Notice of Availability of the Record of Decision for Libra Solar in Lyon and Mineral Counties, NV
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The Bureau of Land Management (BLM) announces the availability of the Record of Decision (ROD) for the Final Environmental Impact Statement for the Libra Solar Project located in Lyon and Mineral Counties, Nevada. The ROD was signed on September 10, 2024, which constitutes the decision of the BLM, as approved by the Department of the Interior.
Full Text
<html>
<head>
<title>Federal Register, Volume 89 Issue 179 (Monday, September 16, 2024)</title>
</head>
<body><pre>
[Federal Register Volume 89, Number 179 (Monday, September 16, 2024)]
[Notices]
[Pages 75562-75563]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2024-20948]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[BLM_NV_FRN; MO# 04500179291]
Notice of Availability of the Record of Decision for Libra Solar
in Lyon and Mineral Counties, NV
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) announces the availability
of the Record of Decision (ROD) for the Final Environmental Impact
Statement for the Libra Solar Project located in Lyon and Mineral
Counties, Nevada. The ROD was signed on September 10, 2024, which
constitutes the decision of the BLM, as approved by the Department of
the Interior.
DATES: The ROD was signed on September 10, 2024.
ADDRESSES: The ROD is available online at <a href="https://eplanning.blm.gov/eplanning-ui/project/2022592/510">https://eplanning.blm.gov/eplanning-ui/project/2022592/510</a>. Printed copies of the ROD are
available for the public at the Carson City District Office, 5665
Morgan Mill Road, Carson City, Nevada or can be provided upon request
by Carson City District Public Room at: 775-885-6000.
FOR FURTHER INFORMATION CONTACT: Lisa Ross, Public Affairs Specialist,
telephone (775) 885-6107; address 5665 Morgan Mill Road, Carson City,
NV 89701; email <a href="/cdn-cgi/l/email-protection#284a444577465e774b4b4c477744414a5a49775b4744495a684a4445064f475e"><span class="__cf_email__" data-cfemail="3d5f515062534b625e5e59526251545f4f5c624e52515c4f7d5f5150135a524b">[email protected]</span></a>. Individuals in the
United States who are deaf, deafblind, hard of hearing, or have a
speech disability may dial 711 (TTY, TDD, or TeleBraille) to access
telecommunications relay services for contacting Ms. Ross Individuals
outside the United States should use the relay services offered within
their country to make international calls to the point-of-contact in
the United States.
[[Page 75563]]
SUPPLEMENTARY INFORMATION: The Department of the Interior has approved
the BLM's decision to issue a right-of-way grant for construction,
operation and maintenance (O&M), and decommissioning of a 5,141-acre
solar facility wholly on BLM lands with a 24.1-mile-long gen-tie line
to connect to the existing Fort Churchill substation near the town of
Yerington in Lyon County, Nevada. The Project includes the following
primary components: (1) a 700 megawatt (MW) alternating current (MWac)
solar photovoltaic power generating facility; (2) a 700 MW battery
energy storage system; (3) linear and ancillary facilities, including
access roads, electrical distribution lines, and communication cables;
(4) O&M facilities; and (5) a substation and a 24.1-mile-long 345
kilovolt (kV) or 525 kV gen-tie line into the Fort Churchill
substation, of which 22.9 miles would be on the BLM-managed lands. The
project and planning area is approximately 55 miles southeast of the
Reno metropolitan area, 11 miles southeast of the town of Yerington, 7
miles west of U.S. Route 95, and 8 miles east of State Route 208.
The decision to authorize this energy generation project on public
lands is consistent with the Federal Land Policy and Management Act, as
amended, and the BLM's right-of-way regulations (43 U.S.C. 1761; 43 CFR
part 2800).
Approval of this right-of-way constitutes the final decision of the
Department of the Interior and is not subject to appeal under
Departmental regulations at 43 CFR part 4.
(Authority: 40 CFR 1501.9)
Kimberly D. Dow,
District Manager, Carson City District.
[FR Doc. 2024-20948 Filed 9-13-24; 8:45 am]