Due to the receipt of significant adverse comments, the U.S. Department of Energy (DOE) is extending the effective date of the direct final rule "Application for Presidential Permit Authorizing the Construction, Connection, Operation and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries," published on May 16, 2025.
Full Text
<html>
<head>
<title>Federal Register, Volume 90 Issue 132 (Monday, July 14, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 132 (Monday, July 14, 2025)]
[Rules and Regulations]
[Page 31131]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-13137]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
========================================================================
Federal Register / Vol. 90, No. 132 / Monday, July 14, 2025 / Rules
and Regulations
[[Page 31131]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
10 CFR Part 205
[DOE-HQ-2025-0011]
RIN 1901-AB68
Application for Presidential Permit Authorizing the Construction,
Connection, Operation, and Maintenance of Facilities for Transmission
of Electric Energy at International Boundaries
AGENCY: Grid Deployment Office, Department of Energy.
ACTION: Direct final rule; delay of effective date.
-----------------------------------------------------------------------
SUMMARY: Due to the receipt of significant adverse comments, the U.S.
Department of Energy (DOE) is extending the effective date of the
direct final rule ``Application for Presidential Permit Authorizing the
Construction, Connection, Operation and Maintenance of Facilities for
Transmission of Electric Energy at International Boundaries,''
published on May 16, 2025.
DATES: As of July 14, 2025, the effective date of the direct final rule
published May 16, 2025, at 90 FR 20753, is delayed until September 12,
2025.
FOR FURTHER INFORMATION CONTACT: Mr. Jeffrey Novak, U.S. Department of
Energy, Office of the General Counsel, GC-1, 1000 Independence Avenue
SW, Washington, DC 20585; (202) 586-5281 or
<a href="/cdn-cgi/l/email-protection#45010a0002202b20372429062a302b362029052d346b212a206b222a33"><span class="__cf_email__" data-cfemail="abefe4eeeccec5ced9cac7e8c4dec5d8cec7ebc3da85cfc4ce85ccc4dd">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: On May 16, 2025, DOE published a direct
final rule. (90 FR 20753). DOE stated in that direct final rule that if
significant adverse comments were received by June 16, 2025, DOE would
withdraw the direct final rule or issue a new final rule which responds
to the significant adverse comments.
Because DOE subsequently received significant adverse comments on
that direct final rule, DOE is extending the effective date to consider
the comments submitted in response to the direct final rule.
To the extent that 5 U.S.C. 553 applies to this action, it is
exempt from notice and comment because it constitutes a rule of
procedure under 5 U.S.C. 553(b)(A) and for which no notice or hearing
is required by statute. Additionally, this action is not a
``substantive rule'' for which a 30-day delay in effective date is
required under 5 U.S.C. 553(d).
Signing Authority
This document of the Department of Energy was signed on July 9,
2025, by Chris Wright, the Secretary of Energy. That document with the
original signature and date is maintained by DOE. For administrative
purposes only, and in compliance with requirements of the Office of the
Federal Register, the undersigned DOE Federal Register Liaison Officer
has been authorized to sign and submit the document in electronic
format for publication, as an official document of the Department of
Energy. This administrative process in no way alters the legal effect
of this document upon publication in the Federal Register.
Signed in Washington, DC, on July 10, 2025.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2025-13137 Filed 7-11-25; 8:45 am]
BILLING CODE 6450-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.