Notice2024-03924
PE Hydro Generation, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
February 27, 2024
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 89 Issue 39 (Tuesday, February 27, 2024)</title>
</head>
<body><pre>
[Federal Register Volume 89, Number 39 (Tuesday, February 27, 2024)]
[Notices]
[Pages 14472-14473]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2024-03924]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2391-053]
PE Hydro Generation, LLC; Notice of Application Accepted for
Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2391-053.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation, LLC.
e. Name of Project: Warren Hydroelectric Project.
f. Location: On the Shenandoah River near the Town of Front Royal
in Warren County, Virginia.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory
Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W,
Bethesda, MD 20814; Phone at (804) 382-1764 or email at
<a href="/cdn-cgi/l/email-protection#e3898c879acd908e8697a38682848f8680918686889186cd808c8e"><span class="__cf_email__" data-cfemail="f59f9a918cdb86989081b59094929990968790909e8790db969a98">[email protected]</span></a>.
i. FERC Contact: Kristine Sillett at (202) 502-6575, or
<a href="/cdn-cgi/l/email-protection#147f667d67607d7a713a677d787871606054727166773a737b62"><span class="__cf_email__" data-cfemail="b8d3cad1cbccd1d6dd96cbd1d4d4ddccccf8deddcadb96dfd7ce">[email protected]</span></a>.
j. Deadline for filing motions to intervene and protest: 60 days
from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests using the Commission's eFiling system
at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. For assistance, please
contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#185e5d4a5b57767471767d4b6d6868776a6c587e7d6a7b367f776e"><span class="__cf_email__" data-cfemail="4d0b081f0e0223212423281e383d3d223f390d2b283f2e632a223b">[email protected]</span></a>, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, you may submit a paper copy. Submissions sent via the U.S.
Postal Service must be addressed to: Debbie-Anne A. Reese, Acting
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify the project name and docket
number on the first page: Warren Hydroelectric Project (P-2391-053).
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted but is not ready for
environmental analysis.
l. The Warren Project consists of the following existing
facilities: (1) a 15.3-foot-high, 527-foot-long, reinforced concrete
dam; (2) a 105-acre impoundment with a storage capacity of 900 acre-
feet; (3) a 44-foot-wide headgate structure with four 4.5-foot by 8-
foot gates; (4) a 350-foot-long headrace canal; (5) an 82-foot-long,
30-foot-wide powerhouse containing 3 generating units with a total
installed capacity of 750 kW; (6) 360-foot-long, 2.4-kilovolt (kV)
project generator lines; (7) a substation containing a 3-phase, 2.4/
34.5-kV transformer where interconnection with the grid occurs; and (8)
other appurtenances. The project creates an approximately 550-foot-long
bypassed reach of the Shenandoah River.
The project operates in run-of-river mode with a minimum flow of 56
cubic feet per second provided by a 1-inch veil flow over the dam into
the bypassed reach. The project had an average
[[Page 14473]]
annual generation of 3,456 megawatt-hours between 2013 and 2017.
m. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>) using
the ``eLibrary'' link. Enter the docket number, excluding the last
three digits in the docket number field to access the document. For
assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#bef8fbecfdf1d0d2d7d0dbedcbceced1cccafed8dbccdd90d9d1c8"><span class="__cf_email__" data-cfemail="682e2d3a2b27060401060d3b1d1818071a1c280e0d1a0b460f071e">[email protected]</span></a>, or call (886)
208-3676 (toll free) or (202) 502-8659 (TTY).
You may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support. The Commission's Office of Public Participation (OPP)
supports meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members, and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595, or <a href="/cdn-cgi/l/email-protection#fab5aaaaba9c9f8899d49d958c"><span class="__cf_email__" data-cfemail="450a151505232037266b222a33">[email protected]</span></a>.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
Request Additional Information: February 2024
Issue Notice of Ready for Environmental Analysis: April 2024
Dated: February 20, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-03924 Filed 2-26-24; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on February 27, 2024.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.