US SFR Owner, LLC.; Kemmerer Power Station, Unit 1; Environmental Assessment and Finding of No Significant Impact
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The U.S. Nuclear Regulatory Commission (NRC) staff is making a finding of no significant impact (FONSI) for a proposed issuance of an exemption in response to a February 28, 2025 request, as supplemented by letters dated April 7, and April 29, 2025, for the proposed Kemmerer Power Station Unit 1 (Kemmerer 1) facility. Specifically, TerraPower, LLC (TerraPower), on behalf of its wholly-owned subsidiary US SFR Owner, LLC (USO), requested an exemption that would modify a portion of the definition of construction applicable to the prohibition on construction of production and utilization facilities without an NRC license for the proposed Kemmerer 1. If granted, this exemption would allow the driving of piles, subsurface preparation, placement of backfill, concrete, or permanent retaining walls within an excavation, installation of foundations, or in-place assembly, erection, fabrication or testing, which are for structures, systems, and components (SSCs) classified as non-safety-related with no special treatment (NST) the failure of which could cause a reactor scram or actuation of a safety-related system that are located on the proposed Kemmerer 1 energy island prior to receipt of a construction permit (CP) and without a limited work authorization. The NRC staff is issuing a final Environmental Assessment (EA) and FONSI associated with the proposed exemption request.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.