Skip to main content
Notice2024-04177

Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions; Great River Hydro, LLC

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
February 29, 2024

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 89 Issue 41 (Thursday, February 29, 2024)</title>
</head>
<body><pre>
[Federal Register Volume 89, Number 41 (Thursday, February 29, 2024)]
[Notices]
[Pages 14819-14821]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2024-04177]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1892-030]


Notice of Application Accepted for Filing, Soliciting Motions To 
Intervene and Protests, Ready for Environmental Analysis, and 
Soliciting Comments, Recommendations, Preliminary Terms and Conditions, 
and Preliminary Fishway Prescriptions; Great River Hydro, LLC

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 1892-030.
    c. Date Filed: May 1, 2017; material amendment filed December 7, 
2020.
    d. Applicant: Great River Hydro, LLC (Great River Hydro).
    e. Name of Project: Wilder Hydroelectric Project (project).
    f. Location: The project is located on the Connecticut River in 
Orange and Windsor Counties, Vermont, and Grafton County, New 
Hampshire.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: John Ragonese, FERC License Manager, Great 
River Hydro, LLC, 40 Pleasant Street, Suite 202, Portsmouth, NH 03801; 
(603) 498-2851 or <a href="/cdn-cgi/l/email-protection#d9b3abb8beb6b7bcaabc99beabbcb8adabb0afbcabb1a0bdabb6f7bab6b4"><span class="__cf_email__" data-cfemail="8ce6feedebe3e2e9ffe9ccebfee9edf8fee5fae9fee4f5e8fee3a2efe3e1">[email&#160;protected]</span></a>.
    i. FERC Contact: Steve Kartalia, (202) 502-6131 or 
<a href="/cdn-cgi/l/email-protection#2e5d5a4b5e464b4000454f5c5a4f42474f6e484b5c4d00494158"><span class="__cf_email__" data-cfemail="205354455048454e0e4b415254414c494160464552430e474f56">[email&#160;protected]</span></a>.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
fishway prescriptions: 60 days from the issuance date of this notice; 
reply comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests, comments, recommendations, terms and 
conditions, and prescriptions using the Commission's eFiling system at 
<a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>.

[[Page 14820]]

Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must include your name and 
contact information at the end of your comments. For assistance, please 
contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#387e7d6a7b77565451565d6b4d4848574a4c785e5d4a5b165f574e"><span class="__cf_email__" data-cfemail="34727166777b5a585d5a51674144445b464074525146571a535b42">[email&#160;protected]</span></a>, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, you may submit a paper copy. Submissions sent via the U.S. 
Postal Service must be addressed to: Debbie-Anne A. Reese, Acting 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Room 1A, Washington, DC 20426. Submissions sent via any other carrier 
must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal 
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 
20852. The first page of any filing should include docket number P-
1892-030.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is ready for 
environmental analysis at this time.
    l. Project Description: The Wilder Project consists of: (1) a 
1,546-foot-long, 59-foot-high, concrete dam that includes: (a) a 400-
foot-long non-overflow, earthen embankment (north embankment); (b) a 
232-foot-long non-overflow, concrete bulkhead; (c) a 208-foot-long 
concrete forebay; (d) a 526-foot-long concrete, gravity spillway that 
includes: (i) six 30-foot-high, 36-foot-long tainter gates; (ii) four 
17-foot-high, 50-foot-wide stanchion flashboards; (iii) a 15-foot-high, 
20-foot-long skimmer gate (north gate); and (iv) a 10-foot-high, 10-
foot-long skimmer gate (south gate); and (e) a 180-foot-long non-
overflow, earthen embankment (south embankment); (2) a 45-mile-long, 
3,100-acre impoundment with a useable storage volume of 13,350 acre-
feet between elevations 380 and 385 feet National Geodetic Vertical 
Datum of 1929 (NGVD 29); (3) four approximately 25-foot-high, 20-foot-
wide trashracks with 5-inch clear bar spacing and one approximately 28-
foot-high, 20-foot-wide trashrack with 1.625-inch clear bar spacing; 
(4) a 181-foot-long, 50-foot-wide, 50-foot-high steel frame, brick 
powerhouse containing two 16.2-megawatt (MW) adjustable-blade Kaplan 
turbine-generator units and one 3.2-MW vertical Francis turbine-
generator unit for a total project capacity of 35.6 MW; (5) three 
concrete draft tubes ranging from 9.5 to 20.5 feet in diameter; (6) 
13.8-kilovolt generator leads that connect the turbine-generator units 
to two substation transformers; (7) an approximately 580-foot-long, 6-
foot-wide fishway; and (8) appurtenant facilities.
    Great River Hydro operates the project in a peaking mode in 
coordination with its downstream Bellows Falls Project No. 1855 and 
Vernon Project No. 1904. Average annual generation is approximately 
156,303 MW-hours. Great River Hydro is proposing changes to project 
operation that would reduce impoundment fluctuations and increase the 
stability of downstream flow releases relative to current project 
operation, including targeted water surface elevation levels and flow 
ramping rates. Great River Hydro also proposes several protection, 
mitigation, and enhancement measures for aquatic, terrestrial, 
cultural, recreation resources, and threatened and endangered species. 
The specific proposed changes are described in the amended application 
and the settlement agreement filed on August 4, 2022.
    m. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must: (1) bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions, or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed on the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#3b746b6b7b5d5e4958155c544d"><span class="__cf_email__" data-cfemail="b0ffe0e0f0d6d5c2d39ed7dfc6">[email&#160;protected]</span></a>.
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. The applicant must file no later than 60 days following the date 
of issuance of this notice: (1) a copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    p. Procedural Schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Deadline for filing motions to intervene,   April 2024.
 protests, comments, recommendations,
 preliminary terms and conditions, and
 preliminary fishway prescriptions.
Deadline for filing reply comments........  May 2024.
------------------------------------------------------------------------

    q. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.


[[Page 14821]]


    Dated: February 22, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-04177 Filed 2-28-24; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on February 29, 2024.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.