Notice2025-13619

Rancho California Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
July 21, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 137 (Monday, July 21, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 137 (Monday, July 21, 2025)]
[Notices]
[Page 34265]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-13619]



[[Page 34265]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD25-11-000]


Rancho California Water District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On July 8, 2025, Rancho California Water District filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA). The proposed Washington 
Avenue In-Line Turbine Generator Hydroelectric Project would have an 
installed capacity of 105 kilowatts (kW) and would be located at the 
Santa Rosa Water Reclamation Facility, in Murrieta, Riverside County, 
California.
    Applicant Contact: Michael Guirguis, LEE & RO, Inc., 1199 Fullerton 
Road, City of Industry, CA 91748, 626-912-3391, <a href="/cdn-cgi/l/email-protection#94d9fdf7fcf5f1f8bad3e1fde6f3e1fde7d4f8f1f1b9a8f5b4fce6f1f2a9" http: ro.com">ro.com</a>">Michael.Guirguis@lee-<a href="http://ro.com">ro.com</a></a>.
    FERC Contact: Christopher Chaney, 202-502-6778, 
<a href="/cdn-cgi/l/email-protection#96f5fee4ffe5e2f9e6fef3e4b8f5fef7f8f3efd6f0f3e4f5b8f1f9e0"><span class="__cf_email__" data-cfemail="d1b2b9a3b8a2a5bea1b9b4a3ffb2b9b0bfb4a891b7b4a3b2ffb6bea7">[email&#160;protected]</span></a>.
    Qualifying Conduit Hydropower Facility Description: The project 
would consist of: (1) one turbine generating unit with a capacity of 
105 kW and (2) appurtenant facilities.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                              Satisfies
         Statutory provision               Description          (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A).....................  The conduit the                 Y
                                       facility uses is a
                                       tunnel, canal,
                                       pipeline, aqueduct,
                                       flume, ditch, or
                                       similar manmade
                                       water conveyance
                                       that is operated for
                                       the distribution of
                                       water for
                                       agricultural,
                                       municipal, or
                                       industrial
                                       consumption and not
                                       primarily for the
                                       generation of
                                       electricity.
FPA 30(a)(3)(C)(i)..................  The facility is                 Y
                                       constructed,
                                       operated, or
                                       maintained for the
                                       generation of
                                       electric power and
                                       uses for such
                                       generation only the
                                       hydroelectric
                                       potential of a non-
                                       federally owned
                                       conduit.
FPA 30(a)(3)(C)(ii).................  The facility has an             Y
                                       installed capacity
                                       that does not exceed
                                       40 megawatts.
FPA 30(a)(3)(C)(iii)................  On or before August             Y
                                       9, 2013, the
                                       facility is not
                                       licensed, or
                                       exempted from the
                                       licensing
                                       requirements of Part
                                       I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed Washington Avenue In-Line 
Turbine Generator Hydroelectric Project will not alter the primary 
purpose of the conduit, which is for municipal use. Therefore, based 
upon the above criteria, Commission staff preliminarily determines that 
the operation of the project described above satisfies the requirements 
for a qualifying conduit hydropower facility, which is not required to 
be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments, 
comments contesting whether the facility meets the qualifying criteria, 
and motions to intervene: August 15, 2025.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS,'' ``COMMENTS CONTESTING 
QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY,'' or ``MOTION TO 
INTERVENE,'' as applicable; (2) state in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) state the name, address, and telephone number of the 
person filing; and (4) otherwise comply with the requirements of 
sections 385.2001 through 385.2005 of the Commission's regulations.\1\ 
All comments contesting Commission staff's preliminary determination 
that the facility meets the qualifying criteria must set forth their 
evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2024).
---------------------------------------------------------------------------

    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as comments or 
motions to intervene, the public is encouraged to contact OPP at (202) 
502-6595 or <a href="/cdn-cgi/l/email-protection#a8e7f8f8e8cecddacb86cfc7de"><span class="__cf_email__" data-cfemail="2c637c7c6c4a495e4f024b435a">[email&#160;protected]</span></a>.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at <a href="/cdn-cgi/l/email-protection#d79192859498b9bbbeb9b284a2a7a7b8a5a397b1b2a5b4f9b0b8a1"><span class="__cf_email__" data-cfemail="c78182958488a9abaea9a294b2b7b7a8b5b387a1a2b5a4e9a0a8b1">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a 
paper copy. Submissions sent via the U.S. Postal Service must be 
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, MD 20852. A copy of all other filings 
in reference to this application must be accompanied by proof of 
service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 385.2010.
    Locations of Notice of Intent: The Commission provides all 
interested persons an opportunity to view and/or print the contents of 
this document via the internet through the Commission's website at 
<a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number 
(i.e., CD25-11) in the docket number field to access the document. You 
may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances 
related to this or other pending projects. Copies of the notice of 
intent can be obtained directly from the applicant. For assistance, 
call toll-free 1-866-208-3676 or email <a href="/cdn-cgi/l/email-protection#04424156474b6a686d6a61577174746b767044626176672a636b72"><span class="__cf_email__" data-cfemail="40060512030f2e2c292e25133530302f323400262532236e272f36">[email&#160;protected]</span></a>. For 
TTY, call (202) 502-8659.

    Dated: July 16, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-13619 Filed 7-18-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on July 21, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.