Notice2023-18744
Spencer Mountain Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
August 30, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 167 (Wednesday, August 30, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 167 (Wednesday, August 30, 2023)]
[Notices]
[Pages 59900-59901]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-18744]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2607-016]
Spencer Mountain Hydropower, LLC; Notice of Application Accepted
for Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: 2607-016.
c. Date filed: June 26, 2023.
d. Applicant: Spencer Mountain Hydropower, LLC.
e. Name of Project: Spencer Mountain Hydroelectric Project (Spencer
Mountain Project).
f. Location: On the South Fork Catawba River, near the town of
Gastonia, in Gaston County, North Carolina.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Kevin Edwards and Mrs. Amy Edwards,
Spencer Mountain Hydropower, LLC, 916 Comer Rd, Stoneville, NC 27048;
Phone at (336) 589-6138, or <a href="/cdn-cgi/l/email-protection#8af9e7e2f3eef8e5cafae2febba4e9e5e7"><span class="__cf_email__" data-cfemail="dfacb2b7a6bbadb09fafb7abeef1bcb0b2">[email protected]</span></a>.
i. FERC Contact: Michael Spencer at (202) 502-6093, or
<a href="/cdn-cgi/l/email-protection#a4c9cdc7ccc5c1c88ad7d4c1cac7c1d6e4c2c1d6c78ac3cbd2"><span class="__cf_email__" data-cfemail="b7daded4dfd6d2db99c4c7d2d9d4d2c5f7d1d2c5d499d0d8c1">[email protected]</span></a>.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. For assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#286e6d7a6b67464441464d7b5d5858475a5c684e4d5a4b064f475e"><span class="__cf_email__" data-cfemail="0a4c4f584945646663646f597f7a7a65787e4a6c6f7869246d657c">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. All filings must clearly identify the project name and
docket number on the first page: Spencer Mountain Project (P-2607-016).
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted but is not ready for
environmental analysis at this time.
l. The existing Spencer Mountain Project consists of the following
existing facilities: (1) a 12-foot-high, 636-foot-long masonry and
rubble dam with a crest elevation of 634.7 feet mean sea level (msl);
(2) a 68-acre reservoir with a storage capacity of 166 acre-feet; (3) a
58.9-foot-long canal headwork, consisting of four 6-foot-wide gates;
(4) a 53.8-foot-long canal spillway connected to the downstream side of
the canal headwork; (5) a 30-foot-wide, 10-foot-deep, 3,644-foot-long
open earthen canal; (6) a 32-foot-wide trashrack at the powerhouse
forebay with a 2.5-inch
[[Page 59901]]
clear bar-space; (7) a 36-inch-diameter bypass pipe; (8) a 22.5-foot-
high, 49.5-foot-long, 48.75-foot-wide powerhouse containing two
Francis-type generating units with a total capacity of 0.64 megawatts;
(9) a concrete lined tailrace discharging flows back into the South
Fork Catawba River; (10) a substation containing a 2.3/44-kilovolt (kV)
transformer and interconnection to Duke Energy's 44 kV transmission
line; and (11) appurtenant facilities.
The project operates in a run-of-river mode with a minimum bypass
flow of 76 cubic feet per second. Spencer Mountain Hydropower, LLC
proposes no changes to the project facilities or operations. The
project has an average annual generation of 4,064 megawatt-hours.
m. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#55131007161a3b39393c3b30062025253a272115333027367b323a23"><span class="__cf_email__" data-cfemail="276162756468494b4b4e494274525757485553674142554409404851">[email protected]</span></a> or call toll-free, (886) 208-3676 or TTY,
(202) 502-8659.
You may also register online at <a href="https://www.ferc.gov/docs-filing/esubscription.asp">https://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Scoping Document 1 for comments..... September 2023.
Scoping Document 1 comments due........... October 2023.
Request Additional Information (if November 2023.
necessary).
Issue Scoping Document 2 (if necessary)... November 2023.
Issue Notice of Ready for Environmental January 2024.
Analysis.
------------------------------------------------------------------------
Dated: August 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-18744 Filed 8-29-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on August 30, 2023.