Notice2025-05310
3R Valve; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
March 28, 2025
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 90 Issue 59 (Friday, March 28, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 59 (Friday, March 28, 2025)]
[Notices]
[Pages 14134-14135]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-05310]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD25-3-000]
3R Valve; Notice of Preliminary Determination of a Qualifying
Conduit Hydropower Facility and Soliciting Comments and Motions To
Intervene
On March 17, 2025, 3R Valve filed a notice of intent to construct a
qualifying conduit hydropower facility, pursuant to section 30 of the
Federal Power Act (FPA). The proposed Aquifer Pumped Hydro Project
would have an installed capacity of 50 kilowatts (kW) and would be
located at the Willow Springs Water Bank, also know as Antelope Valley
Water Storage, near Rosamond, Kern County, California.
Applicant Contact: Lon W. House, Water and Energy Consulting, 10645
N Oracle Rd., Ste. 121-216, Oro Valley, AZ 85704, 530-409-9702,
<a href="/cdn-cgi/l/email-protection#dbb7b4b5acb3b4aea8be9bbcb6bab2b7f5b8b4b6"><span class="__cf_email__" data-cfemail="8be7e4e5fce3e4fef8eecbece6eae2e7a5e8e4e6">[email protected]</span></a>.
FERC Contact: Christopher Chaney, 202-502-6778,
<a href="/cdn-cgi/l/email-protection#0c6f647e657f78637c64697e226f646d6269754c6a697e6f226b637a"><span class="__cf_email__" data-cfemail="593a312b302a2d3629313c2b773a3138373c20193f3c2b3a773e362f">[email protected]</span></a>.
Qualifying Conduit Hydropower Facility Description: The project
would consist of: (1) one pump as turbine generating unit with a
capacity of 50 kW and (2) appurtenant facilities. The proposed project
would have an estimated annual generation of approximately 14.2
megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................ The conduit the Y
facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i)............. The facility is Y
constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii)............ The facility has an Y
installed capacity
that does not exceed
40 megawatts.
FPA 30(a)(3)(C)(iii)........... On or before August 9, Y
2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
[[Page 14135]]
Preliminary Determination: The proposed Aquifer Pumped Hydro
Project will not alter the primary purpose of the conduit, which is for
agricultural and municipal use. Therefore, based upon the above
criteria, Commission staff preliminarily determines that the operation
of the project described above satisfies the requirements for a
qualifying conduit hydropower facility, which is not required to be
licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice. Deadline for filing motions
to intervene is 30 days from the issuance date of this notice. Anyone
may submit comments or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must be received on or before the
specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS,'' ``COMMENTS CONTESTING
QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY,'' or ``MOTION TO
INTERVENE,'' as applicable; (2) state in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) state the name, address, and telephone number of the
person filing; and (4) otherwise comply with the requirements of
sections 385.2001 through 385.2005 of the Commission's regulations.\1\
All comments contesting Commission staff's preliminary determination
that the facility meets the qualifying criteria must set forth their
evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2024).
---------------------------------------------------------------------------
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
community organizations, Tribal members and others, access publicly
available information and navigate Commission processes. For public
inquiries and assistance with making filings such as comments or
motions to intervene, the public is encouraged to contact OPP at (202)
502-6595 or <a href="/cdn-cgi/l/email-protection#26697676664043544508414950"><span class="__cf_email__" data-cfemail="49061919092f2c3b2a672e263f">[email protected]</span></a>.
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at <a href="/cdn-cgi/l/email-protection#f6b0b3a4b5b9989a9f9893a5838686998482b690938495d8919980"><span class="__cf_email__" data-cfemail="d69093849599b8babfb8b385a3a6a6b9a4a296b0b3a4b5f8b1b9a0">[email protected]</span></a>, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, MD 20852. A copy of all other filings
in reference to this application must be accompanied by proof of
service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
<a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number
(i.e., CD25-3) in the docket number field to access the document. You
may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. For assistance,
call toll-free 1-866-208-3676 or email <a href="/cdn-cgi/l/email-protection#094f4c5b4a46676560676c5a7c7979667b7d496f6c7b6a276e667f"><span class="__cf_email__" data-cfemail="c98f8c9b8a86a7a5a0a7ac9abcb9b9a6bbbd89afacbbaae7aea6bf">[email protected]</span></a>. For
TTY, call (202) 502-8659.
Dated: March 21, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-05310 Filed 3-27-25; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on March 28, 2025.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.