook Reservoir . . . into the Connecticut River.'' The 
Collinsville Co., 76 FERC ] 62,117 (1996). The Colebrook Reservoir 
is located on the West Branch of the Farmington River, approximately 
73 river miles above the Rainbow Dam Project.
    \10\ See FPL Energy Me. Hydro LLC v. FERC, 287 F.3d 1151, 1158 
(D.C. Cir. 2002) (affirming navigability finding based on stream 
characteristics and test trips by canoe).
    \11\ Save the Sound November 3, 2025 Request for Updated 
Determination of Jurisdiction for the Rainbow Project at 7-9.
---------------------------------------------------------------------------

    In response to Save the Sound's request, Commission staff is 
investigating the jurisdictional status of the Rainbow Dam 
Hydroelectric Project (UL26-1-000). A copy of Save the Sound's request 
may be viewed on the Commission's website at <a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number, UL26-1-000. You may also 
register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
<a href="/cdn-cgi/l/email-protection#470102150408292b2e292214323737283533072122352469202831"><span class="__cf_email__" data-cfemail="d99f9c8b9a96b7b5b0b7bc8aaca9a9b6abad99bfbcabbaf7beb6af">[email&#160;protected]</span></a>, for TTY, call (202) 502-8659.
    The Commission is soliciting comments, motions to intervene, and 
protests in this proceeding. Comments, motions to intervene, and 
protests must be filed by 45 days from notice or February 20, 2026, by 
5:00 p.m. Eastern Time. Anyone may submit comments, a protest, or a 
motion to intervene in accordance with the requirements of Rules and 
Practice and Procedure, 18 CFR 385.210, 211, and 214. In determining 
the appropriate action to take, the Commission will consider all 
protests or comments filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceedings. Any comments, protests, or motions to intervene 
must be received on or before the specified comment date.
    The Commission strongly encourages electronic filing. Please file 
comments, protests, and motions to intervene using the Commission's 
eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at <a href="/cdn-cgi/l/email-protection#6c2a293e2f2302000502093f191c1c031e182c0a091e0f420b031a"><span class="__cf_email__" data-cfemail="7b3d3e293834151712151e280e0b0b14090f3b1d1e0918551c140d">[email&#160;protected]</span></a>, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any 
filing should include Docket Number UL26-1-000.
    For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#89c6d9d9c9efecfbeaa7eee6ff"><span class="__cf_email__" data-cfemail="26697676664043544508414950">[email&#160;protected]</span></a>.
    For further information, please contact Kelly Fitzpatrick at (202) 
502-8435 or <a href="/cdn-cgi/l/email-protection#cda6a8a1a1b4e3aba4b9b7bdacb9bfa4aea68daba8bfaee3aaa2bb"><span class="__cf_email__" data-cfemail="1a717f767663347c736e606a7b6e687379715a7c7f6879347d756c">[email&#160;protected]</span></a>.

(Authority: 18 CFR 2.1)

    Dated: January 6, 2026.
Carlos D. Clay,
Deputy Secretary.
[FR Doc. 2026-00266 Filed 1-8-26; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>