Notice2025-20674

Great Basin Gas Transmission Company; Notice of Schedule for the Preparation of an Environmental Assessment for the Gabs Lateral NASF Relocation Project

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
November 24, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 224 (Monday, November 24, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 224 (Monday, November 24, 2025)]
[Notices]
[Pages 52931-52932]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-20674]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP25-551-000]


Great Basin Gas Transmission Company; Notice of Schedule for the 
Preparation of an Environmental Assessment for the Gabs Lateral NASF 
Relocation Project

    On September 29, 2025, Great Basin Gas Transmission Company (Great 
Basin) filed an application in Docket No. CP25-551-000 requesting a 
Certificate of Public Convenience and Necessity pursuant to Section 
7(c) and Authorization pursuant to Section 7(b) of the Natural Gas Act 
to construct and operate and abandon certain natural gas pipeline 
facilities. The proposed project is known as the Gabbs Lateral Naval 
Air Station Fallon (NASF) Relocation Project (Project) and would 
support the relocation of its existing Gabbs Lateral through the 
installation of approximately 32.6 miles of replacement pipeline and 
the abandonment in-place or by removal of approximately 20.9 miles of 
pipeline in Mineral and Nye Counties, Nevada. The Project would not 
provide any incremental capacity. Additionally, the Project would 
accommodate the U.S. Navy's expansion of the Naval Air Station Fallon.
    On October 10, 2025, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
environmental document for the Project.
    This notice identifies Commission staff's intention to prepare an 
environmental assessment (EA) for the Project and the planned schedule 
for the completion of the environmental review.\1\ The EA will be 
issued for a 30-day comment period.
---------------------------------------------------------------------------

    \1\ For tracking purposes under the National Environmental 
Policy Act, the unique identification number for documents relating 
to this environmental review is EAXX-019-20-000-1762338293.

---------------------------------------------------------------------------

[[Page 52932]]

Schedule for Environmental Review

Issuance of EA--March 13, 2026
90-day Federal Authorization Decision Deadline \2\--June 11, 2026
---------------------------------------------------------------------------

    \2\ The Commission's deadline applies to the decisions of other 
federal agencies, and state agencies acting under federally 
delegated authority, that are responsible for federal 
authorizations, permits, and other approvals necessary for proposed 
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the 
Commission's deadline for other agency's decisions applies unless a 
schedule is otherwise established by federal law.

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    The Project would accommodate the U.S. Navy's congressionally 
authorized Fallon Range Training Complex Modernization Project. Great 
Basin proposes to: (1) install about 18.8 miles of new 8-inch-diameter 
pipeline and 13.8 miles of new 6-inch-diameter pipeline; and (2) 
abandon in place or by removal about 5.4 miles of existing 8-inch-
diameter pipe and 15.8 miles of existing 6-inch-diameter pipe. 
Additionally Great Basin would install two above-ground valve 
assemblies, replace a thermoelectric generator with a natural gas 
burning generator for the cathodic protection system, and relocate an 
appurtenant facility.

Background

    On October 9, 2024, the Commission issued a Notice of Scoping 
Period Requesting Comments on Environmental Issues for the Proposed 
Gabbs Lateral FNAS Relocation Project (Notice of Scoping). The Notice 
of Scoping was issued during the pre-filing review of the Project in 
Docket No. PF24-6-000 and was sent to affected landowners; federal, 
state, and local government agencies; elected officials; environmental 
and public interest groups; Native American tribes; other interested 
parties; and local libraries and newspapers. In response to the Notice 
of Scoping, the Commission received comments from Joe Burgess and the 
Nevada Department of Wildlife. The commenters requested that an 
environmental analysis should be completed and that baseline surveys of 
Bureau of Land Management (BLM) sensitive and state listed species 
should be conducted. All substantive comments will be addressed in the 
EA.
    The BLM and the U.S. Navy are cooperating agencies in the 
preparation of the EA.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of formal issuances and submittals in specific dockets, the 
Commission offers a free service called eSubscription. This service 
provides automatic notification of filings made to subscribed dockets, 
document summaries, and direct links to the documents. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to register for eSubscription.
    For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#612e313121070413024f060e17"><span class="__cf_email__" data-cfemail="7b342b2b3b1d1e0918551c140d">[email&#160;protected]</span></a>.
    Additional information about the Project is available from the FERC 
website (<a href="http://www.ferc.gov">www.ferc.gov</a>). Using the ``eLibrary'' link, select ``General 
Search'' from the eLibrary menu, enter the selected date range and 
``Docket Number'' excluding the last three digits (i.e., CP25-551), and 
follow the instructions. For assistance with access to eLibrary, the 
helpline can be reached at (866) 208-3676, TTY (202) 502-8659, or at 
<a href="/cdn-cgi/l/email-protection#edaba8bfaea28381848388be989d9d829f99ad8b889f8ec38a829b"><span class="__cf_email__" data-cfemail="04424156474b6a686d6a61577174746b767044626176672a636b72">[email&#160;protected]</span></a>. The eLibrary link on the FERC website also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: November 18, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-20674 Filed 11-21-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>