Notice2025-19988

EPA Determinations of Compliance and Applicability Under Clean Air Act Section 111, 112, and 129 Dashboard: EPA Formal Responses to Inquiries Concerning Compliance With the Clean Air Act Stationary Source Program (Since May 2019)

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
November 17, 2025

Issuing agencies

Environmental Protection Agency

Abstract

This document announces the availability of applicability determinations, alternative monitoring decisions, and regulatory interpretations made by the Environmental Protection Agency (EPA) with regard to the New Source Performance Standards (NSPS); the National Emission Standards for Hazardous Air Pollutants (NESHAP); the Emission Guidelines and Federal Plan Requirements for existing sources; and/or the Stratospheric Ozone Protection Program.

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 219 (Monday, November 17, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 219 (Monday, November 17, 2025)]
[Notices]
[Pages 51312-51315]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-19988]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OAR-2025-0486; FRL-12870-01-OAR]


EPA Determinations of Compliance and Applicability Under Clean 
Air Act Section 111, 112, and 129 Dashboard: EPA Formal Responses to 
Inquiries Concerning Compliance With the Clean Air Act Stationary 
Source Program (Since May 2019)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: This document announces the availability of applicability 
determinations, alternative monitoring decisions, and regulatory 
interpretations made by the Environmental Protection Agency (EPA) with 
regard to the New Source Performance Standards (NSPS); the National 
Emission Standards for Hazardous Air Pollutants (NESHAP); the Emission 
Guidelines and Federal Plan Requirements for existing sources; and/or 
the Stratospheric Ozone Protection Program.

FOR FURTHER INFORMATION CONTACT: For questions about the Clean Air Act 
(CAA) section 111, 112, and 129 Dashboard or this document, contact 
Diana Felix, Air Quality Policy Division, Operating Permits Group; 
telephone number: (919) 541-7627; email address: <a href="/cdn-cgi/l/email-protection#99fffcf5f0e1b7fdf0f8f7f8d9fce9f8b7fef6ef"><span class="__cf_email__" data-cfemail="a4c2c1c8cddc8ac0cdc5cac5e4c1d4c58ac3cbd2">[email&#160;protected]</span></a>.
    An electronic copy of each complete document posted on the CAA 
section 111, 112, and 129 Dashboard, which contains determinations 
signed after May 2019, is available on the internet through the 
Resources and Guidance Documents for Compliance Assistance page of the 
CAA Compliance Monitoring website under ``Air'' at: <a href="https://www.epa.gov/complying-air-emissions-standards-stationary-sources/epa-determinations-compliance-and">https://www.epa.gov/complying-air-emissions-standards-stationary-sources/epa-determinations-compliance-and</a>. All previously issued responses are 
posted on the Applicability Determination Index (ADI) data system 
available on the internet through the Resources and Guidance Documents 
for Compliance Assistance page of the CAA Compliance Monitoring website 
under ``Air'' at: <a href="https://www.epa.gov/compliance/resources-and-guidance-documents-compliance-assistance">https://www.epa.gov/compliance/resources-and-guidance-documents-compliance-assistance</a>.
    The letters and memoranda on the CAA section 111, 112, and 129 
Dashboard may be located by facility name, affected subpart, or by 
response date and is searchable by string word searches.

SUPPLEMENTARY INFORMATION:

General Information

    The General Provisions of the NSPS in 40 Code of Federal 
Regulations (CFR) part 60 and the General Provisions of the NESHAP in 
40 CFR part 61 provide that a source owner or operator may request a 
determination of whether certain intended actions constitute the 
commencement of construction, reconstruction, or modification. 40 CFR 
60.5 and 61.06. The General Provisions in part 60 also apply to Federal 
and EPA-approved state plans for existing sources in 40 CFR part 62. 
See 40 CFR 62.02(b)(2). The EPA's written responses to source or 
facility-specific inquiries on provisions in parts 60, 61 and 62 are 
commonly referred to as applicability determinations. Although the 
NESHAP part 63 regulations [which include Maximum Achievable Control 
Technology (MACT) standards and/or Generally Available Control 
Technology (GACT) standards] contain no specific regulatory provision 
providing that sources may request applicability determinations, the 
EPA also responds to written inquiries regarding applicability for the 
40 CFR part 63 regulations. In addition, the General Provisions in 
parts 60 and 63 allow sources to seek permission to use monitoring or 
recordkeeping that is different from the promulgated requirements. See 
40 CFR 60.13(i), 61.14(g), 63.8(b)(1), 63.8(f), and 63.10(f). The EPA's 
written responses to these inquiries are commonly referred to as 
alternative monitoring decisions. Furthermore, the EPA responds to 
written inquiries about the broad range of regulatory requirements in 
40 CFR parts 60 through 63 as they pertain to a whole source category. 
These inquiries may pertain, for example, to the type of sources to 
which the regulation applies, or to the testing, monitoring, 
recordkeeping, or reporting requirements contained in the regulation. 
The EPA's written responses to these inquiries are commonly referred to 
as regulatory interpretations.
    The EPA previously compiled EPA-issued NSPS and NESHAP 
applicability determinations, alternative monitoring decisions, and 
regulatory interpretations, and posted them to the ADI. As of October 
2, 2023, the EPA determinations of compliance and applicability under 
CAA section 111, 112, and 129 will be posted to the CAA section 111, 
112, and 129 Dashboard. The CAA section 111, 112, and 129 Dashboard is 
a data system, accessed via the internet, containing all determinations 
signed after May 2019.
    This document comprises a list of 62 such documents added to the 
CAA section 111, 112, and 129 Dashboard on June 25, 2025. This document 
lists the title of each letter and memorandum. Complete copies of these 
documents may be obtained from the CAA section 111, 112 and 129 
Dashboard on the internet through the Resources and Guidance Documents 
for Compliance Assistance page of the CAA Compliance Monitoring website 
under ``Air'' at: <a href="https://www.epa.gov/compliance/resources-and-guidance-documents-compliance-assistance">https://www.epa.gov/compliance/resources-and-guidance-documents-compliance-assistance</a>.

[[Page 51313]]



    Applicability Determinations, Alternative Monitoring Plans and Regulatory Interpretations Uploaded to CAA
                              Section 111, 112, and 129 Dashboard on June 25, 2025
----------------------------------------------------------------------------------------------------------------
           Facility name                        Title                   Affected subpart        Date of response
----------------------------------------------------------------------------------------------------------------
ANR Pipeline Company Sulphur         Alternative Monitoring for   40 CFR part 63, subpart             2025-06-13
 Springs and LaGrange Compressor      Stationary Gas Turbines.     YYYY.
 Stations.
Eagle Butte Co-op Incinerator......  Applicability Determination  40 CFR part 60, subpart             2025-05-28
                                      for Commercial and           CCCC.
                                      Industrial Solid Waste
                                      Incineration Units.
Gulf South Pipeline Company, LLC--   Alternative Monitoring for   40 CFR part 63, subpart             2025-05-19
 McComb Compressor Station.           Stationary Gas Turbines.     YYYY.
North Omaha Station................  Performance Test Waiver for  40 CFR part 63, subpart             2025-05-19
                                      Coal- and Oil-Fired          UUUUU.
                                      Electric Utility Steam
                                      Generating Unit.
Clean Harbors--Kimball NE..........  Alternative Monitoring for   40 CFR part 63, subpart EEE         2025-05-14
                                      Hazardous Waste Combustors.
QSS Biosolids, LLC.................  Applicability Determination  40 CFR part 60, subpart             2025-05-13
                                      for Sewage Sludge            LLLL; 40 CFR part 60,
                                      Incineration Units.          subpart CCCC.
Citgo Corpus Christi East Refinery.  Alternative Monitoring for   40 CFR part 60, subpart Ja.         2025-04-25
                                      Petroleum Refineries.
Heartland Corn Products............  Request for Operating        40 CFR part 63, subpart             2025-04-22
                                      Limits/Monitoring            YYYY.
                                      Petitions for Stationary
                                      Gas Turbines.
Potlatch Deltic Saint Marie's......  Regulatory Interpretation    40 CFR part 63, subpart             2025-03-13
                                      for Industrial,              DDDDD.
                                      Commercial, and
                                      Institutional Boilers and
                                      Process Heaters.
Domtar AW LLC--Ashdown AR..........  Applicability Determination  40 CFR part 60, subpart BB;         2025-03-10
                                      for Kraft Pulp Mills.        40 CFR part 63, subpart S.
Birmingham Airport Authority.......  Applicability Determination  40 CFR part 60, subpart             2025-03-10
                                      for Other Solid Waste        EEEE.
                                      Incineration Units.
Duke Energy........................  Regulatory Interpretation    40 CFR part 63, subpart             2025-02-27
                                      for Stationary               ZZZZ.
                                      Reciprocating Internal
                                      Combustion Engines.
Dow Chemical--Freeport, TX.........  Alternative Monitoring for   40 CFR part 63, subpart JJJ         2025-01-08
                                      Polymers and Resins.
Arbor Management Specialist........  Applicability Determination  40 CFR part 60, subpart             2024-12-10
                                      for Commercial and           CCCC.
                                      Industrial Solid Waste
                                      Incineration Units.
Shuqualak Lumber Company...........  Alternative Monitoring for   40 CFR part 63, subpart             2024-12-05
                                      Industrial, Commercial,      DDDDD.
                                      and Institutional Boilers
                                      and Process Heaters.
Chem Plate Industries..............  Applicability Determination  40 CFR part 61, subpart E..         2024-10-10
                                      for Sludge Drying
                                      Operation.
Primient Lafayette.................  Alternative Monitoring for   40 CFR part 63, subpart             2024-09-26
                                      Stationary Gas Turbines.     YYYY.
Kaiser Aluminum Spokane Valley.....  Regulatory Interpretation    40 CFR part 63, subpart RRR         2024-09-09
                                      for Secondary Aluminum
                                      Production.
Consumers Muskegon River Compressor  Alternative Operating        40 CFR part 63, subpart             2024-09-05
 Station.                             Limits/Monitoring for        YYYY.
                                      Stationary Combustion
                                      Turbines.
Oil Energy Systems Inc.............  Applicability Determination  40 CFR part 60, subpart             2024-09-05
                                      for Other Solid Waste        EEEE.
                                      Incineration Units.
Sonoma Ecology Center (SEC)........  Applicability Determination  40 CFR part 60, subpart             2024-08-22
                                      for Other Solid Waste        EEEE.
                                      Incineration.
Platte Generating Station..........  Alternative Recordkeeping/   40 CFR part 63, subpart             2024-08-22
                                      Reporting for Coal- and      UUUUU.
                                      Oil-Fired Electric Utility
                                      Steam Generating Unit.
Cerro Colorado Landfill--City of     Alternative Monitoring for   40 CFR part 60, subpart Cf.         2024-08-07
 Albuquerque.                         MSW Landfills.
Aurora Energy......................  Alternative Reporting for    40 CFR part 63, subpart             2024-08-01
                                      Oil and Gas Exploration      JJJJJJ.
                                      and Production Operation.
Lon D Wright Power Plant...........  Alternative Reporting and    40 CFR part 63, subpart             2024-08-01
                                      Recordkeeping Requirements   UUUUU.
                                      for Coal-Fired Power Plant.
Monarch Ceramic Tile...............  Applicability Determination  40 CFR part 60, subpart OOO         2024-07-02
                                      for Nonmetallic Mineral
                                      Processing Plant.
North Wake Landfill................  Alternative Landfill Gas     40 CFR part 62, subpart             2024-07-02
                                      Flowrate Calculation         OOO; 40 CFR part 63,
                                      Procedures for NSWL.         subpart AAAA.
Nebraska City Station and North      Alternative Recordkeeping    40 CFR part 63, subpart             2024-07-01
 Omaha Station.                       and Reporting for MATS.      UUUUU.
Savant Alaska......................  Alternative Reporting for    40 CFR part 60, subpart             2024-07-01
                                      Oil and Gas Exploration      OOOOa.
                                      and Production Operation.

[[Page 51314]]

 
Enerfin Resources Northwest........  Alternative Monitoring for   40 CFR part 63, subpart HH.         2024-06-17
                                      Measurement of VHAP.
CLECO Brame Energy Center--Madison   Performance Test Waiver for  40 CFR part 63, subpart             2024-06-13
 Units 3-1_3-2.                       Coal- and Oil-Fired          UUUUU; 40 CFR part 63,
                                      Electric Utility Steam       subpart A.
                                      Generating Units.
ANR Pipeline Sulphur Springs CS....  Alternative Operating        40 CFR part 63, subpart             2024-06-04
                                      Limits/Monitoring for        YYYY.
                                      Stationary Combustion
                                      Turbines.
Brown County South Landfill........  Applicability Determination  40 CFR part 60, subpart XXX         2024-05-13
                                      for Municipal Solid Waste.
DTE Gas Company--Belle River Mills,  Alternative Operating        40 CFR part 63, subpart             2024-05-02
 Milford, and Willow Run.             Limits/Monitoring for        YYYY.
                                      Stationary Combustion
                                      Turbines.
GVEA Healy.........................  Alternative Test Dates for   40 CFR part 63, subpart             2024-04-25
                                      MATS.                        UUUUU.
BP Pipelines (North America) Inc...  Applicability Determination  40 CFR part 60, subpart Ja.         2024-04-15
                                      for Petroleum Refinery.
Amgen Manufacturing, Limited.......  Performance Test Extension   40 CFR part 60, subpart             2024-04-11
                                      for Stationary Combustion    KKKK:.
                                      Turbine.
Alyeska Valdez Marine Terminal.....  Applicability Determination  40 CFR part 63, subpart             2024-04-04
                                      for Municipal Waste          EEEE; 40 CFR part 63,
                                      Combustors.                  subpart SS.
City of Spokane Waste to Energy      Other: Force Majeure.......  40 CFR part 60, subpart Eb;         2024-04-03
 Facility.                                                         40 CFR part 60, subpart Cb.
Diversified Vapor Technologies.....  Alternative Monitoring Plan  40 CFR part 60, subpart J;          2024-03-27
                                      and Performance Waiver for   40 CFR part 60, subpart Ja.
                                      Petroleum Refineries.
MSU Simon Turbine..................  Applicability Determination  40 CFR part 63, subpart             2024-03-25
                                      for Stationary Combustion    YYYY.
                                      Turbines.
Dow Chemical Plaquemine Operations.  Applicability Determination  40 CFR part 63, subpart             2024-03-18
                                      for MON.                     FFFF.
U.S. Steel--Keetac.................  Applicability Determination  40 CFR part 63, subpart             2024-02-26
                                      for Ore Processing.          RRRRR.
Consumers Energy's Muskegon River    Applicability Determination  40 CFR part 63, subpart             2024-02-21
 Compressor Station.                  for Stationary Combustion    YYYY.
                                      Turbines.
DTE Marietta.......................  Applicability Determination  40 CFR part 63, subpart             2024-02-21
                                      for Stationary Combustion    YYYY.
                                      Turbines.
ANR Pipeline Company (ANR) LaGrange  Applicability Determination  40 CFR part 63, subpart             2024-02-20
 Compressor Station.                  for Stationary Combustion    YYYY.
                                      Turbines.
Seepex, Inc........................  Applicability Determination  40 CFR part 63, subpart             2024-01-25
                                      for Nine Metal Fabrication   XXXXXX.
                                      and Finishing Source
                                      Categories.
Cleveland--Cliffs Minorca Mine Inc.  Alternative Monitoring       40 CFR part 63, subpart             2024-01-19
                                      Request for Taconite Iron    RRRRR; 40 CFR part 60,
                                      Ore Processing Units.        subpart BBa; 40 CFR part
                                                                   63, subpart MM.
Applied Gaia B3 Continuous           Applicability Determination  40 CFR part 60, subpart             2024-01-09
 Pyrolysis Machine (Biochar           for the Other Solid Waste    EEEE.
 Reactor).                            Incineration Units.
Corteva Midland Michigan...........  Applicability Determination  40 CFR part 63, subpart F;          2023-12-12
                                      Regarding the Distillation   40 CFR part 60, subpart
                                      of a SOCMI-listed Chemical.  VVa; 40 CFR part 63,
                                                                   subpart G.
DTE Gas Company, Milford Compressor  Alternative Monitoring for   40 CFR part 63, subpart             2023-12-08
 Station.                             Stationary Gas Turbines.     YYYY.
DTE Gas Company, Willow Compressor   Alternative Monitoring for   40 CFR part 63, subpart             2023-12-08
 Station.                             Stationary Gas Turbines.     YYYY.
DTE Gas Company, Belle River         Alternative Monitoring for   40 CFR part 63, subpart             2023-12-08
 Compressor Station.                  Stationary Gas Turbines.     YYYY.
Primary Products Ingredients         Alternative Monitoring for   40 CFR part 63, subpart             2023-12-08
 Americas LLC--Primient South.        Stationary Gas Turbines.     YYYY.
MSU Simon Power Plant..............  Alternative Operating        40 CFR part 63, subpart             2023-12-08
                                      Limits/Monitoring for        YYYY.
                                      Stationary Combustion
                                      Turbines.
Consumers Energy Company--Muskegon   Alternative Operating        40 CFR part 63, subpart             2023-11-07
 River Compressor Station.            Limits/Monitoring for        YYYY.
                                      Stationary Combustion
                                      Turbines.
DTE Marietta.......................  Alternative Operating        40 CFR part 63, subpart             2023-11-07
                                      Limits/Monitoring for        YYYY.
                                      Stationary Combustion
                                      Turbines.
Cottonwood Hills RDF...............  Other Request for MSW        40 CFR part 63, subpart             2023-10-31
                                      Landfills.                   AAAA.
DTE Greenwood Energy Center........  Applicability Determination  40 CFR part 63, subpart             2023-10-24
                                      for Electric Generating      DDDDD; 40 CFR part 63,
                                      Unit.                        subpart UUUUU.
Baxter Healthcare of Puerto Rico...  Performance Test Extension   40 CFR part 60, subpart             2023-10-10
                                      for Stationary Spark         JJJJ.
                                      Ignition Internal
                                      Combustion Engines.
Holmes Regional Medical Center.....  Alternative Testing for      40 CFR part 63, subpart             2023-10-05
                                      Stationary Compression       ZZZZ; 40 CFR part 60,
                                      Combustion Engine.           subpart IIII.
Magellan Pipeline Company, L.P.--    Test Extension Request for   40 CFR part 63, subpart             2023-09-18
 Osborn Station.                      Reciprocating Internal       ZZZZ.
                                      Combustion Engine.
----------------------------------------------------------------------------------------------------------------



[[Page 51315]]

Panagiotis Tsirigotis,
Director, Office of Air Quality Planning and Standards.
[FR Doc. 2025-19988 Filed 11-14-25; 8:45 am]
BILLING CODE 6560-50-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on November 17, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.