Notice2025-18315

Oglethorpe Power Corporation; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Rocky Mountain Pumped Storage Hydroelectric Project

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 22, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 181 (Monday, September 22, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 181 (Monday, September 22, 2025)]
[Notices]
[Pages 45380-45382]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-18315]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. P-2725-076]


Oglethorpe Power Corporation; Notice of Scoping Period Requesting 
Comments on Environmental Issues for the Proposed Rocky Mountain Pumped 
Storage Hydroelectric Project

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2725-076.
    c. Date Filed: December 6, 2024.
    d. Applicant: Oglethorpe Power Corporation (OPC).
    e. Name of Project: Rocky Mountain Pumped Storage Hydroelectric 
Project.
    f. Location: On Heath Creek, in Floyd County, Georgia.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

[[Page 45381]]

    h. Applicant Contact: Jeff Swartz, Oglethorpe Power Corporation, 
Senior Vice President of Plant Operations, 2100 East Exchange Place, 
Tucker, Georgia 30084; phone at (770) 270-7600; email at Jeff 
<a href="/cdn-cgi/l/email-protection#93c0e4f2e1e7e9d3fce3f0bdf0fcfe"><span class="__cf_email__" data-cfemail="580b2f392a2c221837283b763b3735">[email&#160;protected]</span></a>.
    i. FERC Contact: David Gandy, Project Coordinator, South Branch, 
Division of Hydropower Licensing; phone at (202) 502-8560; email at 
<a href="/cdn-cgi/l/email-protection#e68287908f82c8818788829fa680839485c8818990"><span class="__cf_email__" data-cfemail="d2b6b3a4bbb6fcb5b3bcb6ab92b4b7a0b1fcb5bda4">[email&#160;protected]</span></a>.
    j. The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental document that will discuss 
the environmental effects of relicensing the Rocky Mountain Pumped 
Storage Hydroelectric Project. The Commission will use this 
environmental document in its decision-making process to determine 
whether to issue a new license for the project.
    k. This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies regarding the project. This notice is intended to advise all 
participants as to the potential scope of the National Environmental 
Policy Act (NEPA) document and to seek additional information pertinent 
to this analysis. Commission staff does not intend to issue a separate 
scoping document.
    As part of the NEPA review process, the Commission takes into 
account concerns the public may have about proposals and the 
environmental effects that could result from its action whenever it 
considers the issuance of a hydropower license. This gathering of 
public input is referred to as ``scoping.'' The main goal of the 
scoping process is to focus the analysis in the environmental document 
on the important environmental issues.
    l. Scoping Comments: By this notice, the Commission requests 
written public comments on the scope of issues to address in the 
environmental document. To ensure that your comments are timely and 
properly recorded, please submit your comments so that the Commission 
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on 
October 20, 2025.
    Comments should focus on the potential environmental effects and 
reasonable alternatives. Your input will help the Commission staff 
determine what issues they need to evaluate in the environmental 
document. Commission staff will consider all written comments during 
the preparation of the environmental document.
    The Commission strongly encourages electronic filing. Please file 
scoping comments using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For 
assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#ce888b9c8d81a0a2a7a0ab9dbbbebea1bcba8ea8abbcade0a9a1b8"><span class="__cf_email__" data-cfemail="9ed8dbccddd1f0f2f7f0fbcdebeeeef1eceadef8fbecfdb0f9f1e8">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Debbie-Anne A. Reese, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, MD 20852. All filings must clearly identify the project name 
and docket number on the first page: Rocky Mountain Pumped Storage 
Hydroelectric Project (P-2725-076).
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    m. The application is not ready for environmental analysis at this 
time.
    n. The Rocky Mountain Pumped Storage Project consists of the 
following existing facilities: (1) a 120-foot-high, 12,895-foot-long 
earth and rockfill upper dam; (2) a 221 acre upper reservoir with 
10,650 acre-feet of storage and a normal operating pool elevation of 
1,392 feet North American Vertical Datum of 1988 (NAVD88); (3) a 35-
foot-diameter, 567-foot-high concrete-lined power shaft; (4) a 35-foot-
diameter, 1,935-foot-long concrete lined tunnel with two concrete lined 
bifurcations; (5) three 19-foot-diameter, 470-foot-long steel lined 
penstocks; (6) a 348-foot-long, 156-foot-wide, 175-foot-high powerhouse 
containing three reversible Francis pump-turbines, with a combined 
installed capacity of 904 megawatts; (7) a 600 acre lower reservoir 
with 18,800 acre-feet of storage and a maximum elevation of 710.5 ft 
NAVD88 created by a combination of three dams; (8) a 120-foot-high, 
942-foot-long combination earth and rockfill embankment, and a concrete 
gravity main dam; a 70-foot-high, 1,260-foot-long earth and rockfill 
structure with an impervious core; and a 10-foot-high, 690-foot-long 
earthfill structure; (9) three 230 kilovolt, 2.7-mile-long transmission 
lines; (10) a substation; and (11) appurtenant facilities.
    The project also has reserve storage water contained in two 
auxiliary pools adjacent to the lower reservoir. Pool I's (Antioch 
Lakes East and West) surface area is 400 acres and is formed by four 
dams. The pool I dams consist of: (a) a 25-foot-high earthen dam of 
unspecified length; (b) a 20-foot-high, 775-foot-long earth and 
rockfill dam; (c) a 50-foot-high, 700-foot-long earth and rockfill dam; 
and (d) a 50-foot-high, 405-foot-long earth and rockfill dam. Pool II's 
(Heath Lake) surface area is 200 acres and is formed by a 30-foot-high, 
335-foot-long earth and rockfill dam.
    Under a new license, OPC proposes to: (1) continue operating the 
pumped storage project has it has historically, with no changes 
generation capacity or other project modifications; (2) continue to 
release a continuous minimum flow of 1.2 cfs from the Lower Reservoir 
into Heath Creek; (3) implement a study to examine the effects of 
different minimum flows under summer low-flow operations on dissolved 
oxygen in Heath Creek downstream of the Main Dam; (4) implement Bald 
Eagle Management and Invasive Species Management Plans filed with the 
license application; (5) implement bat habitat protection measures; and 
(5) implement a Recreation Enhancement Plan for Heath Lake, and Antioch 
Lakes East and West. OPC also proposes to develop and implement a 
Historic Properties Management Plan through a Programmatic Agreement.
    o. A copy of the application, with details of the proposed project, 
can be viewed on the Commission's website at <a href="https://www.ferc.gov">https://www.ferc.gov</a> using 
the ``eLibrary'' link. Enter the project's docket number excluding the 
last three digits in the docket number field to access the document (P-
2725). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#9adcdfc8d9d5f4f6f3f4ffc9efeaeaf5e8eedafcffe8f9b4fdf5ec"><span class="__cf_email__" data-cfemail="03454651404c6d6f6a6d66507673736c717743656671602d646c75">[email&#160;protected]</span></a>, 
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).
    p. NEPA Process and the Environmental Document: Any environmental 
document issued by the Commission will discuss effects that could occur 
as a result of the project's relicensing under the relevant general 
resource areas, such as:
    <bullet> geology and soils;
    <bullet> aquatic resources;
    <bullet> terrestrial resources;
    <bullet> threatened and endangered species;
    <bullet> recreation, land use, and aesthetic resources;
    <bullet> cultural resources; and
    <bullet> developmental resources.

[[Page 45382]]

    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project and make recommendations on 
how to lessen or avoid effects on the various resource areas. Your 
comments will help Commission staff identify and focus on the issues 
that might have an effect on the human environment and potentially 
eliminate others from further discussion in the environmental document.
    Following this scoping period, Commission staff will determine 
whether to prepare an Environmental Assessment (EA) or an Environmental 
Impact Statement (EIS). The EA or EIS will present Commission staff's 
independent analysis of the issues. If Commission staff prepares an EA, 
a Notice of Intent to Prepare an Environmental Assessment will be 
issued. The EA may be issued for an allotted public comment period. The 
Commission would consider timely comments on the EA before making its 
decision regarding the proposed project. If Commission staff prepares 
an EIS, a Notice of Intent to Prepare an Environmental Impact Statement 
will be issued. Staff will then prepare a draft EIS which will be 
issued for public comment. Commission staff will consider all timely 
comments received during the comment period on the draft EIS and revise 
the document, as necessary, before issuing a final EIS. Any EA or draft 
and final EIS will be available in electronic format in the public 
record through eLibrary. If eSubscribed, you will receive instant email 
notification when the environmental document is issued (see paragraph 
(r) of this notice for instructions on using eSubscription).
    q. The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as interventions, 
comments, or requests for rehearing, the public is encouraged to 
contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#bef1eeeefed8dbccdd90d9d1c8"><span class="__cf_email__" data-cfemail="93dcc3c3d3f5f6e1f0bdf4fce5">[email&#160;protected]</span></a>.
    r. This notice is being distributed to the Commission's official 
mailing list for the project and any additional entities on the 
applicant's distribution list. You can access the Commission's official 
mailing list for this project at <a href="https://ferconline.ferc.gov/MailListLOR.aspx?Type=MailList&ListVar=P-2725">https://ferconline.ferc.gov/MailListLOR.aspx?Type=MailList&ListVar=P-2725</a>. If you want to receive 
future mailings for the project and are not included on the 
Commission's official mailing list, or if you wish to be removed from 
the Commission's official mailing list, please send your request by 
email to <a href="/cdn-cgi/l/email-protection#8dcbc8dfcec2e3e1e4e3e8def8fdfde2fff9cdebe8ffeea3eae2fb"><span class="__cf_email__" data-cfemail="c0868592838faeaca9aea593b5b0b0afb2b480a6a5b2a3eea7afb6">[email&#160;protected]</span></a>. In lieu of an email request, you 
may submit a paper request. Submissions sent via the U.S. Postal 
Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, 
DC 20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, MD 20852. All written or emailed 
requests must specify your wish to be added to or removed from the 
mailing list, and must clearly identify the following on the first 
page: Rocky Mountain Pumped Storage Hydroelectric Project (P-2725-076).
    Additionally, the Commission offers a free service called 
eSubscription, which makes it easy to stay informed of all issuances 
and submittals regarding the dockets/projects to which you subscribe. 
These instant email notifications are the fastest way to receive 
notification and provide a link to the document files which can reduce 
the amount of time you spend researching proceedings. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to register for eSubscription.
    In addition to publishing the full text of this notice in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this notice, as well 
as other documents in the proceeding (e.g., license application) via 
the internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>) 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document (P-
2725). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#a3e5e6f1e0eccdcfcacdc6f0d6d3d3ccd1d7e3c5c6d1c08dc4ccd5"><span class="__cf_email__" data-cfemail="377172657478595b5e595264424747584543775152455419505841">[email&#160;protected]</span></a>, 
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).

    Dated: September 17, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-18315 Filed 9-19-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 22, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.