Eagle Creek Reusens Hydro, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
May 22, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 98 (Thursday, May 22, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 98 (Thursday, May 22, 2025)]
[Notices]
[Pages 21919-21920]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-09196]



[[Page 21919]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2376-052]


Eagle Creek Reusens Hydro, LLC; Notice of Application Ready for 
Environmental Analysis and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

    a. Type of Application: New Major License.
    b. Project No.: 2376-052.
    c. Date Filed: February 28, 2022.
    d. Applicant: Eagle Creek Reusens Hydro, LLC (Reusens Hydro).
    e. Name of Project: Reusens Hydroelectric Project (Reusens Project 
or project).
    f. Location: The project is located on the James River in Bedford 
and Amherst Counties, Virginia.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Ms. Joyce Foster, Director, Licensing and 
Compliance Eagle Creek Renewable Energy, LLC, 7315 Wisconsin Avenue, 
Suite 1100W, Bethesda, MD 20814; Phone at (804) 338-5110 or email at 
<a href="/cdn-cgi/l/email-protection#642e0b1d07014a220b17100116240105030801071601010f16014a070b"><span class="__cf_email__" data-cfemail="581237213b3d761e372b2c3d2a183d393f343d3b2a3d3d332a3d763b37">[email&#160;protected]</span></a>; and Ms. Jody Smet, Vice President, 
Regulatory Affairs, Eagle Creek Renewable Energy, LLC, 7315 Wisconsin 
Ave., Suite 1100W, Bethesda, MD 20814; Phone at (240) 482-2700 or email 
at <a href="/cdn-cgi/l/email-protection#f79d98938ed9849a9283b79296909b92948592929c8592d994989a"><span class="__cf_email__" data-cfemail="a0cacfc4d98ed3cdc5d4e0c5c1c7ccc5c3d2c5c5cbd2c58ec3cfcd">[email&#160;protected]</span></a>.
    i. FERC Contact: Laurie Bauer at (202) 502-6519, or 
<a href="/cdn-cgi/l/email-protection#533f3226213a367d313226362113353621307d343c25"><span class="__cf_email__" data-cfemail="65090410170c004b070410001725030017064b020a13">[email&#160;protected]</span></a>.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: on or before 5:00 p.m. Eastern Time on 
July 12, 2025; reply comments are due on or before 5:00 p.m. Eastern 
Time on August 26, 2025.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
<a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please 
contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#e3a5a6b1a0ac8d8f8a8d86b09693938c9197a385869180cd848c95"><span class="__cf_email__" data-cfemail="e3a5a6b1a0ac8d8f8a8d86b09693938c9197a385869180cd848c95">[email&#160;protected]</span></a>, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, you may submit a paper copy. Submissions sent via the U.S. 
Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426. Submissions sent via any other carrier must be 
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. 
All filings must clearly identify the project name and docket number on 
the first page: Reusens Hydroelectric Project (P-2376-052).
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The Reusens Project consists of: (1) a 24-foot-high, 416-foot-
long concrete dam and spillway containing eight 16.75-foot-high, 44-
foot-wide floodgates; (2) a 25-foot-high concrete curved auxiliary 
spillway; (3) a 500-acre impoundment with a gross storage capacity of 
6,869 acre-feet at the normal pool elevation of 550.7 feet National 
Geodetic Vertical Datum of 1929; (4) an intake section of Powerhouse A 
containing three 6.83-foot-wide, 17.92-foot-high steel, concrete, and 
timber gates and Powerhouse B containing two 6.67-foot-wide, 17.5-foot-
high timber gates; (5) a 105.5-foot-long, 83-foot-wide, 86-foot-high 
steel frame, concrete and brick Powerhouse A containing three vertical 
Francis turbine-generator units with a total installed capacity of 7.5 
megawatts (MW); (5) a 55-foot-long, 27-foot-wide, 84-foot-high steel 
frame, concrete and brick Powerhouse B containing two vertical Francis 
turbine-generator units with a total installed capacity of 5 MW; (6) a 
100-foot-wide, 250-foot-long tailrace below Powerhouse A; (7) a 60-
foot-wide, 50-foot-long tailrace below Powerhouse B; (8) a 280-foot-
long transmission line to three 5,210 kilovolt-ampere 4/34.5 kilovolt 
step-up transformers which are connected to the grid via a 24-foot-long 
overhead line; and (9) appurtenant facilities.
    The Reusens Project operates in a peaking mode with an average 
annual generation of 22,504 megawatt-hours between 2018 and 2021.
    m. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support.
    All filings must (1) bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name of the person 
submitting the filing; and (4) otherwise comply with the requirements 
of 18 CFR 385.2001 through 385.2005. All comments, recommendations, 
terms and conditions or prescriptions must set forth their evidentiary 
basis and otherwise comply with the requirements of 18 CFR 4.34(b). 
Agencies may obtain copies of the application directly from the 
applicant. Each filing must be accompanied by proof of service on all 
persons listed on the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as interventions, 
comments, or requests for rehearing, the public is encouraged to 
contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#59160909193f3c2b3a773e362f"><span class="__cf_email__" data-cfemail="37786767775152455419505841">[email&#160;protected]</span></a>.
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. The applicant must file no later than 60 days following the date 
of issuance of this notice: (1) a copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    o. Procedural Schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Filing of Comments, Recommendations,     July 12, 2025.
 Terms and Conditions, and
 Prescriptions.

[[Page 21920]]

 
Filing of Reply Comments...............  August 26, 2025.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.

    Dated: May 13, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-09196 Filed 5-21-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on May 22, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.