RAMM Power Group, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
September 27, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 186 (Wednesday, September 27, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 186 (Wednesday, September 27, 2023)]
[Notices]
[Page 66442]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-21105]
[[Page 66442]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15248-000]
RAMM Power Group, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On November 18, 2021, RAMM Power Group LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Sacaton Energy
Storage Project (Sacaton Project or project) to be located in Pinal
County, Arizona. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed 150-megawatt (MW) closed-loop pumped storage project
would consist of the following: (1) an existing 1200-foot-deep open pit
mine for the lower reservoir, which will have a storage capacity of
1,500 acre-feet at a maximum water surface elevation of 455 feet above
mean sea level (msl); (2) an adjacent waste-rock dump for the upper
reservoir, which will have a storage capacity of 1,300 acre-feet at a
maximum water surface elevation of 1,456 feet msl; (3) a new 28-foot-
high, 6,000-foot long upper reservoir dam; (4) a single 200-foot-long,
12-foot-diameter steel penstock connecting the upper and lower
reservoirs; (5) a new underground powerhouse with two 75-MW pump/
turbine generating units; (6) a single 14-foot-dimeter low-pressure
draft tube that would extend approximately 2,200 feet from the
powerhouse to the lower reservoir; (7) a new 200-megavolt-ampere
substation located adjacent to the upper reservoir; and (8) a new
2,500-foot-long, 137-kilovolt transmission line connecting the new
substation to the grid interconnection at a transmission line owned by
Arizona Public Service. Initial fill water for the project would come
from the mine and purchased from existing water rights holders. The
proposed project would have an estimated average annual generation of
400,000 megawatt-hours.
Applicant Contact: Dr. Michael A. Werner, RAMM Power Group, 14575 S
Avenida Cucana, Sahuarita, Arizona 85629; phone: (509) 280-7486.
FERC Contact: Khatoon Melick, (202) 502-8433,
<a href="/cdn-cgi/l/email-protection#bad1d2dbced5d5d494d7dfd6d3d9d1fadcdfc8d994ddd5cc"><span class="__cf_email__" data-cfemail="d2b9bab3a6bdbdbcfcbfb7bebbb1b992b4b7a0b1fcb5bda4">[email protected]</span></a>.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#2c637c7c6c4a495e4f024b435a"><span class="__cf_email__" data-cfemail="1b544b4b5b7d7e6978357c746d">[email protected]</span></a>.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/eFiling.aspx">https://ferconline.ferc.gov/eFiling.aspx</a>. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#96d0d3c4d5d9f8fafff8f3c5e3e6e6f9e4e2d6f0f3e4f5b8f1f9e0"><span class="__cf_email__" data-cfemail="0a4c4f584945646663646f597f7a7a65787e4a6c6f7869246d657c">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15248-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at <a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>.
Enter the docket number (P-15248) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-21105 Filed 9-26-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on September 27, 2023.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.