Notice2025-07186

Agency Information Collection Activities; Renewable Energy on the Outer Continental Shelf and Alternate Uses of Existing Facilities on the Outer Continental Shelf

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
April 25, 2025

Issuing agencies

Interior DepartmentOcean Energy Management Bureau

Abstract

In accordance with the Paperwork Reduction Act of 1995, the Bureau of Ocean Energy Management (BOEM) proposes this information collection request (ICR) to renew Office of Management and Budget (OMB) control number 1010-0176 with revisions.

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 79 (Friday, April 25, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 79 (Friday, April 25, 2025)]
[Notices]
[Pages 17442-17448]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-07186]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Ocean Energy Management

[OMB Control Number 1010-0176; Docket ID: BOEM-2025-0003]


Agency Information Collection Activities; Renewable Energy on the 
Outer Continental Shelf and Alternate Uses of Existing Facilities on 
the Outer Continental Shelf

AGENCY: Bureau of Ocean Energy Management, Interior.

ACTION: Notice of information collection; request for comment.

-----------------------------------------------------------------------

SUMMARY: In accordance with the Paperwork Reduction Act of 1995, the 
Bureau of Ocean Energy Management (BOEM) proposes this information 
collection request (ICR) to renew Office of Management and Budget (OMB) 
control number 1010-0176 with revisions.

DATES: Comments must be received by BOEM no later than June 24, 2025.

ADDRESSES: Send written comments on this ICR by mail to the BOEM 
Information Collection Clearance Officer, Anna Atkinson, Bureau of 
Ocean Energy Management, 45600 Woodland Road, Sterling, Virginia 20166; 
or by email to <a href="/cdn-cgi/l/email-protection#2c4d42424d024d584745425f43426c4e434941024b435a"><span class="__cf_email__" data-cfemail="3c5d52525d125d485755524f53527c5e535951125b534a">[email&#160;protected]</span></a>. Please reference OMB control 
number 1010-0176 in the subject line of your comments. You may comment 
on the ICR and view related documents by searching for the docket 
number ``BOEM-2025-0003'' at <a href="https://www.regulations.gov">https://www.regulations.gov</a>.

FOR FURTHER INFORMATION CONTACT: Anna Atkinson by email at 
<a href="/cdn-cgi/l/email-protection#d1b0bfbfb0ffb0a5bab8bfa2bebf91b3beb4bcffb6bea7"><span class="__cf_email__" data-cfemail="c2a3acaca3eca3b6a9abacb1adac82a0ada7afeca5adb4">[email&#160;protected]</span></a>, or by telephone at 703-787-1025. Individuals in 
the United States who are deaf, deafblind, hard of hearing, or have a 
speech disability may dial 711 (TTY, TDD, or TeleBraille) to access 
telecommunications relay services. Individuals outside of the United 
States should use the relay services offered within their country to 
make international calls to the point of contact in the United States.

SUPPLEMENTARY INFORMATION: In accordance with the Paperwork Reduction 
Act of 1995, BOEM provides the general public and other Federal 
agencies with an opportunity to comment on new, proposed, revised, and 
continuing collections of information. This helps BOEM assess the 
impact of its information collection requirements and minimize the 
public's reporting burden. It also helps the public understand BOEM's 
information collection requirements and provide the requested data in 
the desired format.
    BOEM is soliciting comments on the proposed ICR described below. 
BOEM is especially interested in public comments addressing the 
following issues: (1) is the collection necessary to the proper 
functions of BOEM; (2) what can BOEM do to ensure that this information 
is processed and used in a timely manner; (3) is the burden estimate 
accurate; (4) how might BOEM enhance the quality, utility, and clarity 
of the information to be collected; and (5) how might BOEM minimize the 
burden of this collection on the respondents, including minimizing the 
burden through the use of information technology?
    Comments that you submit in response to this notice are a matter of 
public record. BOEM will include or summarize each comment in its ICR 
to OMB for approval of this information collection. You should be aware 
that your entire comment--including your address, phone number, email 
address, or other personally identifiable information included in your 
comment--may be made publicly available at any time. Even if BOEM 
withholds your personally identifiable information in the context of 
this ICR, your comment is subject to the Freedom of Information Act 
(FOIA) (5 U.S.C. 552). Your information will only be withheld if a 
determination is made that one of the FOIA exemptions to disclosure 
applies. Such a determination will be made in accordance with the 
Department of the Interior's (DOI) FOIA implementing regulations (43 
CFR part 2) and applicable law.
    In order for BOEM to consider withholding from disclosure your 
personally identifiable information, you must identify, in a cover 
letter, any information contained in the submittal of your comments 
that, if released, would constitute a clearly unwarranted invasion of 
your personal privacy. You must also briefly describe any possible 
harmful consequences of the disclosure of information, such as 
embarrassment, injury, or other harm. Note that BOEM will make 
available for public inspection, in their entirety, all comments 
submitted by organizations and businesses, or by individuals 
identifying themselves as representatives of organizations or 
businesses.
    BOEM protects proprietary information in accordance with FOIA, 
DOI's implementing regulations (43 CFR part 2), and 30 CFR part 580.70, 
promulgated pursuant to the Outer

[[Page 17443]]

Continental Shelf Lands Act (OCS Lands Act) (43 U.S.C. 1352(c)).
    Title of Collection: ``30 CFR part 585, Renewable Energy on the 
Outer Continental Shelf and 586, Alternate Uses of Existing Facilities 
on the Outer Continental Shelf.''
    Abstract: The ICR addresses the paperwork requirements in the 
regulations under 30 CFR parts 585 and 586 issued pursuant to the OCS 
Lands Act, as amended (43 U.S.C. 1331 et seq.). The OCS Lands Act at 
subsection 8(p) (43 U.S.C. 1337(p)) authorizes the Secretary of the 
Interior to issue leases, easements, or rights-of-way on the OCS for 
activities that produce or support production, transportation, or 
transmission of energy from sources other than oil and gas, including 
renewable energy. Subsection 8(p) directs the Secretary to issue any 
necessary regulations to carry out the OCS renewable energy program. 
The Secretary delegated this authority to BOEM. BOEM issued regulations 
for OCS renewable energy activities at 30 CFR parts 585 and 586; this 
notice concerns the reporting and recordkeeping elements required by 
these regulations.
    Respondents are parties interested in obtaining a lease or grant 
for renewable energy activities on the OCS; lessees and grantees 
submitting plans for commercial and noncommercial renewable energy 
projects on the OCS, and, if such plans are approved, constructing, 
operating, maintaining, and decommissioning those projects; and 
applicants for, or holders of, rights-of-use and easement for alternate 
uses of existing facilities on the OCS. BOEM must ensure that these 
activities are carried out in a manner that provides for, among other 
things, safety, protection of the environment, and consideration of 
other OCS users. In order to execute its duties, BOEM requires 
information regarding potential purchasers of leases, grants, and 
rights-of-way; their proposed activities; their financial assurance 
instruments to ensure accrued obligations are met; and their payments 
to the U.S. Treasury.
    BOEM uses forms to collect information to ensure proper and 
efficient administration of OCS renewable energy leases and grants and 
to document the financial responsibility of lessees and grantees. Forms 
BOEM-0002, BOEM-0003, BOEM-0004, and BOEM-0006 are used, respectively, 
by renewable energy entities on the OCS to assign a grant interest, 
assign a lease interest, relinquish a lease or grant, and designate an 
operator. Form BOEM-0005 is used to document a surety's guarantee of 
lessees' and grantees' performance. BOEM maintains the submitted forms 
as official lease and grant records.
    OMB Control Number: 1010-0176.
    Form Number:
    <bullet> BOEM-0002, ``Outer Continental Shelf (OCS) Renewable 
Energy Assignment of Grant;''
    <bullet> BOEM-0003, ``Assignment of Record Title Interest in 
Federal OCS Renewable Energy Lease;''
    <bullet> BOEM-0004, ``Outer Continental Shelf (OCS) Renewable 
Energy Lease or Grant Relinquishment Application;''
    <bullet> BOEM-0005, ``Outer Continental Shelf (OCS) Renewable 
Energy Lessee's, Grantee's, and Operator's Bond;'' and
    <bullet> BOEM-0006, ``Outer Continental Shelf (OCS) Renewable 
Energy Lease or Grant Designation of Operator.''
    Type of Review: Extension of a currently approved collection.
    Respondents/Affected Public: Companies interested in renewable 
energy-related uses on the OCS and holders of leases and grants under 
30 CFR parts 585 and 586.
    Total Estimated Number of Annual Responses: 485 responses.
    Total Estimated Number of Annual Burden Hours: 44,178 hours.
    Respondent's Obligation: Mandatory or required to retain or obtain 
a benefit.
    Frequency of Collection: On occasion or annually.
    Total Estimated Annual Non-Hour Burden Cost: $2,754,000 non-hour 
cost burden.
    Estimated Reporting and Recordkeeping Hour Burden: The estimated 
annual hour burden for this collection is 44,178 hours, 485 responses 
and $2,754,000 non-hour cost burdens. The existing approval is 9,876 
annual burden hours, 200 annual responses, and $1,908,000 non-hour cost 
burdens.
    BOEM is updating the overall burden numbers for this OMB control 
number to align with the recent increase in development activity and to 
reflect more realistically the manner by which conditional approvals 
have been used to increase the number and scope of compliance 
requirements compared to previous estimates. BOEM sets conditions of 
approval for activities on the OCS to ensure compliance with 
regulations and project-specific requirements. BOEM has several 
projects under current leases that recently entered the planning phase, 
and therefore, these annual burden hours were not counted in the last 
ICR renewal. BOEM is increasing the annual burden hours to reflect the 
increase related to the terms and conditions of approval of these 
projects. The adjustments to the numbers in the burden table for this 
revision are estimates based on BOEM's knowledge and expertise of the 
industry and requirements associated with offshore wind projects.
    BOEM is also rolling the annual burdens under OMB control number 
1010-0195 into this revision of 1010-0176. In 2024, BOEM had two 
rulemakings tied to 30 CFR 585 and 586. In order to account for the PRA 
work and for OMB to track the collections of information, BOEM used two 
OMB control numbers, 1010-0176 and 1010-0195. With the completion of 
these rulemakings, this revision of OMB control number 1010-0176 will 
bring all the information collection burdens under one control number, 
and BOEM will discontinue 1010-0195.
    Overall, this ICR increases annual burdens by 34,302 hours to a new 
total of 44,178 hours. This ICR increases responses by 285 responses to 
a new total of 485 and increases the non-hour cost burdens by $846,000 
to a new total of $2,754,000.
    On January 20, 2025, the Presidential memorandum, Temporary 
Withdrawal of All Ares on the Outer Continental Shelf from Offshore 
Wind Leasing and Review of the Federal Government's Leasing and 
Permitting Practices for Wind Projects, was issued. With the hold on 
wind leasing, BOEM will likely see a decrease in annual burden hours on 
future renewals of OMB control number 1010-0176, but for this ICR we 
are continuing to account of the leases moving through the approval 
process.
    The following table details the individual components and estimated 
hour burdens. In calculating the burdens, BOEM recognized that some of 
its required information collections are incurred by respondents in the 
normal course of their activities, like compiling and maintaining 
business records. BOEM considers some information collection activities 
to be usual and customary business practices and excluded those 
activities from its account in estimating the burden.

[[Page 17444]]



                                                  Burden Table
----------------------------------------------------------------------------------------------------------------
                                           Reporting and                                                Annual
       Section(s) in 30 CFR 585            recordkeeping         Hour     Average number of annual      burden
                                          requirement \1\       burden            responses             hours
----------------------------------------------------------------------------------------------------------------
                                                                                  Non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
                                          Subpart A--General Provisions
----------------------------------------------------------------------------------------------------------------
102(e)...............................  Affected State and           275  6 meetings or agreements..        1,650
                                        local governments
                                        enter into and
                                        participate in task
                                        forces, joint
                                        planning or
                                        coordination
                                        agreements after
                                        BOEM invitation.
103; 586.104.........................  Request general               24  5 requests................          120
                                        departures not
                                        specifically covered
                                        elsewhere in part
                                        585.
105(c); 586.105(c)...................  Make oral requests or         24  3 requests................           72
                                        notifications and
                                        submit written
                                        follow up within 3
                                        business days not
                                        specifically covered
                                        elsewhere in part
                                        585.
107; 108; 230(f); 302(a); 409(c);      Submit evidence of            24  5 submissions.............          120
 586.107; 586.203-.213.                 qualifications to
                                        hold a lease or
                                        grant; submit
                                        required supporting
                                        information
                                        (electronically if
                                        required).
                                        Qualifications
                                        include
                                        demonstrating that
                                        you have the
                                        technical and
                                        financial
                                        capabilities to
                                        conduct the
                                        activities
                                        authorized by the
                                        lease or grant.
107(b)(1)............................  Request exception             15  1 exception...............           15
                                        from exclusion or
                                        disqualification
                                        from participating
                                        in transactions
                                        covered by Federal
                                        non-procurement
                                        debarment and
                                        suspension system.
                                                             ---------------------------------------
106(b)(2), 107(b); 118(c); 315(b);     Request                Requirement not considered IC under 5            0
 436; 527(f); 586.107.                  reconsideration and/  CFR 1320.3(h)(9).
                                        or hearing.
                                                             ---------------------------------------
109; 530(b)..........................  Notify BOEM within 3           2  1 notice..................            2
                                        business days after
                                        learning of any
                                        action filed
                                        alleging respondent
                                        is insolvent or
                                        bankrupt.
                                                             ---------------------------------------
110..................................  Notify BOEM in         Requirement not considered IC under 5            0
                                        writing of merger,    CFR 1320.3(h)(1).
                                        name change, or
                                        change of business
                                        form no later than
                                        120 days after
                                        earliest of either
                                        the effective date
                                        or filing date.
                                                             ---------------------------------------
112(b)(5)............................  Within 30 days of              1  1 submission..............            1
                                        receiving bill,
                                        submit processing
                                        fee payments for
                                        BOEM document or
                                        study preparation to
                                        process applications
                                        and other requests.
                                                             ---------------------------------------------------
                                       .....................             1 payments x $4,000 = $4,000
                                                             ---------------------------------------------------
112(b)(2), (3).......................  Submit comments on           550  2 requests................        1,100
                                        proposed processing
                                        fee or request
                                        approval to perform
                                        or directly pay
                                        contractor for all
                                        or part of any
                                        document, study, or
                                        other activity, to
                                        reduce BOEM
                                        processing costs.
112(b)...............................  Perform, conduct,          2,500  1 submission..............        2,500
                                        develop, etc., all
                                        or part of any
                                        document, study, or
                                        other activity; and
                                        provide results to
                                        BOEM to reduce BOEM
                                        processing fee.
                                                             ---------------------------------------------------
112(b)...............................  Pay processing fee        1 studies payments x $2,750,000 = $2,750,000
                                        for all or part of
                                        any document, study,
                                        or other activity,
                                        and provide results
                                        to BOEM to reduce
                                        BOEM processing
                                        costs.
                                                             ---------------------------------------
118(a); 436(c); 112(b)(7)............  Except as stated in    Exempt under 5 CFR 1320.4(a)(2), (c).            0
                                        paragraph (c), any
                                        party adversely
                                        affected by a final
                                        decision issued by
                                        BOEM under this part
                                        may appeal that
                                        decision to the
                                        Interior Board of
                                        Land Appeals (IBLA),
                                        under part 590 of
                                        this chapter and 43
                                        CFR part 4, subpart
                                        E.
                                                             ---------------------------------------
118(c)...............................  Within 15 days of bid  Requirement not considered IC under 5            0
                                        rejection, a bidder   CFR 1320.3(h)(9).
                                        may request
                                        reconsideration of
                                        bid decision or
                                        rejection in writing
                                        to the Director.
                                        Appeals must be
                                        accompanied by a
                                        statement of reasons.
                                                                        ----------------------------------------
    Subtotal.........................  .....................  .........  25 responses..............        5,580
                                                             ---------------------------------------------------
                                       .....................  .........         $2,754,000 non-hour costs
----------------------------------------------------------------------------------------------------------------
                               Subpart C--Issuance of OCS Renewable Energy Leases
----------------------------------------------------------------------------------------------------------------
200; 224; 231; 235; 236; 238.........  These sections contain references to information                        0
                                        submissions, approvals, requests, applications, plans,
                                        payments, etc., the burdens for which are covered elsewhere
                                        in part 585.
                                      --------------------------------------------------------------
210; 211(a-c); 212 thru 216..........  Submit nominations     Not considered IC as defined in 5 CFR            0
                                        and general comments  1320.3(h)(4).
                                        in response to
                                        Federal Register
                                        notices on Request
                                        for Interest in OCS
                                        Leasing, Call for
                                        Information and
                                        Nominations (Call),
                                        Area Identification,
                                        and Notices of Sale.
                                        Includes industry,
                                        State & local
                                        governments.
                                                             ---------------------------------------
210; 211(a-c); 212 thru 216..........  Submit comments and           24  1 comment.................           24
                                        required information
                                        in response to
                                        Federal Register
                                        notices on Request
                                        for Interest in OCS
                                        Leasing, Call for
                                        Information and
                                        Nominations (Call),
                                        Area Identification,
                                        and Notices of Sale.
                                        Includes industry,
                                        State & local
                                        governments.
220 thru 223.........................  Submit bid, payments,          5  1 bid.....................            5
                                        and required
                                        information in
                                        response to Federal
                                        Register Final Sale
                                        Notice.
225(b)...............................  Within 10 business             1  1 lease execution.........            1
                                        days, execute 3
                                        copies of lease form
                                        and return to BOEM
                                        with required
                                        payments, including
                                        evidence that agent
                                        is authorized to act
                                        for bidder; if
                                        applicable, submit
                                        information to
                                        support delay in
                                        execution--competiti
                                        ve leases.
225(f)...............................  The winning bidder             8  1 payment.................            8
                                        must pay the first
                                        12 months' rent
                                        under Sec.
                                        585.503(a) within 45
                                        calendar days after
                                        receiving a copy of
                                        the executed lease
                                        from BOEM.
230; 231(a)..........................  Submit unsolicited             5  1 request.................            5
                                        request and
                                        acquisition fee for
                                        a commercial or
                                        limited lease.
231(b)...............................  Submit comments in            24  5 comment.................          120
                                        response to Federal
                                        Register notice re-
                                        interest of
                                        unsolicited request
                                        for a lease.
231(h)(1)............................  Within 10 business             2  1 lease...................            2
                                        days of receiving
                                        lease documents,
                                        execute and return
                                        lease; file
                                        financial assurance
                                        and supporting
                                        documentation--nonco
                                        mpetitive leases.
                                                             ---------------------------------------

[[Page 17445]]

 
231(h)(2)............................  Within 45 days of      Burdens covered by information                   0
                                        receiving lease       collections approved for ONRR 30 CFR
                                        copies, submit        Chapter XII.
                                        payment of the first
                                        12 months' rent.
                                                             ---------------------------------------
235(b); 236(b).......................  Request additional             1  3 requests................            3
                                        time to extend
                                        preliminary period
                                        of commercial or
                                        limited lease,
                                        including revised
                                        schedule for SAP,
                                        COP, or GAP
                                        submission.
237(b)...............................  Request lease be               1  1 request.................            1
                                        dated and effective
                                        1st day of month in
                                        which signed.
238..................................  Submit request for             4  1 request.................            4
                                        development of
                                        commercial lease in
                                        phases. Request must
                                        be supported with
                                        details as to which
                                        portions of the
                                        lease will be
                                        reserved for
                                        subsequent phased
                                        development.
                                                                        ----------------------------------------
    Subtotal.........................  .....................  .........  16 responses..............          173
----------------------------------------------------------------------------------------------------------------
                      Subpart D--ROW Grants and RUE Grants for Renewable Energy Activities
----------------------------------------------------------------------------------------------------------------
306; 309; 315; 316...................  These sections contain references to information                        0
                                        submissions, approvals, requests, applications, plans,
                                        payments, etc., the burdens for which are covered elsewhere
                                        in part 585.
                                      --------------------------------------------------------------
302(a); 305; 306.....................  Submit copies of a             5  1 request.................            5
                                        request for a new or
                                        modified ROW or RUE
                                        and required
                                        information,
                                        including
                                        qualifications to
                                        hold a grant, in
                                        format specified.
307; 308(a)(1).......................  Submit information in         24  100 comments..............        2,400
                                        response to Federal
                                        Register notice of
                                        proposed ROW or RUE
                                        grant area or
                                        comments on notice
                                        of grant auction.
                                        Comment period will
                                        be 30 days.
308(a)(2), (b); 316..................  Submit bid and                 5  12 bids...................           60
                                        payments in response
                                        to Federal Register
                                        notice of auction
                                        for a ROW or RUE
                                        grant. Successful
                                        bidder in an auction
                                        must pay the first
                                        year's rent, as
                                        provided in Sec.
                                        585.316.
306, 309.............................  Submit decision to             2  4 submissions.............            8
                                        accept or reject
                                        terms and conditions
                                        of noncompetitive
                                        ROW or RUE grant.
                                        ROW or RUE grant
                                        becomes effective on
                                        the date established
                                        by BOEM.
                                                                        ----------------------------------------
    Subtotal.........................  .....................  .........  117 responses.............        2,473
----------------------------------------------------------------------------------------------------------------
                                    Subpart E--Lease and Grant Administration
----------------------------------------------------------------------------------------------------------------
400; 405; 409; 416, 433..............  These sections         .........  ..........................            0
                                        contain references
                                        to information
                                        submissions,
                                        approvals, requests,
                                        applications, plans,
                                        payments, etc., the
                                        burdens for which
                                        are covered
                                        elsewhere in part
                                        585..
                                      --------------------------------------------------------------
405(a)...............................  If designated                  1  1 designation.............            1
                                        operator is not the
                                        lessee or grant
                                        holder, they must be
                                        identified in the
                                        SAP (under Sec.
                                        585.610(a)(3)), COP
                                        (under Sec.
                                        585.626(a)(2)), or
                                        GAP (under Sec.
                                        585.645(a)(2)), as
                                        applicable.
                                       If no operator is
                                        designated in a SAP,
                                        COP, or GAP, BOEM
                                        will deem the lessee
                                        or grant holder to
                                        be the operator..
                                                             ---------------------------------------
405(d)...............................  Submit written notice  Requirement not considered IC under 5            0
                                        of change of address. CFR 1320.3(h)(1).
                                                             ---------------------------------------
405(e); Form BOEM-0006...............  If designated                  2  2 notices.................            4
                                        operator (DO)
                                        changes, notify BOEM
                                        and identify new DO
                                        for BOEM approval
                                        within 72 hours.
408 thru 411; Forms BOEM-0002 and      Within 90 days after           1  2 requests/submissions....            2
 BOEM-0003.                             last party executes
                                        a transfer
                                        agreement, submit
                                        copies of a lease or
                                        grant assignment
                                        application,
                                        including originals
                                        of each instrument
                                        creating or
                                        transferring
                                        ownership of record
                                        title, eligibility
                                        and other
                                        qualifications; and
                                        evidence that agent
                                        is authorized to
                                        execute assignment,
                                        in format specified.
413(d)...............................  BOEM will default to          10  10 requests...............          100
                                        using the terms and
                                        conditions in the
                                        most recently issued
                                        lease or grant to be
                                        consolidated for the
                                        new lease. BOEM will
                                        consider requests
                                        for modifications on
                                        a case-by-case basis
                                        and, in its
                                        discretion, approve
                                        such requests for
                                        good cause.
416(a); 420(a), (b); 428(b)..........  Submit request for            10  1 request.................           10
                                        suspension and
                                        required information/
                                        payment no later
                                        than 90 days prior
                                        to lease or grant
                                        expiration.
416(b)...............................  If unable to timely          250  3 requests................          750
                                        submit a COP or GAP,
                                        may request a
                                        suspension to extend
                                        the preliminary
                                        period of lease or
                                        grant. Request must
                                        include a revised
                                        schedule for
                                        submission of COP or
                                        GAP.
426; 652(a); 235(a), (b).............  Request lease or             250  1 request.................          250
                                        grant renewal no
                                        later than 180 days
                                        before termination
                                        date of your limited
                                        lease or grant, or
                                        no later than 2
                                        years before
                                        termination date of
                                        operations term of
                                        commercial lease.
                                        Submit required
                                        information.
433..................................  After your lease or           72  1 submission..............           72
                                        grant terminates,
                                        you must make all
                                        payments due,
                                        including any
                                        accrued rentals and
                                        deferred bonuses;
                                        and perform any
                                        other outstanding
                                        obligations under
                                        the lease or grant
                                        within 6 months.
435; 658(c)(2); Form BOEM-0004.......  Submit copies of               1  1 submission..............            1
                                        application to
                                        relinquish lease or
                                        grant, in format
                                        specified. ONRR will
                                        bill for outstanding
                                        payments.
                                                             ---------------------------------------------------
436; 437.............................  Provide information    Requirement not considered IC under 5            0
                                        for reconsideration   CFR 1320.3(h)(9).
                                        of BOEM decision to
                                        contract or cancel
                                        lease or grant area.
                                                             ---------------------------------------------------
    Subtotal.........................  .....................  .........  22 responses..............        1,190
----------------------------------------------------------------------------------------------------------------

[[Page 17446]]

 
                            Subpart F--Payments and Financial Assurance Requirements
----------------------------------------------------------------------------------------------------------------
An * indicates the primary cites for providing bonds or other financial assurance, and the burdens             0
 include any previous or subsequent references throughout part 585 to furnish, replace, or provide
 additional bonds, securities, or financial assurance (including riders, cancellations,
 replacements). This subpart contains references to other information submissions, approvals,
 requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585. In
 the future BOEM may require electronic filings of certain submissions.
----------------------------------------------------------------------------------------------------------------
500 thru 509; 586.211................  Submit payer           Burden covered by information                    0
                                        information,          collections approved for ONRR 30 CFR
                                        payments and payment  Chapter XII.
                                        information, and
                                        maintain auditable
                                        records according to
                                        ONRR regulations or
                                        guidance.
                                                             ---------------------------------------
506..................................  Submit documentation   Burden covered under DOE/EIA OMB                 0
                                        of the gross annual   Control Number 1905-0129
                                        generation of
                                        electricity produced
                                        by the generating
                                        facility on the
                                        lease--use same form
                                        as authorized by the
                                        EIA. Submit
                                        operating fee
                                        payments to ONRR.
                                                             ---------------------------------------------------
510; 506(c)(1).......................  Submit to the BOEM             3  1 submission..............            3
                                        Director, an
                                        application and
                                        required information
                                        for waiver or
                                        reduction of rental
                                        or other payment..
* 516; 525(a) thru (f)...............  Execute and provide a          3  6 bonds...................           18
                                        bond or other
                                        authorized financial
                                        assurance in the
                                        amount of 12 months'
                                        rent.
* 516(a)(1), (b), (c); 517; 525(a)     Execute and provide            3  6 bonds...................           18
 thru (f).                              commercial lease
                                        supplemental bonds
                                        in amounts of 12
                                        months' rent.
516(a)(2),(3); 521(c)................  Execute and provide            3  6 bonds...................           18
                                        decommissioning bond
                                        or other financial
                                        assurance; schedule
                                        for providing the
                                        appropriate amount.
517(b)(1)............................  Submit comments on             5  1 submission..............            5
                                        proposed adjustment
                                        to bond amounts.
517(b)(2)............................  Request bond                   5  6 requests................           30
                                        reduction and submit
                                        evidence to justify.
* 520; 521; 525(a) thru (e); Form      Execute and provide a          3  6 bonds...................           18
 BOEM-0005.                             bond or other
                                        authorized financial
                                        assurance in the
                                        amount of 12 months'
                                        rent.
525(g)...............................  Surety notice to               2  1 surety notices..........            2
                                        lessee or ROW/RUE
                                        grant holder and
                                        BOEM within 5
                                        business days after
                                        initiating surety
                                        insolvency or
                                        bankruptcy
                                        proceeding, or
                                        Treasury decertifies
                                        surety.
* 526 Form BOEM-0005.................  In lieu of surety              2  1 pledge..................            2
                                        bond, pledge other
                                        types of securities,
                                        including authority
                                        for BOEM to sell and
                                        use proceeds and
                                        submit required
                                        information (1 hour
                                        for form).
526(c)...............................  Provide annual                10  1 statement...............           10
                                        certified statements
                                        describing the
                                        nature and market
                                        value, including
                                        brokerage firm
                                        statements/reports.
* 527................................  Demonstrate financial         10  11 demonstrations.........          110
                                        worth/ability to
                                        carry out present
                                        and future financial
                                        obligations, annual
                                        updates, and related
                                        or subsequent
                                        actions/records/
                                        reports, etc.
528..................................  Provide third-party           10  1 submission..............           10
                                        indemnity; financial
                                        information/
                                        statements;
                                        additional bond
                                        information;
                                        executed guarantor
                                        agreement and
                                        supporting
                                        information/
                                        documentation/
                                        agreements.
528(d)(5)............................  If you or your                 2  2 guarantor actions.......            4
                                        operator fail to
                                        comply with any law,
                                        term, or regulation,
                                        your guarantor must
                                        either take
                                        corrective action or
                                        provide, within 7
                                        calendar days or
                                        other agreed-upon
                                        time period,
                                        sufficient funds, up
                                        to the value of the
                                        guaranty, for BOEM
                                        to complete
                                        corrective action.
528(d)(6); 532(b)....................  Guarantor/Surety               1  1 request.................            1
                                        requests BOEM
                                        terminate period of
                                        liability and
                                        notifies lessee or
                                        ROW/RUE grant
                                        holder, etc.
528(e)...............................  Before the                     3  6 submissions.............           18
                                        termination of your
                                        guaranty, you must
                                        provide an
                                        acceptable
                                        replacement in the
                                        form of a bond or
                                        other security.
* 529................................  In lieu of surety              2  1 request.................            2
                                        bond, request
                                        authorization to
                                        establish
                                        decommissioning
                                        account, including
                                        written
                                        authorizations and
                                        approvals associated
                                        with account..
530..................................  Notify BOEM promptly           5  1 notice..................            5
                                        (within 3 business
                                        days) of lapse in
                                        bond or other
                                        security/action
                                        filed alleging
                                        lessee, surety or
                                        guarantor et al is
                                        insolvent or
                                        bankrupt.
531..................................  If the value of your           1  1 submission..............            1
                                        financial assurance
                                        is reduced below the
                                        required financial
                                        assurance amount
                                        because of a default
                                        or any other reason,
                                        you must provide
                                        additional financial
                                        assurance sufficient
                                        to meet the
                                        requirements of this
                                        subpart within 45
                                        days or within a
                                        different period as
                                        specified by BOEM.
533(a)(2)............................  Provide agreement              3  1 submission..............            3
                                        from surety issuing
                                        new bond to assume
                                        all or portion of
                                        outstanding
                                        liabilities.
536(b)...............................  Within 10 business            16  1 demonstration...........           16
                                        days following BOEM
                                        notice, lessee,
                                        grant holder, or
                                        surety agrees to and
                                        demonstrates to BOEM
                                        that lease will be
                                        brought into
                                        compliance.
                                                                        ----------------------------------------
    Subtotal.........................  .....................  .........  61 responses..............          294
----------------------------------------------------------------------------------------------------------------
                                  Subpart G--Plans and Information Requirements
----------------------------------------------------------------------------------------------------------------
Two ** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations                0
 Plans (COPs), and General Activities Plans (GAPs); and the burdens include any previous or
 subsequent references throughout part 585 to submission and approval. This subpart contains
 references to other information submissions, approvals, requests, applications, plans, etc., the
 burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
** 600(a)(1); 601(a), (b); 605 thru    Within time specified        192  1 SAP.....................          192
 614; 238.                              after issuance of a
                                        competitive lease or
                                        grant, or within
                                        time specified after
                                        determination of no
                                        competitive
                                        interest, submit
                                        copies of SAP,
                                        including required
                                        information to
                                        assist BOEM to
                                        comply with NEPA/
                                        CZMA such as hazard
                                        info, air quality,
                                        SEMS, and all
                                        required
                                        information,
                                        certifications,
                                        requests, etc., in
                                        format specified.
** 600(a)(2); 601(b); 606(b); 618;     If requesting an             800  2 COP submittals..........        1,600
 620 thru 628; 632; 633.                operations term for
                                        commercial lease,
                                        within time
                                        specified before the
                                        end of site
                                        assessment term,
                                        submit copies of
                                        COP, or FERC license
                                        application,
                                        including required
                                        information to
                                        assist BOEM to
                                        comply with NEPA/
                                        CZMA such as hazard
                                        info, air quality,
                                        SEMS, and all
                                        required
                                        information, surveys
                                        and/or their
                                        results, reports,
                                        certifications,
                                        project easements,
                                        supporting data and
                                        information,
                                        requests, etc., in
                                        format specified.

[[Page 17447]]

 
                                                                  3,848  8 projects complying with    \1\ 30,784
                                                                          terms and conditions.
** 600(a)(3); 601(c); 640 thru 648;    Within time specified        192  1 GAP.....................          192
 651; 238.                              after issuance of a
                                        competitive lease or
                                        grant, or within
                                        time specified after
                                        determination of no
                                        competitive
                                        interest, submit
                                        copies of GAP,
                                        including required
                                        information to
                                        assist BOEM to
                                        comply with NEPA/
                                        CZMA such as hazard
                                        info, air quality,
                                        SEMS, and all
                                        required
                                        information, surveys
                                        and reports,
                                        certifications,
                                        project easements,
                                        requests, etc., in
                                        format specified.
** 601(b); 622; 628(f)(2); 634;        Submit revised or             40  1 revised or modified COP.           40
 658(c)(3).                             modified COPs,
                                        including project
                                        easements, and all
                                        required additional
                                        information.
** 613(a), (d), (e); 617.............  Submit revised or             50  1 revised or modified SAP.           50
                                        modified SAPs and
                                        required additional
                                        information.
612; 647.............................  Submit copy of SAP or          1  2 leases..................            2
                                        GAP consistency
                                        certification and
                                        supporting
                                        documentation,
                                        including
                                        noncompetitive
                                        leases.
615..................................  Prepare and submit to         43  2 reports.................           86
                                        BOEM a report
                                        annually on November
                                        1st of each year
                                        that summarizes your
                                        site assessment
                                        activities and the
                                        results of those
                                        activities.
617(a)...............................  Notify BOEM in                10  25 notices................          250
                                        writing before
                                        conducting any site
                                        assessment
                                        activities not
                                        approved, or
                                        provided for, in
                                        SAP; provide
                                        additional
                                        information if
                                        requested.
618(c)...............................  If, following the             24  1 action..................           24
                                        technical and
                                        environmental review
                                        of your submitted
                                        COP, BOEM determines
                                        that such facilities
                                        may not remain in
                                        place, you must
                                        initiate the
                                        decommissioning
                                        process, as provided
                                        in 30 CFR part 285,
                                        subpart I.
631..................................  Request deviation              2  6 requests................           12
                                        from approved COP
                                        schedule.
633(b)...............................  Submit annual, or at          45  1 certification...........           45
                                        other time periods
                                        as BOEM determines,
                                        COP compliance
                                        certification,
                                        effectiveness
                                        statement,
                                        recommendations,
                                        reports, supporting
                                        documentation, etc.
634(a)...............................  Notify BOEM in                10  1 notice..................           10
                                        writing before
                                        conducting any
                                        activities not
                                        approved or provided
                                        for in COP, and
                                        provide additional
                                        information if
                                        requested.
** 642(b); 648; 655; 658(c)(3).......  Submit revised or             50  1 revised or modified GAP.           50
                                        modified GAPs and
                                        required additional
                                        information.
651..................................  Before beginning             200  1 survey/report...........          200
                                        construction of OCS
                                        facility described
                                        in GAP, complete
                                        survey activities
                                        identified in GAP
                                        and submit initial
                                        findings. [This only
                                        includes the time
                                        involved in
                                        submitting the
                                        findings; it does
                                        not include the
                                        survey time as these
                                        surveys would be
                                        conducted as good
                                        business practice.].
653..................................  Notify BOEM in                 4  2 notices.................            8
                                        writing within 30
                                        days of completing
                                        installation
                                        activities under the
                                        GAP.
653..................................  Submit annual report          43  4 reports.................          172
                                        summarizing findings
                                        from activities
                                        conducted under
                                        approved GAP.
655(a)...............................  Notify BOEM in                10  1 notice..................           10
                                        writing before
                                        conducting any
                                        activities not
                                        approved or provided
                                        for in GAP, and
                                        provide additional
                                        information if
                                        requested.
656..................................  Notify BOEM any time           4  4 notices.................           16
                                        approved GAP
                                        activities cease
                                        without an approved
                                        suspension.
658(c)(1)............................  If after                       3  1 notice/evidence.........            3
                                        construction, cable
                                        or pipeline deviate
                                        from approved COP or
                                        GAP, notify affected
                                        lease operators and
                                        ROW/RUE grant
                                        holders of deviation
                                        and provide BOEM
                                        evidence of such
                                        notices.
659, 700.............................  Determine appropriate         70  5 reports/information.....          350
                                        air quality modeling
                                        protocol, conduct
                                        air quality
                                        modeling, and submit
                                        3 copies of air
                                        quality modeling
                                        report and 3 sets of
                                        digital files as
                                        supporting
                                        information to plans.
                                                                        ----------------------------------------
    Subtotal.........................  .....................  .........  71 responses..............       34,096
----------------------------------------------------------------------------------------------------------------
 Subpart H--Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted
                                           Under SAPs, COPs, and GAPs
----------------------------------------------------------------------------------------------------------------
701(c), (d)..........................  Notify BOEM if                 1  150 notices...............          150
                                        endangered or
                                        threatened species,
                                        or their designated
                                        critical habitat,
                                        may be in the
                                        vicinity of the
                                        lease or grant or
                                        may be affected by
                                        lease or grant
                                        activities.
701(e), (f)..........................  Submit information to         18  3 submissions.............           54
                                        ensure proposed
                                        activities will be
                                        conducted in
                                        compliance with the
                                        Endangered Species
                                        Act (ESA) and Marine
                                        Mammal Protection
                                        Act (MMPA);
                                        including agreements
                                        and mitigating
                                        measures designed to
                                        avoid or minimize
                                        adverse effects and
                                        incidental take of
                                        endangered species
                                        or critical habitat.
702(b), (c)..........................  If requested, conduct         10  4 reports.................           40
                                        further
                                        archaeological
                                        investigations, and
                                        submit report/
                                        information.
702(d)...............................  If applicable, submit         .5  2 payments................            1
                                        payment for BOEM
                                        costs in carrying
                                        out National
                                        Historic
                                        Preservation Act
                                        responsibilities.
703..................................  If required, conduct          15  2 surveys/reports.........           30
                                        additional surveys
                                        to define boundaries
                                        and avoidance
                                        distances and submit
                                        report.
605; 651.............................  Submit safety                 16  2 submissions.............           32
                                        management system
                                        description with the
                                        SAP, COP, or GAP.
                                                                        ----------------------------------------
    Subtotal.........................  .....................  .........  163 responses.............          307
----------------------------------------------------------------------------------------------------------------
            30 CFR 586--RUEs for Energy- and Marine-Related Activities Using Existing OCS Facilities
----------------------------------------------------------------------------------------------------------------
200-202..............................  Contact owner of              36  1 request.................           36
                                        existing facility
                                        and/or lessee of the
                                        area to reach
                                        preliminary
                                        agreement to use
                                        facility and obtain
                                        concurring
                                        signatures; submit
                                        request to BOEM for
                                        an alternative use
                                        RUE, including all
                                        required information/
                                        modifications.
203(a)-(c)...........................  Submit indication of           4  1 submission..............            4
                                        competitive interest
                                        in response to
                                        Federal Register
                                        notice.
203(c)...............................  Submit description of          5  3 submissions.............           15
                                        proposed activities
                                        and required
                                        information in
                                        response to Federal
                                        Register notice of
                                        competitive offering.
203(f)...............................  Lessee or owner of             1  1 submission..............            1
                                        facility submits
                                        decision to accept
                                        or reject proposals
                                        deemed acceptable by
                                        BOEM.
210(c)...............................  Request renewal of             6  1 request.................            6
                                        Alternate Use RUE.

[[Page 17448]]

 
211; 216(b)..........................  Provide financial              1  1 submission..............            1
                                        assurance as BOEM
                                        determines in
                                        approving RUE for an
                                        existing facility,
                                        including additional
                                        security if required.
213..................................  Submit request for             1  1 request.................            1
                                        assignment of an
                                        alternative use RUE
                                        for an existing
                                        facility, including
                                        all required
                                        information..
215..................................  Request                        1  1 request.................            1
                                        relinquishment of
                                        RUE for an existing
                                        facility.
                                                                        ----------------------------------------
    Subtotal.........................  .....................  .........  10 responses..............           65
                                                                        ----------------------------------------
        Total burden.................  .....................  .........  485 responses.............       44,178
                                                                        ----------------------------------------
                                                                             $2,754,000 Non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
\1\ The annual burden hour reflects the projects in construction phase complying with the COP terms and
  conditions annually.

    An agency may not conduct or sponsor, and a person is not required 
to respond to, a collection of information unless it displays a 
currently valid OMB control number.
    The authority for this action is the Paperwork Reduction Act of 
1995 (44 U.S.C. 3501 et seq.).

Karen Thundiyil,
Director, Office of Regulatory Affairs, Bureau of Ocean Energy 
Management.
[FR Doc. 2025-07186 Filed 4-24-25; 8:45 am]
BILLING CODE 4340-98-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on April 25, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.