Notice2025-02518

Ohio Power and Light, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
February 12, 2025

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 90 Issue 28 (Wednesday, February 12, 2025)</title>
</head>
<body><pre>
[Federal Register Volume 90, Number 28 (Wednesday, February 12, 2025)]
[Notices]
[Pages 9425-9426]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2025-02518]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15094-002]


Ohio Power and Light, LLC; Notice of Application Tendered for 
Filing With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major Original License.
    b. Project No.: 15094-002.
    c. Date filed: January 23, 2024.
    d. Applicant: Ohio Power and Light, LLC.
    e. Name of Project: Robert C. Byrd Locks and Dam Hydroelectric 
Project (RC Byrd Project or project).
    f. Location: On the Ohio River in Mason County, West Virginia, at 
the U.S. Army Corps of Engineers' (Corps) Robert C. Byrd Locks and Dam. 
The project would occupy about 16 acres of Federal land managed by the 
Corps.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contacts: Mr. Jeremy King, P.E., Chief Executive 
Officer, Current Hydro LLC (agent for the applicant, Ohio Power and 
Light, LLC), 3120 Southwest Freeway, Suite 101, PMB 50808, Houston, TX 
77098, Telephone: (706) 835-8516, Email: <a href="/cdn-cgi/l/email-protection#f49e918691998db497818686919a809c8d90869bda979b99"><span class="__cf_email__" data-cfemail="016b6473646c784162747373646f75697865736e2f626e6c">[email&#160;protected]</span></a>; and 
Mr. Norman Bishop, P.E., Chief Executive Engineer, Current Hydro LLC, 
3120 Southwest Freeway, Suite 101, PMB 50808, Houston, TX 77098, 
Telephone: (303) 475-0608.
    i. FERC Contact: Andy Bernick at (202) 502-8660, or 
<a href="/cdn-cgi/l/email-protection#7b1a151f091e0c55191e09151218103b1d1e0918551c140d"><span class="__cf_email__" data-cfemail="dfbeb1bbadbaa8f1bdbaadb1b6bcb49fb9baadbcf1b8b0a9">[email&#160;protected]</span></a>.
    j. Cooperating Agencies: Federal, State, local, and Tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: March 24, 2025.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. For assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#c5838097868aaba9acaba096b0b5b5aab7b185a3a0b7a6eba2aab3"><span class="__cf_email__" data-cfemail="e0a6a5b2a3af8e8c898e85b39590908f9294a086859283ce878f96">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Debbie-Anne A. Reese, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852. All filings must clearly identify the 
project name and docket number on the first

[[Page 9426]]

page: Robert C. Byrd Locks and Dam Hydroelectric Project (P-15094-002).
    m. The application is not ready for environmental analysis at this 
time.
    n. The proposed RC Byrd Project would utilize the existing Corps' 
Robert C. Byrd Locks and Dam and would consist of the following new 
facilities: (1) two 142.5-foot-long, 110-foot-wide powerhouses each 
containing three 4.75-kilowatt turbine-generator units to be 
constructed within two decommissioned locks on the east side of the 
Corps' Robert C. Byrd Locks and Dam; (2) two intake channels; (3) two 
tailrace channels; (4) a 250-foot-long underground conduit carrying 
generator leads from the powerhouses to a step-up transformer contained 
in a substation; (5) a 69-kilovolt, 2.5-mile-long aboveground 
transmission line to the Apple Grove Substation, where project power 
would connect with the electrical grid; and (6) appurtenant facilities.
    The proposed RC Byrd Project would operate in a run-of-release 
mode, whereby outflow from the project would approximate inflow made 
available for generation by the Corps. The RC Byrd Project would be 
projected to have an annual energy generation of about 165,169 
megawatt-hours.
    o. A copy of the application can be viewed on the Commission's 
website at <a href="https://www.ferc.gov">https://www.ferc.gov</a>, using the ``eLibrary'' link. Enter the 
docket number, excluding the last three digits in the docket number 
field, to access the document (P-15094). For assistance, contact FERC 
at <a href="/cdn-cgi/l/email-protection#80c6c5d2c3cfeeece9eee5d3f5f0f0eff2f4c0e6e5f2e3aee7eff6"><span class="__cf_email__" data-cfemail="d2949780919dbcbebbbcb781a7a2a2bda0a692b4b7a0b1fcb5bda4">[email&#160;protected]</span></a>, or call toll-free, (866) 208-3676 or 
(202) 502-8659 (TTY).
    You may also register online at <a href="https://www.ferc.gov/docs-filing/esubscription.asp">https://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members, and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as interventions, 
comments, or requests for rehearing, the public is encouraged to 
contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#206f707060464552430e474f56"><span class="__cf_email__" data-cfemail="6b243b3b2b0d0e1908450c041d">[email&#160;protected]</span></a>.
    p. Procedural Schedule: The application will be processed according 
to the following preliminary schedule. Revisions to the schedule will 
be made as appropriate.

------------------------------------------------------------------------
                Milestone                           Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary)..  March 2025.
Request Additional Information..........  March 2025.
Issue Acceptance Letter.................  July 2025.
Issue Scoping Document 1 for comments...  August 2025.
Issue Scoping Document 2 (if necessary).  October 2025.
Issue Notice of Ready for Environmental   October 2025.
 Analysis.
------------------------------------------------------------------------


    Dated: February 6, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-02518 Filed 2-11-25; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on February 12, 2025.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.