Notice2025-03190

Hydropower Highway LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
February 27, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 38 (Thursday, February 27, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 38 (Thursday, February 27, 2025)]
[Notices]
[Page 10822]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-03190]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15146-000]


Hydropower Highway LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On May 13, 2021, Hydropower Highway LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the proposed Camp Pendleton 
Pumped Storage Hydro Project (Camp Pendleton Project), a hydropower 
project proposed to be located on the coast of the Pacific Ocean, 
partially within Marine Corps Base Camp Pendleton, in San Diego County, 
California. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following new facilities: 
(1) an 850-foot-high lined earthen dam with a crest elevation of 
approximately 800 feet above mean sea level (msl); (2) a 515-acre upper 
reservoir having a total storage capacity of approximately 12,763 acre-
feet at a normal maximum operating elevation of 750 feet msl; (3) up to 
ten 14,300-foot-long, steel-lined underground penstocks between the 
upper reservoir and the powerhouse; (4) a powerhouse containing 10 
advanced ternary pumped storage single runner turbine-generator units 
rated for 520 megawatts; (5) a 2,000-foot-long tailrace connecting the 
powerhouse to the Pacific Ocean; (6) a transmission line, for which the 
point of interconnection with the grid would be determined under the 
permit; and (7) appurtenant facilities. The lower reservoir for the 
proposed project would be the Pacific Ocean. The estimated annual 
generation of the Camp Pendleton Project would be 1,926,470 megawatt-
hours.
    Applicant Contact: Adam Rousselle Sr., 2113 Middle Street, Suite 
201, Sullivans Island, South Carolina 29482; Phone: 267-254-6107.
    FERC Contact: Everard Baker at 202-502-8554 or 
<a href="/cdn-cgi/l/email-protection#e782918295869583c985868c8295a781829584c9808891"><span class="__cf_email__" data-cfemail="b6d3c0d3c4d7c4d298d4d7ddd3c4f6d0d3c4d598d1d9c0">[email&#160;protected]</span></a>.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as interventions, 
comments, or requests for rehearing, the public is encouraged to 
contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#054a555545636077662b626a73"><span class="__cf_email__" data-cfemail="efa0bfbfaf898a9d8cc1888099">[email&#160;protected]</span></a>.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/eFiling.aspx">https://ferconline.ferc.gov/eFiling.aspx</a>. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must 
include your name and contact information at the end of your comments. 
For assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#5c1a190e1f1332303532390f292c2c332e281c3a392e3f723b332a"><span class="__cf_email__" data-cfemail="793f3c2b3a36171510171c2a0c0909160b0d391f1c0b1a571e160f">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Debbie-Anne A. Reese, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852. The first page of any filing should include 
docket number P-15146-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at <a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>. 
Enter the docket number (P-15146) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: February 21, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-03190 Filed 2-26-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on February 27, 2025.