Notice2023-26463
Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Alabama Georgia Connector Project
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
December 1, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 230 (Friday, December 1, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 230 (Friday, December 1, 2023)]
[Notices]
[Pages 83935-83936]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-26463]
[[Page 83935]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-194-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of
Availability of the Environmental Assessment for the Proposed Alabama
Georgia Connector Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the
Alabama Georgia Connector Project, proposed by Transcontinental Gas
Pipe Line Company, LLC (Transco) in the above-referenced docket.
Transco requests authorization from the Commission to provide customers
with firm access to 63,800 dekatherms per day of incremental natural
gas supply, increase overall system reliability, and add natural gas
infrastructure to meet growing demand in Georgia. To accomplish this,
Transco would construct and operate various modifications at five
existing compressor stations in Marengo and Randolph Counties, Alabama,
and Coweta, Henry, and Walton Counties, Georgia.
The EA assesses the potential environmental effects of the
construction and operation of the Alabama Georgia Connector Project in
accordance with the requirements of the National Environmental Policy
Act (NEPA). The FERC staff concludes that approval of the proposed
project, with appropriate mitigating measures, would not constitute a
major Federal action significantly affecting the quality of the human
environment.
The proposed Alabama Georgia Connector Projector includes the
following facilities:
<bullet> re-wheel two compressors at existing Compressor Station 90
(Marengo County, Alabama);
<bullet> upgrade two natural gas-fired turbines to add 3,685
horsepower (hp) at existing Compressor Station 110 (Randolph County,
Alabama);
<bullet> re-wheel three compressors at existing Compressor Station
115 (Coweta County, Georgia);
<bullet> replace a 12,000 hp electric compressor unit with a 22,500
hp electric compressor unit at existing Compressor Station 120 (Henry
County, Georgia); and
<bullet> re-wheel one compressor and increase the certificated hp
of a 9,000 hp electric compressor unit to 15,000 hp at existing
Compressor Station 125 (Walton County, Georgia).
Transco would also modify station piping within the compressor
stations listed above.
The Commission mailed a copy of the Notice of Availability to
Federal, State, and local government representatives and agencies;
elected officials; environmental and public interest groups; Native
American Tribes; potentially affected landowners and other interested
individuals and groups; and newspapers and libraries in the project
area. The EA is only available in electronic format. It may be viewed
and downloaded from the FERC's website (<a href="http://www.ferc.gov">www.ferc.gov</a>), on the natural
gas environmental documents page (<a href="https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents">https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents</a>). In addition, the EA
may be accessed by using the eLibrary link on the FERC's website. Click
on the eLibrary link (<a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>),
select ``General Search'' and enter the docket number in the ``Docket
Number'' field, excluding the last three digits (i.e. CP23-194). Be
sure you have selected an appropriate date range. For assistance,
please contact FERC Online Support at <a href="/cdn-cgi/l/email-protection#80c6e5f2e3cfeeece9eee5d3f5f0f0eff2f4c0e6e5f2e3aee7eff6"><span class="__cf_email__" data-cfemail="094f6c7b6a46676560676c5a7c7979667b7d496f6c7b6a276e667f">[email protected]</span></a> or
toll free at (866) 208-3676, or for TTY, contact (202) 502-8659.
The EA is not a decision document. It presents Commission staff's
independent analysis of the environmental issues for the Commission to
consider when addressing the merits of all issues in this proceeding.
Any person wishing to comment on the EA may do so. Your comments should
focus on the EA's disclosure and discussion of potential environmental
effects, reasonable alternatives, and measures to avoid or lessen
environmental impacts. The more specific your comments, the more useful
they will be. To ensure that the Commission has the opportunity to
consider your comments prior to making its decision on this project, it
is important that we receive your comments in Washington, DC on or
before 5:00 p.m. Eastern Time on December 27, 2023.
For your convenience, there are three methods you can use to file
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or <a href="/cdn-cgi/l/email-protection#4a0c2f382905242623242f193f3a3a25383e0a2c2f3829642d253c"><span class="__cf_email__" data-cfemail="1d5b786f7e5273717473784e686d6d726f695d7b786f7e337a726b">[email protected]</span></a>. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to
FERC Online. This is an easy method for submitting brief, text-only
comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the
link to FERC Online. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP23-
194-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Filing environmental comments will not give you intervenor status,
but you do not need intervenor status to have your comments considered.
Only intervenors have the right to seek rehearing or judicial review of
the Commission's decision. At this point in this proceeding, the
timeframe for filing timely intervention requests has expired. Any
person seeking to become a party to the proceeding must file a motion
to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the
Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time limitation should be waived.
Motions to intervene are more fully described at <a href="https://www.ferc.gov/how-intervene">https://www.ferc.gov/how-intervene</a>.
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (<a href="http://www.ferc.gov">www.ferc.gov</a>) using the eLibrary link. The eLibrary link
also provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission
[[Page 83936]]
processes. For public inquiries and assistance with making filings such
as interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595 or <a href="/cdn-cgi/l/email-protection#39766969795f5c4b5a175e564f"><span class="__cf_email__" data-cfemail="f4bba4a4b492918697da939b82">[email protected]</span></a>.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to
register for eSubscription.
Dated: November 27, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-26463 Filed 11-30-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on December 1, 2023.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.