Notice2025-21051

Forestport Hydro, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
November 25, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 225 (Tuesday, November 25, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 225 (Tuesday, November 25, 2025)]
[Notices]
[Pages 53286-53287]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-21051]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4900-090]


Forestport Hydro, LLC; Notice of Application Ready for 
Environmental Analysis and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License.
    b. Project No.: 4900-090.
    c. Date Filed: February 27, 2025.
    d. Applicant: Forestport Hydro, LLC.
    e. Name of Project: Forestport Hydroelectric Project.
    f. Location: On the Black River in Oneida County, New York.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r)
    h. Applicant Contact: Antonio Zarella, Chief Operating Officer, 
Forestport Hydro, LLC, 230 Park Avenue, Suite 447, New York, NY 10169; 
telephone at (315) 247-0253; email at <a href="/cdn-cgi/l/email-protection#46121c0634232a233027322336293123346825292b"><span class="__cf_email__" data-cfemail="7f2b253f0d1a131a091e0b1a0f10081a0d511c1012">[email&#160;protected]</span></a>.
    i. FERC Contact: Erin Mocko, Project Coordinator, Great Lakes 
Branch, Division of Hydropower Licensing; telephone at (202) 502-8107; 
email at <a href="/cdn-cgi/l/email-protection#1c596e75723251737f77735c7a796e7f327b736a"><span class="__cf_email__" data-cfemail="6b2e1902054526040800042b0d0e1908450c041d">[email&#160;protected]</span></a>.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: on or before 5:00 p.m. Eastern Time on 
January 20, 2026; reply comments are due on or before 5:00 p.m. Eastern 
Time on March 5, 2026.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief comments up to 10,000 
characters, without prior registration, using the eComment system at 
<a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please 
contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#99dfdccbdad6f7f5f0f7fccaece9e9f6ebedd9fffcebfab7fef6ef"><span class="__cf_email__" data-cfemail="f3b5b6a1b0bc9d9f9a9d96a08683839c8187b395968190dd949c85">[email&#160;protected]</span></a>, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, you may submit a paper copy. Submissions sent via the U.S. 
Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426. Submissions sent via any other carrier must be 
addressed to: Debbie Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. 
All filings must clearly identify the project name and docket number on 
the first page: Forestport Hydroelectric Project (P-4900-090).
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted for filing, and is ready for 
environmental analysis at this time.
    l. Project Description: The existing project consists of a 27-foot-
high dam known as the Forestport Dam, that includes a 315-foot-long 
ogee spillway. The Forestport Dam creates an impoundment that has a 
surface area of 118 acres at a normal surface elevation of 1,126.55 
feet National Geodetic Vertical Datum 1929 (NGVD29).
    From the impoundment, water flows through gates and a canal to a 
forebay known as Alder Pond. Alder Pond has a surface area of 24 acres 
at a normal surface elevation of 1,124.6 feet NGVD29 and is formed by a 
550-foot-long, 15-foot-high earth embankment known as Alder Pond Dam.
    From Alder Pond, water flows through a power canal to an intake 
structure with trashracks with 1.75-inch clear bar spacing. From the 
intake structure, water flows through a penstock to a powerhouse that 
includes a 3.3-megawatt (MW) S-type Kaplan turbine-generator. From the 
powerhouse, water is released into a tailrace that discharges into the 
Black River.
    The project generators are connected to the regional electric grid 
by generator lead lines and a 4.16/46-kV transformer.
    Project recreation facilities include: (1) Alder Pond parking and 
access area, adjacent to the east side of the Alder Pond Dam; (2) 
Forestport impoundment parking and access area, adjacent to the 
Forestport Dam on the northwest shore of the Forestport impoundment; 
(3) an approximately 1,200 foot-long portage route from the Forestport 
access area to the Alder Pond access area; (4) an approximately 150-
foot-long power canal portage route; and (5) a powerhouse parking and 
access area.
    Forestport Hydro proposes to: (1) continue operating the project in 
a run-of-river mode and maintaining the surface elevation of the 
Forestport impoundment at 1,126.55 feet NGVD29;

[[Page 53287]]

(2) continue to maintain the surface elevation of Alder Pond between 
1,123.6 and 1,124.6 feet NGVD29; (3) continue to release a minimum flow 
of 140 cfs or inflow, whichever is less, over the Forestport Dam; (4) 
implement a Bat and Bald Eagle Management Plan and an Invasive Species 
Management Plan; (5) develop an operation compliance monitoring plan; 
(6) continue to maintain existing project recreation facilities and 
update directional and safety signage; (7) move the power canal portage 
take-out site upstream of the boat barrier; and (8) to protect cultural 
resources, consult with the New York State Historic Preservation 
Officer before beginning any land-clearing or land-disturbing 
activities.
    m. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document (P-4900). For assistance, contact FERC 
Online Support.
    All filings must (1) bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name of the person 
submitting the filing; and (4) otherwise comply with the requirements 
of 18 CFR 385.2001 through 385.2005. All comments, recommendations, 
terms and conditions or prescriptions must set forth their evidentiary 
basis and otherwise comply with the requirements of 18 CFR 4.34(b). 
Agencies may obtain copies of the application directly from the 
applicant. Each filing must be accompanied by proof of service on all 
persons listed on the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#0a455a5a4a6c6f7869246d657c"><span class="__cf_email__" data-cfemail="9bd4cbcbdbfdfee9f8b5fcf4ed">[email&#160;protected]</span></a>.
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. The license applicant must file on or before 5:00 p.m. Eastern 
Time on January 20, 2026: (1) a copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    o. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
                Milestone                           Target date
------------------------------------------------------------------------
Filing of Comments, Recommendations,      January 2026.
 Terms, Conditions, and Prescriptions.
Filing of Reply Comments................  March 2026.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission on or before 5:00 p.m. Eastern Time on December 22, 2025.

     Dated: November 20, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-21051 Filed 11-24-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on November 25, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.