Notice2024-30277
Pacific Gas and Electric Company; Notice Soliciting Scoping Comments
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
December 19, 2024
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 89 Issue 244 (Thursday, December 19, 2024)</title>
</head>
<body><pre>
[Federal Register Volume 89, Number 244 (Thursday, December 19, 2024)]
[Notices]
[Pages 103818-103819]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2024-30277]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 175-032]
Pacific Gas and Electric Company; Notice Soliciting Scoping
Comments
Take notice that the following application has been filed with the
Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-175-032.
c. Date Filed: April 18, 2024.
d. Applicant: Pacific Gas and Electric Company (PG&E).
e. Name of Project: Balch Hydroelectric Project (Balch Project or
project).
f. Location: The existing project is located about 45 miles
northeast of the city of Fresno, on the North Fork Kings River, in
Fresno and Madera Counties, California (Figure 1). The project
currently occupies 491.5 acres of Federal land administered by the U.S.
Forest Service (Forest Service).
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Dave Gabbard, Vice President Power
Generation, Pacific Gas and Electric Company, 300 Lakeside Drive,
Oakland, CA 94612; telephone at (650) 207-9705; email at
<a href="/cdn-cgi/l/email-protection#753114031c115b12141717140711350512105b161a18"><span class="__cf_email__" data-cfemail="c084a1b6a9a4eea7a1a2a2a1b2a480b0a7a5eea3afad">[email protected]</span></a>.
i. FERC Contact: Benjamin Mann, (202) 502-8462, or email at
<a href="/cdn-cgi/l/email-protection#cc8ea9a2a6ada1a5a2e281ada2a28caaa9beafe2aba3ba"><span class="__cf_email__" data-cfemail="5517303b3f34383c3b7b18343b3b15333027367b323a23">[email protected]</span></a>.
j. Deadline for filing scoping comments: January 12, 2025.\1\
---------------------------------------------------------------------------
\1\ If the due date falls on a weekend or holiday, the due date
is the following business day.
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For
assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#43050611000c2d2f2a2d26103633332c313703252631206d242c35"><span class="__cf_email__" data-cfemail="eaacafb8a9a5848683848fb99f9a9a85989eaa8c8f9889c48d859c">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings must clearly identify the
project name and docket number on the first page: Balch Hydroelectric
Project (P-175-032).
k. This application is not ready for environmental analysis at this
time.
l. Project Description: The existing Balch Hydroelectric Project
(project) includes the following facilities: (1) a 135-foot-high, 396-
foot-long diversion dam with a crest elevation of 4,098 feet that
includes a 364-foot-long spillway and is located on the North Fork
Kings River 9.9 miles upstream of the confluence with Kings River; (2)
the 35-acre Black Rock Reservoir with a usable storage capacity of
1,260 acre-feet at a normal water surface elevation of 4,097 feet; (3)
an 11-foot-high, concrete tunnel intake; (4) a water conveyance system
consisting of: (a) a 19,336-foot-long tunnel with a maximum hydraulic
capacity of 760 cubic feet per second (cfs) that includes the 308-foot-
long Black Rock Adit, the 350-foot-long Weir Creek Adit, an unlined
surge chamber, and two sluice channels; (5) a 4,905.6-foot-long
penstock leading to the Balch No. 1 Powerhouse and a 4,933.3-foot-long
penstock leading to the Balch No. 2 Powerhouse; (6) the 65.5-foot-long,
80.5-foot-wide Balch No. 1 Powerhouse housing one turbine-generator
unit with an authorized installed capacity of 31.02 megawatts (MW) and
a maximum hydraulic capacity of 213 cfs; (7) the 149-foot-long, 84-
foot-wide Balch No. 2 Powerhouse housing two turbine-generator units
with a total authorized installed capacity of 105 MW and a maximum
hydraulic capacity of 315 cfs; (8) a 165-foot-high, 238-foot-long
afterbay dam with a crest elevation of 1,704 feet that includes a 238-
foot-long spillway; (9) a 7-acre afterbay with a usable storage
capacity of 135 acre-feet; (10) project roads and trails; (11)
recreation facilities; (12) a 22-mile-long, 115-kilovolt (kV)
transmission line connecting the project with the grid at Piedra
Junction; (13) the 76-acre Balch Camp, which is the project operating
headquarters and includes personnel housing; (14) a 6.2-mile-line, 12-
kV distribution line connecting Balch Camp with the project's diversion
dam; and (15) appurtenant facilities.
The Balch Project is located downstream of PG&E's Haas-Kings River
Hydroelectric Project No. 1988 and Helms Pumped Storage Project No.
2735, which use the same reservoirs (Courtright Lake and Lake Wishon)
for operation. The project is operated as a peaking facility to
generate power that is released from upstream storage to meet power
demand and for irrigation
[[Page 103819]]
purposes. Project operation is coordinated with Project No. 1988, whose
releases from Lake Wishon largely control inflow to Black Rock
Reservoir; however, spill fluctuations at the project are possible at
times when inflow exceeds powerhouse capacity and during powerhouse
outages.
The current license requires PG&E to maintain the following
continuous minimum flows in the North Kings River: (1) during normal
water years: (a) from June 1 through November 31, 5 cfs from Black Rock
Reservoir, 15 cfs from Balch Afterbay, and 30 cfs of total river flow;
and (b) from December 1 through May 31, 2.5 cfs from Black Rock
Reservoir, 10 cfs from Balch Afterbay, and 30 cfs of total river flow;
(2) during dry water years, as defined by the California Department of
Water Resources, year-round flows of 2.5 cfs from Black Rock Reservoir,
10 cfs from Balch Afterbay, and 20 cfs of total river flow.
PG&E proposes to continue operating the project in a manner that is
consistent with current operation, with the exception of the following
new proposed measures: (1) minimum flows and water year types, (2) a
recreation plan, (3) a biological resources management plan, (4) a
historic properties management plan, (5) low-level operations, (6)
flood period operations, (7) a hazardous substance plan, (8) a gaging
plan, (9) visual resources management, (10) a fire management and
response plan, and (11) a transportation system management plan.
m. A copy of the application can be viewed on the Commission's
website at <a href="https://www.ferc.gov">https://www.ferc.gov</a> using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-175). For assistance, please contact
FERC Online Support (see item j above).
You may also register at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, please
contact FERC Online Support (see item j above).
n. The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#8bc4dbdbcbedeef9e8a5ece4fd"><span class="__cf_email__" data-cfemail="7a352a2a3a1c1f0819541d150c">[email protected]</span></a>.
o. Scoping Process: Pursuant to the National Environmental Policy
Act (NEPA), Commission staff intends to prepare either an environmental
assessment (EA) or an environmental impact statement (EIS)
(collectively referred to as the ``NEPA document'') that describes and
evaluates the probable effects, including an assessment of the site-
specific and cumulative effects, if any, of the proposed action and
alternatives. The Commission's scoping process will help determine the
required level of analysis and satisfy the NEPA scoping requirements,
irrespective of whether the Commission issues an EA or an EIS. At this
time, we do not anticipate holding an on-site scoping meeting. Instead,
we are soliciting written comments and suggestions on the preliminary
list of issues and alternatives to be addressed in the NEPA document,
as described in scoping document 1 (SD1), issued December 13, 2024.
Copies of SD1, which outlines the subject areas to be addressed in
the NEPA document, were distributed to the parties on the Commission's
mailing list and the applicant's distribution list. Copies of SD1 may
be viewed on the web at <a href="https://www.ferc.gov">https://www.ferc.gov</a> using the ``eLibrary''
link. Follow the directions for accessing information in paragraph m.
Dated: December 13, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-30277 Filed 12-18-24; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on December 19, 2024.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.