Notice2025-04966

Marlow Hydro LLC; Notice Soliciting Scoping Comments

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
March 25, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 56 (Tuesday, March 25, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 56 (Tuesday, March 25, 2025)]
[Notices]
[Pages 13595-13596]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-04966]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. P-15331-001]


Marlow Hydro LLC; Notice Soliciting Scoping Comments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.

    a. Type of Application: Original Minor License.
    b. Project No.: P-15331-001.
    c. Date filed: July 31, 2024.
    d. Applicant: Marlow Hydro, LLC (Marlow Hydro).
    e. Name of Project: Nash Mill Dam Hydroelectric Project.
    f. Location: On the Ashuelot River, in town of Marlow, Cheshire 
County, New Hampshire.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Anthony B. Rosario, Marlow Hydro, 139 
Henniker St., Hillsborough, NH 03244; Phone at (603) 494-1854; or email 
at <a href="/cdn-cgi/l/email-protection#4531682c2028053121366b2b2031"><span class="__cf_email__" data-cfemail="daaef7b3bfb79aaebea9f4b4bfae">[email&#160;protected]</span></a>.
    i. FERC Contact: Prabha Madduri at 202-502-8017, or 
<a href="/cdn-cgi/l/email-protection#4c3c3e2d2e242d3e2d22262d222562212d2828393e250c2a293e2f622b233a"><span class="__cf_email__" data-cfemail="6111130003090013000f0b000f084f0c00050514130821070413024f060e17">[email&#160;protected]</span></a>.
    j. Deadline for filing scoping comments: April 17, 2025.
    The Commission strongly encourages electronic filing. Please file 
scoping comments using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For 
assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#a1e7e4f3e2eecfcdc8cfc4f2d4d1d1ced3d5e1c7c4d3c28fc6ced7"><span class="__cf_email__" data-cfemail="de989b8c9d91b0b2b7b0bb8dabaeaeb1acaa9eb8bbacbdf0b9b1a8">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). Submissions sent via the U.S. Postal Service must be 
addressed to: Debbie Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, MD 20852. The first page of any filing 
should include the project name and docket number on the first page: 
Nash Mill Dam Hydroelectric Project (P-15331-001).
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application is not ready for environmental analysis at this 
time.
    l. The proposed Nash Mill Project consists of the following 
existing facilities: (1) a 57-foot-long, 9-foot-high, concrete gravity 
dam topped with 3-foot-high collapsible wooden flashboards with a crest 
elevation of 1,133.41 feet North American Vertical Datum 1988 (NAVD 88) 
at the top of the flashboards; (2) a 2-acre impoundment; (3) an intake 
structure on the north side of the dam equipped with a 10-foot-high by 
10-foot-wide trash rack with 1-inch clear bar spacing; (4) a 4-foot-
diameter, 1,525-foot-long, round steel penstock that trifurcates into 
two 2-foot-diameter penstocks and one 4-foot-diameter pipe; (5) a 31-
foot-long by 18-foot-wide powerhouse that contains two vertical-shaft, 
fixed propeller turbine-generator units and one horizontal-shaft 
turbine-generator unit for a total installed capacity of 225 kilowatts; 
(6) a 600-foot-long tailrace; (7) a 1,800-foot-long bypassed reach; (8) 
a 0.48 kilovolt (kV), 75 kilo-volt-ampere transformer; (9) a 1,830-
foot-long, 12.5-kV transmission line; and (10) appurtenant facilities.
    Marlow Hydro currently operates the project in a run-of-river mode. 
The current license requires Marlow Hydro to release a continuous 
minimum flow of 23 cubic feet per second (cfs) from the project as 
measured downstream of the powerhouse, with a continuous flow of 5.2 
cfs over the dam. From 2016 to 2020, average annual generation of the 
Nash Mill Project was 552 megawatt-hours.

[[Page 13596]]

    Marlow Hydro proposes to continue operating the project in a run-
of-river mode and would increase the bypass flow from 5.2 cfs to 14.5 
cfs.
    m. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to address the document. For assistance, contact FERC Online 
Support. A copy is available for inspection and reproduction at the 
address in Item H above.
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#df908f8f9fb9baadbcf1b8b0a9"><span class="__cf_email__" data-cfemail="420d121202242730216c252d34">[email&#160;protected]</span></a>.
    o. Scoping Process: Pursuant to the National Environmental Policy 
Act (NEPA), Commission staff intends to prepare either an environmental 
assessment (EA) or an environmental impact statement (EIS) 
(collectively referred to as the ``NEPA document'') that describes and 
evaluates the probable effects, including an assessment of the site-
specific and cumulative effects, if any, of the proposed action and 
alternatives. The Commission's scoping process will help determine the 
required level of analysis and satisfy the NEPA scoping requirements, 
irrespective of whether the Commission issues an EA or an EIS. At this 
time, we do not anticipate holding an on-site scoping meeting. Instead, 
we are soliciting written comments and suggestions on the preliminary 
list of issues and alternatives to be addressed in the NEPA document, 
as described in scoping document 1 (SD1), issued March 18, 2025. Copies 
of the SD1 outlining the subject areas to be addressed in the NEPA 
document were distributed to the parties on the Commission's mailing 
list and the applicant's distribution list. Copies of the SD1 may be 
viewed on the web at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document (see item m above).

    Dated: March 18, 2025.
Carlos D. Clay,
Deputy Secretary.
[FR Doc. 2025-04966 Filed 3-24-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on March 25, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.