Marlow Hydro LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Licensing and a Deadline for Submission of Final Amendments
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
August 20, 2024
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 89 Issue 161 (Tuesday, August 20, 2024)</title>
</head>
<body><pre>
[Federal Register Volume 89, Number 161 (Tuesday, August 20, 2024)]
[Notices]
[Pages 67435-67436]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2024-18642]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-15331-001]
Marlow Hydro LLC; Notice of Application Tendered for Filing With
the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Licensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Minor License.
b. Project No.: 15331-001.
c. Date filed: July 31, 2024.
d. Applicant: Marlow Hydro LLC (Marlow Hydro).
e. Name of Project: Nash Mill Dam Hydroelectric Project.
f. Location: On the Ashuelot River, in town of Marlow, Cheshire
County, New Hampshire. The project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)--825(r).
h. Applicant Contact: Anthony B. Rosario, Marlow Hydro, 139
Henniker St, Hillsborough, NH, 03244; Phone at (603) 494-1854; or email
at <a href="/cdn-cgi/l/email-protection#21550c48444c615545520f4f4455"><span class="__cf_email__" data-cfemail="8afea7e3efe7cafeeef9a4e4effe">[email protected]</span></a>.
i. FERC Contact: Prabha Madduri at 202-502-8017, or
<a href="/cdn-cgi/l/email-protection#75050714171d1407141b1f141b1c5b1814111100071c35131007165b121a03"><span class="__cf_email__" data-cfemail="ddadafbcbfb5bcafbcb3b7bcb3b4f3b0bcb9b9a8afb49dbbb8afbef3bab2ab">[email protected]</span></a>.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
[[Page 67436]]
l. Deadline for filing additional study requests and requests for
cooperating agency status: September 30, 2024.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. For assistance, please contact FERC Online Support
at <a href="/cdn-cgi/l/email-protection#7f393a2d3c30111316111a2c0a0f0f100d0b3f191a0d1c51181009"><span class="__cf_email__" data-cfemail="90d6d5c2d3dffefcf9fef5c3e5e0e0ffe2e4d0f6f5e2f3bef7ffe6">[email protected]</span></a>, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, you may submit a paper
copy. Submissions sent via the U.S. Postal Service must be addressed
to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Debbie-
Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, MD 20852. All filings must clearly
identify the project name and docket number on the first page: Nash
Mill Dam Project (P-15331-001).
m. The application is not ready for environmental analysis at this
time.
n. The Nash Mill Project consists of the following existing
facilities: (1) a 57-foot-long, 9-foot-high, concrete gravity dam
topped with 3-foot-high collapsible wooden flashboards with a crest
elevation of 1,133.41 feet North American Vertical Datum 1988 (NAVD 88)
at the top of the flashboards; (2) a 2-acre impoundment; (3) an intake
structure on the north side of the dam equipped with a 10-foot-high by
10-foot-wide trash rack with 1-inch clear bar spacing; (4) a 4-feet-
diameter, 1,525-feet-long round steel penstock that trifurcates into
two 24-inch-diameter penstocks and one 4-foot-diameter pipe; (5) a 31-
foot-long by 18-foot-wide powerhouse that contains two vertical-shaft,
fixed propeller turbine-generator units and one horizontal-shaft
turbine-generator unit for a total installed capacity of 225 kilowatts;
(6) a 600-foot-long tailrace; (7) a 1,800-foot long bypassed reach (8)
a 0.48 kilovolt (kV), 75 kilo-volt-amperes transformer; (9) a 1,830-
foot-long, 12.5-kV transmission line; and (10) appurtenant facilities.
Marlow Hydro currently operates the project in a run-of-river mode.
The current license requires Marlow Hydro to release a continuous
minimum flow of 23 cubic feet per second (cfs) from the project as
measured downstream of the powerhouse, with a continuous flow of 5.2
cfs over the dam. From 2016 to 2020, average annual generation of the
Nash Mill Project was 552 megawatt-hours.
Marlow Hydro proposes to continue operating the project in a run-
of-river mode and would increase the bypass flow from 5.2 cfs to 14.5
cfs.
o. A copy of the application can be viewed on the Commission's
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-15331). For assistance, contact FERC
Online Support at <a href="/cdn-cgi/l/email-protection#3a7c7f687975545653545f694f4a4a55484e7a5c5f4859145d554c"><span class="__cf_email__" data-cfemail="460003140509282a2f282315333636293432062023342568212930">[email protected]</span></a> or call tollfree, (866)
208-3676 or (202) 502-8659 (TTY).
You may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595 or <a href="/cdn-cgi/l/email-protection#4a051a1a0a2c2f3829642d253c"><span class="__cf_email__" data-cfemail="eca3bcbcac8a899e8fc28b839a">[email protected]</span></a>.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary).. October 2024
Request for Additional Information...... October 2024
Issue Notice of Acceptance.............. January 2025
Issue Scoping Document 1 for comments... February 2025
Request Additional Information (if April 2025
necessary).
Issue Scoping Document 2 (if necessary). May 2025
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: August 14, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-18642 Filed 8-19-24; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on August 20, 2024.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.