Notice of Intent To Prepare an Environmental Impact Statement for the North Cache Valley Watershed Plan Project in Franklin County, Idaho and Cache County, Utah
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The Natural Resources Conservation Service (NRCS) Idaho State Office announces its intent to prepare an EIS for the North Cache Valley Project Watershed Plan (Watershed Plan), located within the North Cache Valley Watershed in Lewiston, Utah. The proposed Watershed Plan will examine alternative solutions to provide improved agricultural water management and to enhance recreational facilities. The project is being planned for areas within the watershed located in Franklin County, Idaho and Cache County, Utah. The project area is comprised of the irrigation service area within the watershed which fits into the watershed plan's primary purpose of Agricultural Water Management. The Project Area includes developed and undeveloped agricultural land and small farm communities. The primary purpose for this Watershed Plan is to provide more reliable management of agricultural water in the Project Area and to enhance existing recreational opportunities in the watershed. This Watershed Plan is needed to improve impaired drainage infrastructure; provide an efficient and reliable irrigation water supply; improve water management and measurement; reduce seepage loss in existing conveyance systems; and to expand the limited recreational opportunities in the watershed. NRCS is requesting comments to identify significant issues, potential alternatives, information, and analyses relevant to the proposed action from all interested individuals, Federal and State agencies, and Tribes.
Full Text
<html>
<head>
<title>Federal Register, Volume 89 Issue 226 (Friday, November 22, 2024)</title>
</head>
<body><pre>
[Federal Register Volume 89, Number 226 (Friday, November 22, 2024)]
[Notices]
[Pages 92618-92620]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2024-27417]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Natural Resources Conservation Service
[Docket No. NRCS-2024-0019]
Notice of Intent To Prepare an Environmental Impact Statement for
the North Cache Valley Watershed Plan Project in Franklin County, Idaho
and Cache County, Utah
AGENCY: Natural Resources Conservation Service, USDA.
ACTION: Notice of intent (NOI) to prepare an environmental impact
statement (EIS).
-----------------------------------------------------------------------
SUMMARY: The Natural Resources Conservation Service (NRCS) Idaho State
Office announces its intent to prepare an EIS for the North Cache
Valley Project Watershed Plan (Watershed Plan), located within the
North Cache Valley Watershed in Lewiston, Utah. The proposed Watershed
Plan will examine alternative solutions to provide improved
agricultural water management and to enhance recreational facilities.
The project is being planned for areas within the watershed located in
Franklin County, Idaho and Cache County, Utah. The project area is
comprised of the irrigation service area within the watershed which
fits into the watershed plan's primary purpose of Agricultural Water
Management. The Project Area includes developed and undeveloped
agricultural land and small farm communities. The primary purpose for
this Watershed Plan is to provide more reliable management of
agricultural water in the Project Area and to enhance existing
recreational opportunities in the watershed. This Watershed Plan is
needed to improve impaired drainage infrastructure; provide an
efficient and reliable irrigation water supply; improve water
management and measurement; reduce seepage loss in existing conveyance
systems; and to expand the limited recreational opportunities in the
watershed. NRCS is requesting comments to identify significant issues,
potential alternatives, information, and analyses relevant to the
proposed action from all interested individuals, Federal and State
agencies, and Tribes.
DATES: We will consider comments that we receive by December 23, 2024.
We will consider comments received after close of the comment period to
the extent possible.
ADDRESSES: We invite you to submit comments in response to this notice.
You may submit your comments through one of the methods below:
<bullet> Federal eRulemaking Portal: Go to <a href="http://www.regulations.gov">http://www.regulations.gov</a> and search for docket ID NRCS-2024-0019. Follow the
online instructions for submitting comments; or
<bullet> Mail or Hand Delivery: Dan Murdock, Water Resources
Planning Specialist, USDA, NRCS, Idaho State Office, 9173 W Barnes
Drive, Suite C, Boise, Idaho 83709. In your comments, specify the
docket ID NRCS-2024-0019.
All comments received will be posted without change and made
publicly available on <a href="http://www.regulations.gov">www.regulations.gov</a>.
FOR FURTHER INFORMATION CONTACT: Dan Murdock, telephone: (208) 685-
6990; email: <a href="/cdn-cgi/l/email-protection#bdd9dcd3d4d8d193d0c8cfd9d2ded6fdc8ced9dc93dad2cb"><span class="__cf_email__" data-cfemail="d3b7b2bdbab6bffdbea6a1b7bcb0b893a6a0b7b2fdb4bca5">[email protected]</span></a>.
Individuals who require alternative means for communication should
contact the U.S. Department of Agriculture (USDA) Target Center at
(202) 720-2600 (voice and text telephone (TTY)) or dial 711 for
Telecommunications Relay service (both voice and text telephone users
can initiate this call from any telephone).
SUPPLEMENTARY INFORMATION:
Purpose and Need
The primary purposes for the Watershed Plan is to improve
agricultural water management and recreation development in the Project
Area. Watershed planning is authorized under the Watershed Protection
and Flood Prevention Act of 1954 (Pub. L. 83-566), as amended, and the
Flood Control Act of 1944 (Pub. L. 78-534).
Franklin County, Idaho is the Sponsoring Local Organization for
this project with Cub River Irrigation Company (CRIC) and Cache County,
Utah as co-sponsors. The project is essential to improve agricultural
water management and enhance recreational development in the watershed.
This action is needed to address drainage, water management, and
recreation issues for the Project Area. This action is needed to better
manage and remove drainage and flood flows in a timely manner; provide
an efficient, reliable irrigation water supply; construct a sustainable
distribution system; increase pumping efficiencies; and conserve water.
Water conservation would be accomplished by reducing open channel
inefficiencies, seepage losses, and evaporation.
Estimated Federal funds required for the construction of the
proposed action may exceed $25 million and the proposed action will,
therefore, require congressional approval per the 2018 Agriculture
Appropriations Act amended funding threshold. In accordance with the
regulation in 7 CFR 650.7(a)(2), an EIS is required for projects
requiring congressional approval.
Preliminary Proposed Action and Alternatives, Including No Action
The EIS objective is to formulate and evaluate alternatives for the
purposes of agricultural water management and public recreation in the
Franklin County, Idaho Project Area. The EIS is expected to evaluate
three alternatives:
[[Page 92619]]
two action alternatives and one no action alternative.
The alternatives that may be considered for detailed analysis
include:
<bullet> Alternative 1--No Action Alternative: Taking no action
would consist of activities conducted if no Federal action or funding
were provided. If the No Action Alternative is selected, water flows
would pass through the same historic channels, waterways, and drainage
crossings as they currently do with issues continuing, dependent on the
nature, timing, and severity of the events. Agricultural fields would
continue to flood during rain-on-snow events, including the extensive
saturation and killing of crops. Irrigation water would continue to be
lost through seepage and evaporation from the earthen canals and
existing irrigation methods would remain unchanged or continue to
change as farmers choose to install pumps and pressurize their own
irrigation systems. Additionally, the soils saturated seasonally by the
canal seepage would continue to be saturated and soured and unusable
for agricultural production. No new stations would be constructed to
consolidate the system. There would be no recreational access points
constructed on the Bear River. No Federal action or funding would be
associated with the No Action Alternative.
<bullet> Alternative 2--Proposed Action--Bear River Two Pump
Station. This alternative would include various actions to provide
agricultural water management and public recreation benefits to the
area. The Proposed Action would install 19,000 feet of conduit and
place five pumps for drainage management. In many areas, the existing
canal and ditches will be left open and used for flood control
purposes, as they historically have been, including improvements to the
Choll's Spill to allow the water flows to pass to the Cub River with
minimal manual regulation and reduced risks. The existing canal along
800 West below 800 South in Lewiston, Utah, would also remain open and
convey the water flows. Irrigation pipelines will be dual purposed in
locations where it would not be cost effective or feasible to build
conduits and will allow water to be pumped out using a mobile pump with
a quick connection to the irrigation system to back pressure the system
and allow discharge to the system drains used to winterize the
irrigation system. This alternative also includes measures to construct
two new pump stations, relocate one pump station, remove four pump
stations, and enclose 19.5 miles of open canal for agricultural water
management purposes. This alternative would pull Bear River water from
two pump station (a north and a south site), preventing the need to
enlarge the existing electrical grid. Finally, this alternative would
construct a public recreational access site to the Bear River adjacent
to 2000 South in Lewiston, Utah, along the banks of the Bear River.
This site would consist of public parking and a boat ramp for non-
motorized watercraft.
<bullet> Alternative 3--Proposed Action--Bear River One Pump
Station. The Proposed Action would include all the same project
measures as Alternative 2 with the following difference: under this
alternative, all the Bear River water used by CRIC would be pulled from
a single pump station rather than from two, requiring larger pipeline
diameters and bigger pumps. This alternative would also require an
enlargement of the electrical grid expected to cost around $1 million
dollars.
Summary of Expected Impacts
As mentioned above, the estimated Federal contribution to
construction cost will exceed $25 million.
The EIS will be prepared as required by section 102(2)(C) of the
National Environmental Policy Act of 1969 (NEPA); the Council on
Environmental Quality Regulations (40 CFR parts 1500-1508); and NRCS
regulations that implement NEPA in 7 CFR part 650.
Resource concerns for scoping were identified and categorized as
relevant or not relevant to the proposed action. Franklin County, Idaho
and NRCS evaluated the current conditions for resources in the Project
Area including soil, water, air, plants, animals, and humans along with
relevant resource concerns for each proposed solution. Environmental
resources in the Project Area consist of the natural and human-made
environment. Resource concerns to be identified and addressed in the
Watershed Plan-EIS include: soils; prime and unique farmland; upland
erosion; surface and groundwater quality and quantity; wetlands and
Waters of the United States; floodplains; air quality; climate change;
endangered and threatened plant and animal species; riparian areas;
invasive species; fish and wildlife; migratory birds; cultural and
historic resources; environmental justice; public health and safety;
and transportation, among others.
Anticipated Permits and Authorizations
The following permits and authorizations are anticipated to be
required:
<bullet> Federal Emergency Management Agency, Floodplain
Development Permit. Implementation of the proposed action would require
coordination with the local floodplain administrator and may require a
Floodplain Development Permit to ensure all development and engineering
requirements for construction within the Special Flood Hazard Areas are
implemented.
<bullet> Clean Water Act (CWA) and National Pollutant Discharge
Elimination System (NPDES). The project would require water quality
certification under section 401 of the CWA, permitting under section
402 of the NPDES, and section 404 of the CWA for potential wetland
impacts.
<bullet> Encroachment Permit. The proposed action would require
coordination and permitting with the Idaho Transportation Department
and the Utah Department of Transportation for temporary construction
work within State and Federal roadway rights-of-way.
<bullet> Utah Pollutant Discharge Elimination System (UPDES)
Construction Permit. A construction permit will be required through the
UPDES.
<bullet> Stream Alteration Permit. The proposed action will require
coordination and permits with the Idaho Department of Water Resources
and Utah Division of Water Rights for bank alterations of the Bear
River for the pump stations and recreational access. This permit is
typically done jointly by both Idaho and Utah with the U.S. Army Corps
of Engineers to get State and section 404 of the Clean Water Act
approval and authorization through a single application.
<bullet> National Historic Preservation Act (NHPA) Section 106.
Consultation with Tribal Nations and interested parties would be
conducted as required by the NHPA.
<bullet> Local Encroachment. Consultation and potential
encroachment permits would be required with Franklin County, Idaho;
Lewiston City, Utah; and Cache County, Utah, for all construction work
within the local roadway rights-of-way.
Schedule of Decision-Making Process
A Draft EIS (DEIS) will be prepared and circulated for review and
comment by agencies, Tribes, consulting parties, and the public for 45
days as required by the regulations in 40 CFR 1503.1, 1502.20, 1506.11,
and 1502.17, and 7 CFR 650.13. The DEIS is anticipated to be published
in the Federal Register, approximately 24 months after publication of
this NOI. A Final EIS is anticipated to be published within 3
[[Page 92620]]
months of completion of the public comment period for the DEIS.
NRCS will decide whether to implement one of the action
alternatives as evaluated in the EIS. A Record of Decision will be
completed after the required 30-day waiting period and will be publicly
available. The responsible Federal official and decision maker for NRCS
is the Idaho NRCS State Conservationist. The Responsible Federal
Official (RFO) and decision maker for NRCS is the Idaho State
Conservationist.
Public Scoping Process
A public scoping meeting was held on November 19, 2020. Comments
received, including the names and addresses of those who commented,
were part of the public record. Scoping meeting presentation materials
were available for review and comment for 30 days from November 19,
2020, through December 18, 2020.
Federal, State, Tribal, local agencies and representatives, and the
public were invited to take part in the watershed plan scoping period.
Franklin County, Idaho, and NRCS organized the public scoping meeting
to provide an opportunity to review and evaluate the project
alternatives, express concern, or support, and gain further information
regarding the project. To determine the most viable alternatives for
the EIS, Franklin County, Idaho, used input obtained during public
scoping discussions to focus on relevant resource concerns and issues
and eliminated those that were not relevant from further detailed
study.
NRCS will coordinate the scoping process to correspond with section
106 of the National Historic Preservation Act (NHPA) (54 U.S.C. 306108)
as allowed in 36 CFR 800.2(d)(3) and 800.8.
Identification of Potential Alternatives, Information, and Analyses
NRCS invites agencies, Tribes, consulting parties, and individuals
that have special expertise, legal jurisdiction, or interest in the
North Cache Valley Watershed Plan-EIS to provide written comments
concerning the scope of the analysis and identification of potential
alternatives, information, and analyses relevant to the Proposed
Action.
The information about historic and cultural resources within the
area potentially affected by the proposed project will assist NRCS in
identifying and evaluating impacts to such resources in the context of
both NEPA and NHPA.
NRCS will consult with Native American Tribes on a government-to-
government basis in accordance with the regulations in 36 CFR 800.2 and
800.3, Executive Order 13175, and other policies. Tribal concerns,
including impacts on Indian trust assets and potential impacts to
cultural resources and historic properties, will be given due
consideration.
Authorities
This document is published as specified by the NEPA regulations
regarding publication of an NOI to issue an EIS (40 CFR 1501.9(d)).
Watershed planning is authorized under the Watershed Protection and
Flood Prevention Act of 1954, as amended and the Flood Control Act of
1944.
Federal Assistance Programs
The title and number of the Federal Assistance Program as found in
the Assistance Listing \1\ to which this document applies is 10.904,
Watershed Protection and Flood Prevention.
---------------------------------------------------------------------------
\1\ See <a href="https://sam.gov/content/assistance-listings">https://sam.gov/content/assistance-listings</a>.
---------------------------------------------------------------------------
Executive Order 12372
Executive Order 12372, ``Intergovernmental Review of Federal
Programs,'' requires consultation with State and local officials that
would be directly affected by proposed Federal financial assistance.
The objectives of the Executive order are to foster an
intergovernmental partnership and a strengthened federalism, by relying
on State and local processes for State and local government
coordination and review of proposed Federal financial assistance and
direct Federal development. This project is subject to the provisions
of Executive Order 12372, which requires intergovernmental consultation
with State and local officials.
USDA Non-Discrimination Policy
In accordance with Federal civil rights law and USDA civil rights
regulations and policies, USDA, its agencies, offices, and employees,
and institutions participating in or administering USDA programs are
prohibited from discriminating based on race, color, national origin,
religion, sex, gender identity (including gender expression), sexual
orientation, disability, age, marital status, family or parental
status, income derived from a public assistance program, political
beliefs, or reprisal or retaliation for prior civil rights activity, in
any program or activity conducted or funded by USDA (not all bases
apply to all programs). Remedies and complaint filing deadlines vary by
program or incident.
Individuals who require alternative means of communication for
program information (for example, braille, large print, audiotape,
American Sign Language, etc.) should contact the responsible Agency or
USDA TARGET Center at (202) 720-2600 (voice and telephone) or dial 711
for Telecommunications Relay Service (both voice and text telephone
users can initiate this call from any phone). Additionally, program
information may be made available in languages other than English.
To file a program discrimination complaint, complete the USDA
Program Discrimination Complaint Form, AD-3027, found online at:
<a href="https://www.usda.gov/oascr/how-to-file-a-program-discrimination-complaint">https://www.usda.gov/oascr/how-to-file-a-program-discrimination-complaint</a> and at any USDA office or write a letter addressed to USDA
and provide in the letter all the information requested in the form. To
request a copy of the complaint form, call (866) 632-9992. Submit your
completed form or letter to USDA by: (1) mail to: U.S. Department of
Agriculture, Office of the Assistant Secretary for Civil Rights, 1400
Independence Avenue SW, Washington, DC 20250-9410; (2) Fax: (202) 690-
7442; or (3) email: <a href="/cdn-cgi/l/email-protection#bdcdcfd2dacfdcd093d4d3c9dcd6d8fdc8ced9dc93dad2cb"><span class="__cf_email__" data-cfemail="d7a7a5b8b0a5b6baf9beb9a3b6bcb297a2a4b3b6f9b0b8a1">[email protected]</span></a>.
USDA is an equal opportunity provider, employer, and lender.
Loretta Kassib,
Acting Idaho State Conservationist, Natural Resources Conservation
Service.
[FR Doc. 2024-27417 Filed 11-21-24; 8:45 am]