Notice2025-03426

Low Head Hydro M 13 LLC.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
March 4, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 41 (Tuesday, March 4, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 41 (Tuesday, March 4, 2025)]
[Notices]
[Pages 11160-11161]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-03426]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15395-000]


Low Head Hydro M 13 LLC.; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On February 10, 2025, Low Head Hydro M 13, LLC. filed an 
application

[[Page 11161]]

for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act, proposing to study the feasibility of a hydropower project 
proposed to be located at the U.S. Army Corps of Engineers' (Corps) 
Mississippi River Lock and Dam 13 in Clinton County, IA, and Whiteside 
County, IL. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed Mississippi River Lock and Dam 13 Hydroelectric 
Project would consist of the following: (1) a proposed 300-foot by 200-
foot masonry powerhouse located in alignment with the existing Corps' 
dam, containing three proposed Kaplan bulb or Kaplan pit turbines with 
a total capacity of 19.05 megawatts; (2) a proposed intake channel of 
unlined earthen excavation approximately 500 feet long and 200 feet 
wide, located upstream of the turbine bays and including a 200-foot-
long guide wall along the western side of the channel; (3) a proposed 
850-foot-long and 500-foot-wide tailrace area of unlined earthen 
excavation, including a 1,850-foot-long guide wall along the western 
side of the channel and 520-foot-long guide wall along the eastern side 
of the channel; (4) a proposed 85-foot-long by 60-foot-wide low profile 
project substation located downstream from the powerhouse containing a 
single pad mounted three-phase step-up transformer with a rating 
between 15 to 25 megawatt-ampere and ancillary equipment; (5) a 
proposed 4,700-foot-long access road adjacent; (6) an existing dam 
bridge improved and extended to provide access to the powerhouse along 
with a proposed public park and parking area adjacent to the new access 
road; and (7) a proposed 3,400-foot-long, 13.9 to 69-kilovolt (kv) 
underground transmission line to the project substation and a proposed 
4.6 mile, 69-kv transmission line from the substation to the existing 
161-kv ITC Midwest Beaver Island substation. The proposed project would 
have an estimated annual generation of 94,500 megawatt-hours.
    Applicant Contact: Allen W. Skelly, Low Head Hydro M 13, LLC., 127 
Longwood Blvd., Mount Orab, Ohio 45154; phone: (937) 802-8866.
    FERC Contact: Shivani Khetani; phone: (212) 273-5917, or by email 
at <a href="/cdn-cgi/l/email-protection#0d7e65647b6c636423666568796c63644d6b687f6e236a627b"><span class="__cf_email__" data-cfemail="26554e4f5047484f084d4e435247484f664043544508414950">[email&#160;protected]</span></a>.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as interventions, 
comments, or requests for rehearing, the public is encouraged to 
contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#78372828381e1d0a1b561f170e"><span class="__cf_email__" data-cfemail="256a757565434057460b424a53">[email&#160;protected]</span></a>.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/eFiling.aspx">https://ferconline.ferc.gov/eFiling.aspx</a>. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must 
include your name and contact information at the end of your comments. 
For assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#a2e4e7f0e1edcccecbccc7f1d7d2d2cdd0d6e2c4c7d0c18cc5cdd4"><span class="__cf_email__" data-cfemail="33757661707c5d5f5a5d56604643435c414773555641501d545c45">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Debbie-Anne A. Reese, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852. The first page of any filing should include 
docket number P-15395-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at <a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>. 
Enter the docket number (P-15395) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: February 25, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-03426 Filed 3-3-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on March 4, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.