Notice2024-19073

Application for Authorization To Export Electric Energy; AlbertaEx L.P., Inc

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
August 26, 2024

Issuing agencies

Energy Department

Abstract

AlbertaEx, L.P. (AlbertaEx or Applicant) has applied for authorization to transmit electric energy from the United States to Canada pursuant to the Federal Power Act.

Full Text

<html>
<head>
<title>Federal Register, Volume 89 Issue 165 (Monday, August 26, 2024)</title>
</head>
<body><pre>
[Federal Register Volume 89, Number 165 (Monday, August 26, 2024)]
[Notices]
[Pages 68420-68421]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2024-19073]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[GDO Docket No. EA-504]


Application for Authorization To Export Electric Energy; 
AlbertaEx L.P., Inc

AGENCY: Grid Deployment Office, Department of Energy.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: AlbertaEx, L.P. (AlbertaEx or Applicant) has applied for 
authorization to transmit electric energy from the United States to 
Canada pursuant to the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before September 25, 2024.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed by electronic mail to 
<a href="/cdn-cgi/l/email-protection#31745d5452454358525845481f7449415e4345427159401f555e541f565e47"><span class="__cf_email__" data-cfemail="7a3f161f190e081319130e03543f020a15080e093a120b541e151f541d150c">[email&#160;protected]</span></a>.

FOR FURTHER INFORMATION CONTACT: Janessa Zucchetto, 240-474-8226 
<a href="/cdn-cgi/l/email-protection#1e5b727b7d6a6c777d776a67305b666e716c6a6d5e766f307a717b30797168"><span class="__cf_email__" data-cfemail="7c3910191f080e151f1508055239040c130e080f3c140d52181319521b130a">[email&#160;protected]</span></a>.

SUPPLEMENTARY INFORMATION: The United States Department of Energy (DOE) 
regulates electricity exports from the United States to foreign 
countries in accordance with section 202(e) of the Federal Power Act 
(FPA) (16 U.S.C. 824a(e)) and regulations thereunder (10 CFR 205.300 et 
seq.). Sections 301(b) and 402(f) of the DOE Organization Act (42 
U.S.C. 7151(b) and 7172(f)) transferred this regulatory authority, 
previously exercised by the now-defunct Federal Power Commission, to 
DOE.
    Section 202(e) of the FPA provides that an entity which seeks to 
export electricity must obtain an order from DOE authorizing that 
export. (16 U.S.C. 824a(e)). On April 10, 2023, the authority to issue 
such orders was delegated to the DOE's Grid Deployment Office (GDO) by 
Delegation Order No. S1-DEL-S3-2023 and Redelegation Order No. S3-DEL-
GD1-2023.
    On October 13, 2023, AlbertaEx filed an application with DOE 
(Application or App.) for authorization to transmit electric energy to 
Canada for a ten-year term. App. at 1. The Applicant filed supplemental 
information on July 22, 2024 to include information regarding the 
issuance of market-based rate authority from the Federal Energy 
Regulatory Commission. Id. at 3.
    According to the Application, AlbertaEx is a power marketer and a 
wholly owned affiliate of BHE Canada Holdings Corporation, which is 
wholly owned by Berkshire Hathaway Energy Corporation. Id. at 2. The 
Applicant states that it is ``a limited partnership organized under the 
laws of Alberta, Canada, with its principal place of business in 
Calgary, Alberta, Canada, and is currently authorized to operate in 
Montana.'' Id.
    Applicant states that it ``does not have a power supply system on 
which its exports of power could have reliability, fuel use or system 
stability impact, nor does it have an obligation to serve any native 
load within a franchised service area.'' Id at 6. Additionally, the 
Applicant represents that it ``does not own or control electric 
generation facilities or transmission facilities.'' Id. AlbertaEx 
further states that it ``will purchase the power it plans to export 
voluntarily from electric utilities, wholesale generators, power 
marketers and other parties and thus such power will be surplus to the 
needs of the selling parties.'' Id. AlbertaEx asserts that its exports 
will not impair or impede the sufficiency of the electric supply in the 
United States or the regional coordination of electric utility planning 
or operation. Id.
    The existing international transmission facilities to be utilized 
by the Applicant have been previously authorized by Presidential 
permits issued pursuant to Executive Order 10485, as amended, and are 
appropriate for open access transmission by third parties. See id. at 
Attachment 2.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the Application at 
<a href="/cdn-cgi/l/email-protection#2e6b424b4d5a5c474d475a57006b565e415c5a5d6e465f004a414b00494158"><span class="__cf_email__" data-cfemail="b4f1d8d1d7c0c6ddd7ddc0cd9af1ccc4dbc6c0c7f4dcc59ad0dbd19ad3dbc2">[email&#160;protected]</span></a>. Protests should be filed in

[[Page 68421]]

accordance with Rule 211 of Federal Energy Regulatory Commission's 
(FERC's) Rules of Practice and Procedure (18 CFR 385.211). Any person 
desiring to become a party to this proceeding should file a motion to 
intervene at <a href="/cdn-cgi/l/email-protection#61240d0402151308020815184f2419110e1315122109104f050e044f060e17"><span class="__cf_email__" data-cfemail="9fdaf3fafcebedf6fcf6ebe6b1dae7eff0edebecdff7eeb1fbf0fab1f8f0e9">[email&#160;protected]</span></a> in accordance with FERC 
Rule 214 (18 CFR 385.214).
    Comments and other filings concerning AlbertaEx's Application 
should be clearly marked with GDO Docket No. EA-504. Additional copies 
are to be provided directly to mailto:<a href="/cdn-cgi/l/email-protection#3a4f494a554d5f487a575c4e17065b1a52485f5c07" http: energy.com">energy.com</a>">uspower@mft-<a href="http://energy.com">energy.com</a></a> Amie V. 
Colby, Troutman Pepper Hamilton Sanders LLP, 401 9th Street NW, Suite 
1000, Washington, DC 20004, <a href="/cdn-cgi/l/email-protection#70111d19155e131f1c12093004021f05041d111e5e131f1d"><span class="__cf_email__" data-cfemail="e0818d8985ce838f8c8299a094928f95948d818ece838f8d">[email&#160;protected]</span></a>, and AlbertaEx, 255 
5th Avenue SW, Suite 2675, Calgary, AB T2P 3G6, <a href="/cdn-cgi/l/email-protection#bad8dfd4d0dbd7d3d494d6cfd9d1c3fad8d2df97d9dbd4dbdedb94d9db"><span class="__cf_email__" data-cfemail="a1c3c4cfcbc0ccc8cf8fcdd4c2cad8e1c3c9c48cc2c0cfc0c5c08fc2c0">[email&#160;protected]</span></a>.
    A final decision will be made on the requested authorization after 
the environmental impacts have been evaluated pursuant to DOE's 
National Environmental Policy Act Implementing Procedures (10 CFR part 
1021) and after DOE evaluates whether the proposed action will have an 
adverse impact on the sufficiency of supply or reliability of the 
United States electric power supply system.
    Copies of this Application will be made available, upon request, by 
accessing the program website at <a href="https://www.energy.gov/gdo/pending-applications">https://www.energy.gov/gdo/pending-applications</a> or by emailing <a href="/cdn-cgi/l/email-protection#baffd6dfd9cec8d3d9d3cec394ffc2cad5c8cec9fad2cb94ded5df94ddd5cc"><span class="__cf_email__" data-cfemail="81c4ede4e2f5f3e8e2e8f5f8afc4f9f1eef3f5f2c1e9f0afe5eee4afe6eef7">[email&#160;protected]</span></a>.
    Signing Authority: This document of the Department of Energy was 
signed on August 15, 2024, by Maria Robinson, Director, Grid Deployment 
Office, pursuant to delegated authority from the Secretary of Energy. 
That document with the original signature and date is maintained by 
DOE. For administrative purposes only, and in compliance with 
requirements of the Office of the Federal Register, the undersigned DOE 
Federal Register Liaison Officer has been authorized to sign and submit 
the document in electronic format for publication, as an official 
document of the Department of Energy. This administrative process in no 
way alters the legal effect of this document upon publication in the 
Federal Register.

    Signed in Washington, DC, on August 21, 2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2024-19073 Filed 8-23-24; 8:45 am]
BILLING CODE 6450-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on August 26, 2024.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.