Notice2025-10484

Molitor, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
June 10, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 110 (Tuesday, June 10, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 110 (Tuesday, June 10, 2025)]
[Notices]
[Pages 24398-24399]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-10484]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15401-000]


Molitor, LLC; Notice of Preliminary Permit Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, and Competing 
Applications

    On April 28, 2025, GeoSense, LLC, on behalf of Molitor, LLC (the 
applicant), filed an application for a preliminary permit, pursuant to 
section 4(f) of the Federal Power Act (FPA), proposing to study the 
feasibility of the Molitor Hydroelectric Project (or Project) to be 
located on Deep Creek, tributary of the Snake River, in Twin falls 
County, Idaho. The sole purpose of a preliminary permit, if issued, is 
to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) a 90-foot-
long, 9.5 foot-high, 2-foot-wide concrete embankment; (2) a 0.5-acre 
impoundment with a normal surface elevation of approximately 3,310 feet 
above sea level; (3) a 3,500-foot-long concrete canal; (4) a 750-foot-
long, 55-inch-diamater buried steel penstock; (5) a 40-foot-long, 25-
foot-wide concrete and steel powerhouse containing a 714 kilowatt 
horizontal-Francis turbine-generator unit; (6) a 4,800-foot-long 
transmission line extending from powerhouse to the point of 
interconnection with Idaho Power facilities; and (7) appurtenant 
facilities. The estimated annual generation of the Project would be 
4,376 megawatt-hours.
    Applicants Contact: Peter Josten, GeoSense, LLC, 2742 Saint Charles 
Ave., Idaho Falls, ID 83404, (208) 339-3542, <a href="/cdn-cgi/l/email-protection#ee9e8b9a8b9cc0899d8b809d8bae89838f8782c08d8183"><span class="__cf_email__" data-cfemail="8cfce9f8e9fea2ebffe9e2ffe9ccebe1ede5e0a2efe3e1">[email&#160;protected]</span></a>.
    FERC Contact: Maryam Zavareh at <a href="/cdn-cgi/l/email-protection#f6bb97848f979bd88c97809784939eb690938495d8919980"><span class="__cf_email__" data-cfemail="bdf0dccfc4dcd093c7dccbdccfd8d5fddbd8cfde93dad2cb">[email&#160;protected]</span></a>.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: by 5:00 p.m. Eastern Time on August 4, 2025. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>.

[[Page 24399]]

Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. For assistance, please contact FERC Online 
Support at <a href="/cdn-cgi/l/email-protection#7f393a2d3c30111316111a2c0a0f0f100d0b3f191a0d1c51181009"><span class="__cf_email__" data-cfemail="d79192859498b9bbbeb9b284a2a7a7b8a5a397b1b2a5b4f9b0b8a1">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. The first page of any filing should 
include docket number.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's website at <a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. 
Enter the docket number in the docket number field to access the 
document. For assistance, contact FERC Online Support.

    Dated: June 4, 2025.
Carlos D. Clay,
Deputy Secretary.
[FR Doc. 2025-10484 Filed 6-9-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on June 10, 2025.