Notice2024-24806
PE Hydro Generation, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
October 25, 2024
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 89 Issue 207 (Friday, October 25, 2024)</title>
</head>
<body><pre>
[Federal Register Volume 89, Number 207 (Friday, October 25, 2024)]
[Notices]
[Pages 85191-85192]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2024-24806]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2509-051]
PE Hydro Generation, LLC; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2509-051.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation, LLC.
e. Name of Project: Shenandoah Hydroelectric Project (P-2509-051).
f. Location: The project is located on the South Fork of the
Shenandoah River near the Town of Shenandoah in Page and Rockingham,
Counties, Virginia. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory
Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W,
Bethesda, MD 20814; Phone at (804) 382-1764 or email at
<a href="/cdn-cgi/l/email-protection#3d57525944134e5058497d585c5a51585e4f5858564f58135e5250"><span class="__cf_email__" data-cfemail="bcd6d3d8c592cfd1d9c8fcd9dddbd0d9dfced9d9d7ced992dfd3d1">[email protected]</span></a>.
i. FERC Contact: Kristine Sillett at (202) 502-6575; or email at
<a href="/cdn-cgi/l/email-protection#5e352c372d2a37303b702d3732323b2a2a1e383b2c3d70393128"><span class="__cf_email__" data-cfemail="ea819883999e83848fc4998386868f9e9eaa8c8f9889c48d859c">[email protected]</span></a>.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
<a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please
contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#a8eeedfaebe7c6c4c1c6cdfbddd8d8c7dadce8cecddacb86cfc7de"><span class="__cf_email__" data-cfemail="e6a0a3b4a5a9888a8f8883b5939696899492a680839485c8818990">[email protected]</span></a>, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy via U. S. Postal Service to: Debbie-
Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings must clearly identify the
project name and docket number on the first page: Shenandoah Project
(P-2509-051).
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted and is ready for
environmental analysis at this time.
[[Page 85192]]
l. The Shenandoah Project consists of: (1) a 15-foot-high, 495-
foot-long reinforced concrete dam; (2) a 30-acre impoundment with a
storage capacity of 190 acre feet; (3) a 91-foot-long, 38-foot-wide
powerhouse adjacent to the north end of the dam, with four generating
units having a total installed capacity of 862 kW; (4) 180-foot-long,
2.4-kilovolt (kV) project generator lines; (5) a substation containing
a 3-phase, 2.4/34.5-kV transformer where interconnection with the grid
occurs and; (6) other appurtenances.
The project operates in a run-of-river mode with a minimum flow of
44 cubic feet per second. The project had an average annual generation
of 2,037 megawatt-hours between 2011 and 2016.
m. This filing may be viewed on the Commission's website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field, to access
the document. For assistance, contact FERC Online Support.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicants and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicants. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding in accordance with
18 CFR 4.34(b) and 385.2010.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595, or at <a href="/cdn-cgi/l/email-protection#4e011e1e0e282b3c2d60292138"><span class="__cf_email__" data-cfemail="0b445b5b4b6d6e7968256c647d">[email protected]</span></a>.
You may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. The applicant must file no later than 60 days from the issuance
date of this notice: (1) copy of the water quality certification; (2) a
copy of the request for certification, including proof of the date on
which the certifying agency received the request; or (3) evidence of a
waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestones Target date
------------------------------------------------------------------------
Deadline for filing comments, December 17, 2024.
recommendations, terms and
conditions, and prescriptions.
Deadline for filing reply comments January 31, 2025.
------------------------------------------------------------------------
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-24806 Filed 10-24-24; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on October 25, 2024.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.